| 1 | Supply, Installation, testing and commissioning of Diesel Engine with rated capacity of 910 KVA to 1010 KVA at 0.8 P.F of Power Out Put of 808 KW, 1500 RPM. 4 stroke, multicylinder coupled to brush less type 415 Volts 50 cycle/second self exited alternator completed with cushy pads, Silencer, Injectors, Advance Gensets Controller suitable for AMF operation, Alternator auxiliaries, Electronic Governor, 24 volts chargeable battery, as per specification attached. The DG Sets shall be SILENT TYPE, RADIATOR COOLED, With standard Acoustic Enclosure. |
| 2 | Standard Drop Down Acoustic Enclosure for 1010 and 1500 kVA DG Set with an insertional loss of 25dB(A) at 1 Meter Distance, as per CPCB Norms/ Guidelines ( Diesel tank and Pane(if any)l to be kept outside the Enclosure ) |
| 3 | 1010 kVA DG Isolator Panel, Alternator top mounted,( Protection and CT not available) |
| 4 | Extension of Bus Bar and related works |
| 5 | Synchronization panel for 1010 KVA DG and 500 KVA Existing DG set |
| 6 | Supply & laying of 400 sq.mm 3.5 core Aluminium armoured XLPE power cable |
| 7 | Supply & Fixing of Double compression type cable termination gland, lugs etc |
| 8 | Supply, Installation, testing and commissioning of following sizes of MS 'B\\" Class Exhaust pipe with 50 MM thick insulation with rockwool density-64 kg/m3 and 24-gauge aluminium cladding with all required accessories. This will also include all bends, flanges, Bellows, hardware’s, nuts bolts & Gaskets, etc..Exhaust chimney height will be around 30 Mtrs. from FGL, since DG installation is on ground near to building. M.S. 'B' Class Pipe 14\\" / 350 mm dia. Bends shall be measured and billed for 2 Times of Straight Length |
| 9 | Exhaust pipe thermal insulation and cladding for 14\\"/350 mm dia pipe (Considered Rockwool insulation of density 64 kG/m3 with 50mm thick bound with GI chicken wire mesh & 24 swg Al sheet). Bends shall be measured and billed for 2 Times of Straight Length |
| 10 | Installation of Silencer |
| 11 | Silencer Insulation (Rockwool insulation of density 64 kG/m3 with 50mm thick bound with GI chicken wire mesh & 24 swg Al sheet)Exhaust Pipe Supporting structure: Supply, Installation of self supporting MS structure with single coat of red Oxide and double coat of enamel paint.Exhaust pipe supporting structure shall be AS PER OUR STANDARD DESIGN AND SPEC |
| 12 | M.S Supports for Exhaust Stack, cable trays, Fuel pipes using ISA / ISMC. Supports shall be Duly Cleaned with Brush follwed by One Coat of Primer and Two Coats of Synthetic Enamel Paint / Aluminium Paint - for 4 DG |
| 13 | Lightning Arrestor - Conventional - Spike and Sphere Type |
| 14 | 25 x 3 CU Strip for LA earthing with insulators |
| 15 | CU Earth pit for Lightening Arrestor earthing(600x600x3.15mm Cu Plate, 3 Mtrs of Dia 40 mm GI B Class Pipe, 2 Runs of 25x3 Cu strip & Funnel arrangement) |
| 16 | Aviation Lamp - LED Type |
| 17 | 3C x 2.5 sqmm Armd. Multistrand XLPE insulated Cu Cable |
| 18 | End Termination for above cable |
| 19 | Junction Box 2P 6A |
| 20 | Installation of Day Tank. MS 990 ltrs day tank 3 mm thick single wall supplied along with the DG set |
| 21 | Dia 1.5\\" M.S. ERW 'C' Class Pipe, Pipe shall be duly cleaned with wire brush & coated with 1 coat of primer & 2 coats of synthetic enamel paint |
| 22 | DG Pump and Panel |
| 23 | Installation of buffer Tank. MS 550 ltrs buffer tank 3 mm thick single wall |
| 24 | 100 x 10 mm GI for DG body & Panel Earthing |
| 25 | 75 x 10 CU Strip for Neutral Earthing |
| 26 | CU Earth pit for Neutral earthing |
| 27 | GI Earth pit for Body earthing |
| 28 | Unloading and Positioning of DG Set Ground floor - Single Handling by Crane |
| 29 | Design Charges - Structure design must be provided by supplier. Foundation and Foundation design to be taken care by the customer depends on site SBC |
| 30 | Unloading of the Low side items |
| 31 | Scaffolding charges |
| 32 | Civil works and yard Extension |
| 33 | Liasoning Charges towards Obtaining CEIG approvals, Fees Payable to Department to be borne by Customer at Actuals for one set |
| 34 | Obtaining PCB approvals [Liasoning charges] excluding departmental fees to be paid Please Enable Macros to View BoQ information |