Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Supply and Mixing Calcium based granular disinfectant for water treat ment drinking water with 60 - 70 % chlorine contents by volume conforming to IS-15738 in sealed plastic containers of 45 kg , as required on monthly basis with manufacturer's chlorine test certificate and manufacturer's date marked not more than 02 week old, complete all as specified and directed.NOTES:- (i) Approval of chemical (Calcium granular) shall be given after verification of test certificates of chemical of various manufactures and other factors like chemical and safety and health hazard aspects of usage of chlorination(ii) The brand/make of the chlorination of chemical must be stated before procurement and certified by govt laboratory that it is free from the technical strength stahbility health safety and operation point of view this product is ued for drinking water applications for consumption by humans and the brand /make of calcium hypochlorite is suitable for drinking water chlorination and its sample has been tested by Govt Laboratory. |
| 2 | Supply and Mixing liquid chlorine sodium hypochlorite drinking water with 6% chlorine contents by volume conforming to IS-11673 in sealed non-chemical reactine/ oxidation LDPE continers of 6 kg PVC tanks, as required on monthly basis with manufacturer's chlorine test certificate and manufacturer's date marked not more than 02 week old , complete all as specified and directed.NOTES:- (i) Approval of chemical (sodium hypochlorite) shall be given after verification of test certificates of chemical of various manufactures and other factors like chemical and safety and health hazard aspects of usage of chlorination(ii) The brand/make of the chlorination of chemical must be stated before procurement and certified by govt laboratory that it is free from the technical strength stahbility health safety and operation point of view this product is ued for drinking water applications for consumption by humans and the brand /make of calcium hypochlorite is suitable for drinking water chlorination and its sample has been tested by Govt Laboratory. |
| 3 | Supply and Mixing TCCA-90 disinfectant for water treat ment drinking water with 90 % chlorine contents by volume conforming to IS-15773 in sealed plastic containers of 50 kg , as required on monthly basis with manufacturer's chlorine test certificate and manufacturer's date marked not more than 02 week old , complete all as specified and directed.NOTES:- (i) Approval of chemical (Calcium granular) shall be given after verification of test certificates of chemical of various manufactures and other factors like chemical and safety and health hazard aspects of usage of chlorination(ii) The brand/make of the chlorination of chemical must be stated before procurement and certified by govt laboratory that it is free from the technical strength stahbility health safety and operation point of view this product is ued for drinking water applications for consumption by humans and the brand /make of calcium hypochlorite is suitable for drinking water chlorination and its sample has been tested by Govt Laboratory. |
| 4 | Supply and Mixing Bleaching Powder disinfectant for water treat ment drinking water with 33- 35 % chlorine contents by volume conforming to IS- 15738 in sealed plastic containers of 25 kg , as required on monthly basis with manufacturer's test certificate and manufacturer's date marked not more than 03 week old , complete all as specified and directed.NOTES:- (i) Approval of chemical shall be given after verification of test certificates of chemical of various manufactures and other factors like chemical and safety and health hazard aspects of usage of chlorination(ii) The brand/make of the chlorination of chemical must be stated before procurement and certified by govt laboratory that it is free from the technical strength stahbility health safety and operation point of view this product is ued for drinking water applications for consumption by humans and the brand /make of calcium hypochlorite is suitable for drinking water chlorination and its sample has been tested by Govt Laboratory. |
