| 1 | Part A- Cost of Materials for 11KV Cut Point With 180 Degree Angle - 2 No. |
| 2 | Supply and Installation of 10 Mtr. long 330 Kg PSC Pole Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC. |
| 3 | Supply & installation of PSC Pole Clamp (GI). Complete in all respect as per the approved technical specification and direction of EIC. |
| 4 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 2no's channel(GI) required =( 2x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 5 | Supply & installation of Fish Plate(GI) 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,8 no's required =(8x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 6 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel(GI) length 0.306 mtr. 2no's channel(GI) required =(2x9.56x0.306). Complete in all respect as per the approved technical specification and direction of EIC. |
| 7 | Supply and installation of Danger Plate,1 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 8 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 9 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 10 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 11 | Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 12 | Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the specification and direction of EIC. |
| 13 | Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 14 | Supply & installation of Earthing of support(Coil Type). Complete in all respect as per the approved technical specification and direction of EIC. |
| 15 | Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr- 2Mtr for connecting pole with coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 16 | Supply & installation of NON METALLIC TIES-11KV 55SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 17 | Supply & installation of IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 18 | Supply & installation of Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 19 | Supply & installation of GI Nut, Bolt & Washer of different sizes (3.55 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 20 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 21 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 22 | Part A- Cost of Civil Works. |
| 23 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1667mm) = 0.42Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 24 | Part B- Cost of Materials for 11 KV Cut Point with 90 Degree Angle- 2 No. |
| 25 | Supply and Installation of 10 Mtr. long 330 Kg PSC Pole Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC. |
| 26 | Supply & installation of PSC Pole Clamp (GI). Complete in all respect as per the approved technical specification and direction of EIC. |
| 27 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 4no's channel(GI) required =( 4x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 28 | Supply & installation of Fish Plate(GI) 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,16 no's required =(16x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC. |
| 29 | Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel(GI) length 0.306 mtr. 4no's channel(GI) required =(4x9.56x0.306). Complete in all respect as per the approved technical specification and direction of EIC. |
| 30 | Supply and installation of Danger Plate,1 no's. Complete in all respect as per the approved technical specification and direction of EIC. |
| 31 | Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 32 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 33 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 34 | Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 35 | Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the approved technical specification and direction of EIC. |
| 36 | Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 37 | Supply & installation of Earthing of support(Coil Type). Complete in all respect as per the approved technical specification and direction of EIC. |
| 38 | Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr- 2Mtr for connecting pole with coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 39 | Supply & installation of NON METALLIC TIES-11KV 55SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 40 | Supply & installation of IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV. Complete in all respect as per the approved technical specification and direction of EIC. |
| 41 | Supply & installation of Spike (GI ) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 42 | Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 43 | Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC. |
| 44 | Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC. |
| 45 | Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC. |
| 46 | Supply & installation of GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 47 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 48 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 49 | Part B- Cost of Civil Works. |
| 50 | Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard as per the direction of EIC. |
| 51 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1667mm) = 0.42Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 52 | Part C- Cost of Materials for 11 KV Pin Points With PSC Pole - 0.33CKM. |
| 53 | Supply and Installation of 10 Mtr. long 330 Kg PSC Pole Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC. |
| 54 | Supply & installation of PSC Pole Clamp (GI). Complete in all respect as per the approved technical specification and direction of EIC. |
| 55 | Supply & installation of 11KV V cross Arm(GI) (10.2 Kg. each). Complete in all respect as per the approved technical specification and direction of EIC. |
