|
| 1 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area |
| 2 | Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. |
| 3 | Earthwork in excavation in over areas in saturated soil upto a depth of 0.6m including pumping and bailing out water and disposing of excavated soil lead upto 20 m and lift upto 1.5 m. Disposed soil to be neatly dressed and levelled. |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. |
| 5 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: |
| 6 | All works upto plinth level |
| 7 | In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. |
| 8 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. |
| 9 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level |
| 10 | Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: |
| 11 | All works upto plinth level |
| 12 | Centering & shuttering including Strutting, Propping & removal of forms for : |
| 13 | Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like |
| 14 | Providing weep holes of clear size 15 cms high and 8 cms wide in concrete walls as per drawing and direction of engineer in charge with 30 cms thick jungle wood planks to form a box of clear dimensions of the weep hole and keeping the same in position with a slope of about 1 verticle to 20 horizontal towards drainage face while laying the concrete complete. |
| 15 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) |
| 16 | Refilling the pipeline/foundation trenches plinth sides foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. Please Enable Macros to View BoQ information |