| 5 | Supply and Mixing Poly Ferric Aluminium Chloride disinfectant for water treat ment swimming pool /STP water with 5 % chlorine contents by volume conforming to IS- 1113 in HDPE Bag of 25 kg , as required on monthly basis with manufacturer's test certificate and manufacturer's date marked not more than 03 week old , complete all as specified and directed.NOTES:- (i) Approval of chemical (Ferric Aluminium Chloride) shall be given after verification of test certificates of chemical of various manufactures and other factors like chemical and safety and health hazard aspects of usage of Ferric Aluminium Chloride(ii) The brand/make of the Ferric Aluminium Chloride of chemical must be stated before procurement and certified by govt laboratory that it is free from the technical strength stahbility health safety and operation point of view this product is ued for drinking water applications for consumption by humans and the brand /make of Ferric Aluminium Chloride is suitable for swimming pool water and its sample has been tested by Govt Laboratory. |
| 6 | Supply and Mixing Soda Ash for water treat ment r with 99% Sodium carbonate contents by volume conforming to IS-251 in HDPE bag of 50 kg , as required on monthly basis with manufacturer's test certificate and manufacturer's date marked not more than 03 week old , complete all as specified and directed.NOTES:- (i) Approval of chemical (Calcium granular) shall be given after verification of test certificates of chemical of various manufactures and other factors like chemical and safety and health hazard aspects of usage of chlorination(ii) The brand/make of the chlorination of chemical must be stated before procurement and certified by govt laboratory that it is free from the technical strength stahbility health safety and operation point of view this product is ued for drinking water applications for consumption by humans and the brand /make of calcium hypochlorite is suitable for drinking water chlorination and its sample has been tested by Govt Laboratory. |
| 7 | Supply and Mixing HCL ( Hydrochloric Acid) for water treat ment swimming pool water with 30 % Acidity contents by volume conforming to IS- 265 in sealed plastic containers of 55 kg , as required on monthly basis with manufacturer's test certificate and manufacturer's date marked not more than 03 week old , complete all as specified and directed.NOTES:- (i) Approval of chemical shall be given after verification of test certificates of chemical of various manufactures and other factors like chemical and safety and health hazard aspects of usage of HCL(ii) The brand/make of the HCL of chemical must be stated before procurement and certified by govt laboratory that it is free from the technical strength stahbility health safety and operation point of view this product is ued for swimming pool water applications for consumption by humans and the brand /make of HCL is suitable for swimming pool water and its sample has been tested by Govt Laboratory. |
| 8 | Supply and Mixing Copper sulphate crystal for water treat ment swimming pool water with contents by volume conforming to IS- 261 in sealed HDPE Bag of 25-50 kg , as required on monthly basis with manufacturer's test certificate and manufacturer's date marked not more than 03 week old , complete all as specified and directed.NOTES:- (i) Approval of chemical shall be given after verification of test certificates of chemical of various manufactures and other factors like chemical and safety and health hazard aspects of usage of Copper sulphate(ii) The brand/make of the Copper Sulphate of chemical must be stated before procurement and certified by govt laboratory that it is free from the technical strength stahbility health safety and operation point of view this product is ued for swimming pool water applications by humans and the brand /make of Copper Sulphate is suitable for swimming pool water and its sample has been tested by Govt Laboratory. |
| 9 | M & L for Sluice valve Class PN-1.6 cast iron body with forged steel spindle, non rising type, with cast iron wheel head, both end flanged, ISI marked for 150 mm bore including neoprene rubber gasket, nuts, bolts, washer etc complete all as specified & directed by Engineer-in-Charge. |