| 56 | Supply & installation of Top bracket 100x50X6 mm Gl channel (2kg each).Complete in all respect as per the approved technical specification and direction of EIC. |
| 57 | Supply & installation of Danger Plate,1 no's. for each pole. Complete in all respect as per the approved technical specification and direction of EIC. |
| 58 | Supply & installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's =(1x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 59 | Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 60 | Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr Iength 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 61 | Supply & installation of 11 KV pin insulator polymer, 3 Nos. required for each support. Complete in all respect as per the approved technical specification and direction of EIC. |
| 62 | Supply & installation of Earthing of Support Coil Type. Complete in all respect as per the approved technical specification and direction of EIC. |
| 63 | Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing. Complete in all respect as per the approved technical specification and direction of EIC. |
| 64 | Supply & installation of GI Nut, Bolt & Washer of different sizes (1.45 Kg/ Pin Point). Complete in all respect as per the approved technical specification and direction of EIC. |
| 65 | Supply & Stringing of 55 SQ.MM XLPE Insulated AAA conductor . Complete in all respect as per the approved technical specification and direction of EIC. |
| 66 | Supply & installation of NON METALLIC TIES-11KV 55SQMM CVRD AAAC.Complete in all respect as per the approved technical specification and direction of EIC. |
| 67 | Supply & installation of Spike (GI) (using 50x6mm Flat(GI) welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole ). Complete in all respect as per the approved technical specification and direction of EIC. |
| 68 | Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC. |
| 69 | Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC. |
| 70 | Part C- Cost of Civil Works. |
| 71 | Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1667mm) = 0.42Cu.mtr(per Pole). Complete in all respect as per the direction of EIC. |
| 72 | Part D- Cost of meterial for Pole mounted DSS - 01 Nos |
| 73 | Supply and Installation of 10 Mtr. long 330 Kg PSC Pole Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC. |
| 74 | Supply & installation of PSC Pole Clamp (GI). Complete in all respect as per the approved technical specification and direction of EIC. |
| 75 | Supply and Installation of Top Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 76 | Supply and Installation of Fish plate(GI) 50x6, 2.36kg/mtr ,each 0.280mtr length, 6 no's required = (6x2.36x0.280) . Complete in all respect as per the approved technical specification and direction of EIC. |
| 77 | Supply and Installation of AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg).Complete in all respect as per the approved technical specification and direction of EIC. |
| 78 | Supply and Installation of AB Switch Side Support Channel(GI) 100X50X6mm,9.56KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =(9.56x2x0.35). Complete in all respect as per the approved technical specification and direction of EIC. |
| 79 | Supply and Installation of Channel(GI) Support for down Pipe 75X40X 4.8mm. 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1). Complete in all respect as per the approved technical specification and direction of EIC. |
| 80 | Supply and Installation of HG/ DO Fuse Mounting Channel(Gl) 75x40x4.8 mm Gl Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14 = 42.84 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 81 | Supply and Installation Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 82 | Supply and Installation of Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 83 | Supply and Installation of Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg/Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg). Complete in all respect as per the approved technical specification and direction of EIC. |
| 84 | Supply and Installation Transformer Base Support GI Channel(GI) 100X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 85 | Supply and Installation Transformer Belting Angle(Gl) 50 X 50 X 6 MM GI (3000 mm long) (4.5Kg./Mtr., 2 No's) (Each 2x3.0x4.5 Kg) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 86 | Supply and Installation Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg/Mtr,2 No's) (Each 2x0.580x4.5= 5.22Kg) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 87 | Supply and Installation LTDB Mounting Angel(GI) 50 x 50 x 6 MM GI (1000 mm long) (4.5Kg / Mtr, 2 no's) (Each 2x1x4.5 Kg) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 88 | Supply and Installation of 50x6mm Flat(Gl) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) (Each 65.6x 2.36= 154.81 Kg) .Complete in all respect as per the approved technical specification and direction of EIC. |
| 89 | SITC of TRANSFORMER 63KVA, 11/0.4 KV(AL) , BIS Energy Loss level II. Complete in all respect as per the approved technical specification and direction of EIC. |
| 90 | SITC of LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 63 KVA S/S. Complete in all respect as per the approved technical specification and direction of EIC. |
| 91 | SITC of 55 SQ.MM. AAAC XLPE Covered Conductor.Complete in all respect as per the approved technical specification and direction of EIC. |
| 92 | SITC of 4 Cx95 mm2 LT XLPE Cable(Armoured) - FOR 63 KVA Trf.Complete in all respect as per the approved technical specification and direction of EIC. |
| 93 | SITC of AB Switch (11KV,200A,3pole,50Hz). Complete in all respect as per the approved technical specification and direction of EIC. |