| 10 | M & L for Sluice valve Class PN-1.6 cast iron body with forged steel spindle, non rising type, with cast iron wheel head, both end flanged, ISI marked for 100 mm bore including neoprene rubber gasket, nuts, bolts, washer etc complete all as specified & directed by Engineer-in-Charge. |
| 11 | S & F, Connecting & testing new generation energy saving & environmental friendly long life versatile, pressure die-cast aluminium IP-66 protection LED street light fitting not less than 90 Watt on existing street pole including painting one coat of existing pole and street light bracket with existing colour and replacement unserviceable 3 core PVC unsheathed copper wire from existing junction box up to street light fitting complete all as specified & directed by Engineer-in-Charge.Make : Havell's Cat Part No. ENDURACITILINERNEOSL 90WLED757SASYBOTG / Crompton Cat Part No. LSTP90CDL or Bajaj Cat No: BRLEP90WLEDV2 |
| 12 | M & L in repair for Gun Metal Gate Valve with iron wheel head, screwed both ends for iron of size 20 mm size complete all as specified & directed. |
| 13 | M & L in repair for Gun Metal Gate Valve with iron wheel head, screwed both ends for iron of size 25 mm size complete all as specified & directed. |
| 14 | M & L in repair for MCCB 4 pole 415 Volts 250 Amps having breaking capacity 36 KA with adjustable thermal magnetic release including taking down old unserviceable MCCB complete all as specified & directed. |
| 15 | M & L in repair for MCCB 4 pole 415 Volts 200 Amps having breaking capacity 36 KA with adjustable thermal magnetic release including taking down old unserviceable MCCB complete all as specified & directed. |
| 16 | M & L in repair for MCCB 4 pole 415 Volts 160 Amps having breaking capacity 25 KA with fixed thermal magnetic release including taking down old unserviceable MCCB complete all as specified & directed. |
| 17 | M & L in repair for Gate valve 40 mm dia with butterfly handle steel spindle confirming to IS : 13095 complete all as specified & directed. |
| 18 | M & L in repair for Gate valve 50 mm dia with butterfly handle steel spindle confirming to IS : 13095 complete all as specified & directed. |
| 19 | M & L in repair for Gate valve 65 mm dia with butterfly handle steel spindle confirming to IS : 13095 complete all as specified & directed. |
| 20 | M & L in repair for Gate valve 80 mm dia with butterfly handle steel spindle confirming to IS : 13095 complete all as specified & directed. |
| 21 | M & L in repair for Single phase preventer model VSP-2, 415Volt, three phase, 50 Hz AC complete all specified & directed. |
| 22 | M & L in repair for MCB TPN 415 Volt, 63 Amps, B Curve, 10KA breaking capacity complete all as specified & directed. |
| 23 | M & L in repair for MCB TP 415 Volt, 32 Amps, B Curve, 10KA breaking capacity complete all as specified & directed. |
| 24 | M & L in repair for MCB TP 415 Volt, 16 Amps, B Curve, 10KA breaking capacity complete all as specified & directed. |
| 25 | M & L in repair for MCB SP 6-32 Amps, 230 Volts, B Curve, breaking kapacity of 10 KA complete all as specified & directed. |
| 26 | M&L in repair for replacement of Butterfly valve ISI Marked with iron wheel 25 mm bore complete with necessary fittings as required at site complete including taking down old unserviceable valve all as specified and as directed. |
| 27 | Description same as per srl item No. 28 herein before but size of butterfly valve 40 mm bore. |
| 28 | Description same as per srl item No.28 herein before but size of butterfly valve 50 mm bore. |
| 29 | Description same as per srl item No. 28 herein before but size of buttterfly valve 80 mm bore. |
| 30 | Description same as per srl item No. 28 herein before but size of butterfly valve 100 mm bore. |
| 31 | Description same as per srl item No. 28 herein before but size of butterfly valve 150 mm bore. |
| 32 | Taking out by raising or Lowering of non-clog sewage submersible pump set of 01 HP of Make : KIRLOSKAR with the help of chain pully block from sewage sump after disconnecting electric and sewage coupling connections, dismantling pump and motor and carrying out for repair / replecement of defective parts, cleaning of impeller and volute casing, clogged discharge line. Reassembling, painting the pump set and re-installation by lowering into sewage sump connecting up complete and testing all running parameters all as directed by Engineer-in-Charge.(Replacement of defective parts and Dewatering will be paid saperately under respective Item of BOQ 36 to 36.15) Note : Contractor has to make necessary arrangement for pumping of sewage effluents from sump well as long as pump remains under repair / rewinding by fitting his own pump including other T&P etc will be brought by contractor. |
| 33 | Re-winding of three phase, 415 Volt electric motor of capacity 01 HP of non-clog submersible pumps of Make : KIRLOSKAR after dismantling the stator and rotor, removing burnt windings, cleaning the slots, rewinding the motor with super enamelled quality hermatic grade copper winding wire of proper gauge and suitable number of turns as per the existing windings, (Class 'F' insulation including Dr. back ELMO-50 Varnish, pre-heating to remove moisture and vaccum pressure impregnated for air bubble free varnishing, with slot liners & seperators, fibre-glass sleeves, baking to 150ºC for 12 hrs in special baking oven to suit the motor for IP-68 protection) of the 01 HP motor reassembling and testing all as directed by Engineer-in-Charge.Note : Contractor has to make arrangement for pumping of sewage effluents from sump well as long as pump remains under repair / rewinding by fitting his own pump including other T&P etc. all T&P will be brought by contractor nothing shall be issued by deptt. |
| 34 | Replacement of following parts for making the pump 01 HP Make- KIRLOSKAR in fully serviceable condition during the process of repair, as per existing size:- Pump Chamber |
| 35 | Setting plate (clearance adjustment plate) |
| 36 | Impellers (Cast Iron IS: 210 with 1.5 to 2% Ni) |
| 37 | Mechanical seal (out side) lower |
| 38 | Mechanical seal (in side) upper |
| 39 | O' ring set |
| 40 | Ball bearing lower |
| 41 | Ball bearing upper |
| 42 | Key for shaft |
| 43 | Cable seal |
| 44 | Cable gromate |
| 45 | Moisture sensor |
| 46 | Thermister (Top) |
| 47 | Auto coupling gasket |
| 48 | Oil (IOC OIL-12) |
| 49 | Auto coupling sliding bracket |
| 50 | Taking out by raising / Lowering of non clog sewage submersible pump set of 03HP/05 HP of Make : AQUA / KIRLOSKAR with the help of chain pully block from sewage sump after disconnecting electric & sewage coupling connections, dismantling pump and motor and carrying out repairs / replecement of defective parts, cleaning of Impeller and volute casing, clogged discharge line. Reassembling, painting the pump set and re-installation by lowering into sewage sump connecting up complete and testing all running parameters complete as directed by Engineer-in-Charge. (Replacement of defective parts and Dewatering will be paid saperately under respective Item of BOQ No. 40 to 40.15) Note : Contractor has to make arrangement for pumping of sewage effluents from sump well as long as pump remains under repair / rewinding by fitting his own pump including other T&P etc. all T&P will be brought by contractor nothing shall be issued by dept. |
| 51 | Re-winding of three phase, 415Volt electric motor of capacity 03 HP of non clog submersible pumps Make : AQUA / KIRLOSKAR after dismantling the startor and rotor, removing burnt windings, cleaning the slots, rewinding the motor with super enamelled quality hermatic grade copper winding wire of proper gauge and number of turns as per the existing windings, (Class 'F' insulation including Dr. back ELMO-50 Varnish, pre-heating to remove moisture and vaccum pressure impregnated for air bubble free varnishing, with slot liners & seperators, fibre-glass sleeves, baking to 150ºC for 12 hrs in special baking oven to suit the motor for IP-68 protection) of the 03 HP motor reassembling and testing all as directed by Engineer-in-Charge.Note : Contractor has to make arrangement for pumping of sewage effluents from sump well as long as pump remains under reair / rewinding by fitting his own pump including other T&P etc. all T&P will be brought by contractor nothing shall be issued by dept. |