| 94 | SITC of H.G.Fuse( 11KV,200A,3Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 95 | Supply and Installation of WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR. Complete in all respect as per the approved technical specification and direction of EIC. |
| 96 | Supply and Installation of POLYCARBONATE BIRD GUARD. Complete in all respect as per the approved technical specification and direction of EIC. |
| 97 | Supply and Installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 98 | Supply and Installation of HW Fitting(B&S)70KN, 3Bolt. Complete in all respect as per the approved technical specification and direction of EIC. |
| 99 | SITC of Lightning Anester(12KV,10KA) (Station Class, class-2). Complete in all respect as per the approved technical specification and direction of EIC. |
| 100 | Supply and Installation of 11 KV pin insutator polymer. Complete in all respect as per the approved technical specification and direction of EIC. |
| 101 | Supply and Installation of HT Stay set complete.Complete in all respect as per the approved technical specification and direction of EIC. |
| 102 | Supply and Installation of HT stay clamp(1.9kg/pair). Complete in all respect as per the approved technical specification and direction of EIC. |
| 103 | Supply and Installation of H.T. stay insulater Type-C .Complete in all respect as per the approved technical specification and direction of EIC. |
| 104 | Supply and Installation of 7/10 swg GI Stay wire, Grade- 2 (15Kg/Set). Complete in all respect as per the approved technical specification and direction of EIC. |
| 105 | Supply and Installation of 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 106 | Supply and Fixing of GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP). Complete in all respect as per the approved technical specification and direction of EIC. |
| 107 | Supply and Installation of GI Barbed wire/ Anticlimbing device (3Kg /Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 108 | Supply and Installation of Black Clamp for anticlimbing device 25x3 mm. Flat(GI), 0.59Kg /Mtr. Flat(GI)) of 0.510mtr length 8 no's= (8x0.59x0.510).Complete in all respect as per the approved technical specification and direction of EIC. |
| 109 | Supply and Installation of Danger plate 11 KV,2 nos .Complete in all respect as per the approved technical specification and direction of EIC. |
| 110 | Supply and Installation of Back clamp for danger plate 25x3mm, Flat(GI) 0.59kg/mtr, Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC. |
| 111 | Supply and Installation of Name Plate. Complete in all respect as per the approved technical specification and direction of EIC. |
| 112 | Structure Numbering and Marking |
| 113 | Supply and Painting of Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background as per the direction of EIC. |
| 114 | Supply and Painting of Black Paint(GIS Numbering & Zebra Stripping) for numbering as per the direction of EIC. |
| 115 | Pat -D : Cost of Civil Work |
| 116 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1700mm) =0.425Cu.mtr (Per Pole) (For 10 Mtr PSC Pole DP).Complete in all respect as per the direction of EIC. |
| 117 | PCC ratio 1:3:6(M-10 Grade) For DSS Area (5 x3x0.1)=1.5 Cu. mtr.Complete in all respect as per the direction of EIC. |
| 118 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx 600mmx900mm) using 40mm BHG metal with all labor and material except stay set, stay wire, stay insulator.Complete in all respect as per the direction of EIC. |
| 119 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr Gl Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC. |
| 120 | Laying of 4 Cx 95 mm2 LT XLPE Cable.Complete in all respect as per direction of EIC. |
| 121 | SITC and Erection of GI Fencing with Gate.Complete in all respect as per the approved specification and direction of EIC. |
| 122 | Supply of AL Lugs suitable for 95 sq mm cable/conductor,Crimping with cable and Fixing/ connecting include supply and erection of PVC Tape as per voltage requirement.Complete in all respect as per the approved specification and direction of EIC. |
| 123 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 50-95sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells.Complete in all respect as per the direction of EIC. |
| 124 | Part E- Cost of meterial for Line protecting Guarding for road crossing |
| 125 | Supply and Installation of Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr,, each Channe(GI) length 2.2 mtr., 4 no's Channel(Gl) required =( 4x7.14x2.2) ( For Single Pole). Complete in all respect as per the approved technical specification and direction of EIC. |
| 126 | Supply and Installation of No-6 GI wire (0.192 kg/mtr.) for Main String.Complete in all respect as per the approved technical specification and direction of EIC. |
| 127 | Supply and Installation of No-8 GI wire (0.131 kg/mtr.) for lacing.Complete in all respect as per the approved technical specification and direction of EIC. |
| 128 | Supply and Installation of Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.). Complete in all respect as per the approved technical specification and direction of EIC. |
| 129 | Supply and Installation of GI pipe earthing 40mm ,3mtr long. Complete in all respect as per the approved technical specification and direction of EIC. |
| 130 | Supply and Installation of 50x6mm,Flat(GI) for earthing, 2.36kg/mtr,(10.7 meter for rising) =10.7x2.36 .Complete in all respect as per the approved technical specification and direction of EIC. |
| 131 | Part -E : Cost of Civil Work |
| 132 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powdercalculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC. |
| 133 | N.B: The bidders are required to Quote theire rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. Please Enable Macros to View BoQ information |