| 52 | Re-winding of three phase, 415Volt electric motor of capacity 05 HP of non clog submersible pumps Make : AQUA / KIRLOSKAR after dismantling the startor and rotor, removing burnt windings, cleaning the slots, rewinding the motor with super enamelled quality hermatic grade copper winding wire of proper gauge and number of turns as per the existing windings, (Class 'F' insulation including Dr. back ELMO-50 Varnish, pre-heating to remove moisture and vaccum pressure impregnated for air bubble free varnishing, with slot liners & seperators, fibre-glass sleeves, baking to 150ºC for 12 hrs in special baking oven to suit the motor for IP-68 protection) of the 05 HP motor reassembling and testing all as directed by Engineer-in-Charge.Note : Contractor has to make arrangement for pumping of sewage effluents from sump well as long as pump remains under reair / rewinding by fitting his own pump including other T&P etc. all T&P will be brought by contractor nothing shall be issued by dept. |
| 53 | Replacement of following parts for making the pump 03 HP Make- AQUA in fully serviceable condition during the process of repair, as per existing Size:- Pump Chamber |
| 54 | Setting plate (clearance adjustment plate) |
| 55 | Impellers (Cast Iron IS: 210 with 1.5 to 2% Ni) |
| 56 | Mechanical seal (out side) lower |
| 57 | Mechanical seal (in side) upper |
| 58 | 'O' ring set |
| 59 | Ball bearing lower |
| 60 | Ball bearing upper |
| 61 | Key for shaft |
| 62 | Cable seal |
| 63 | Cable gromate |
| 64 | Moisture sensor |
| 65 | Thermister (Top) |
| 66 | Auto coupling gasket |
| 67 | Oil (IOC OIL-12) |
| 68 | Auto coupling sliding bracket |
| 69 | Replacement of following parts for making the pump 05 HP Make- KIRLOSKAR in fully serviceable condition during the process of repair, as per existing size:- Pump Chamber |
| 70 | Setting plate (clearance adjustment plate) |
| 71 | Impellers (Cast Iron IS: 210 with 1.5 to 2% Ni) |
| 72 | Mechanical seal (out side) lower |
| 73 | Mechanical seal (in side) upper |
| 74 | O' ring set |
| 75 | Ball bearing lower |
| 76 | Ball bearing upper |
| 77 | Key for shaft |
| 78 | Cable seal |
| 79 | Cable gromate |
| 80 | Moisture sensor |
| 81 | Thermister (Top) |
| 82 | Auto coupling gasket |
| 83 | Oil (IOC OIL-12) |
| 84 | Auto coupling sliding bracket |
| 85 | Taking out by raising / lowering of non clog sewage submersible pump set of Make : KIRLOSKAR 10 HP, 3 phase, 415 Volt, AC supply, 50 Hz with help of chain pully block from sewage sump well of STP after disconnecting electrical and mechanical connection, dismantling pump and motor and carrying out repairs / replecement of defective parts, cleaning of impeller and volute casing, clogged discharge line. Re-assembling the pump set and re-installation by lowering into sewage sump connecting up complete and testing all running parameters all as directed by Engineer-in-Charge. (Replacement of defective parts and Dewatering will be paid saperately under respective Item of BOQ No. 44 to 44.34)Note : Contractor has to make arrngement for pumping of sewage effluents from sump well as long as pump remains under repair/rewinding by fitting his own pump including other T&P etc. all T&P will be brought by contractor nothing shall be issued by dept. |
| 86 | Rewinding the electric motor of non clog submersible sewge pump 3 phase, 415Volt, Capacity 10 HP of Make : Kirloskar, after dismantling the startor and rotor, removing burnt windings, cleaning the slots, stampings and rewinding with super enamelled quality hermatic grade copper winding wire of proper gauge and number of turns as per the existing windings, including numex paper, glass paper, thimble, glass sleeve, main lead, backtoll, Varnishing and drying in oven, including fitment of thermostat protection relay, painting including required nut bolts (stainless steel) reassembling and testing to ensure leak tightness of the joints.Note : Contractor has to make arrngement for pumping of sewage effluents from sump well as long as pump remains under repair / rewinding by fitting his own pump including other T&P etc. all T&P will be brought by contractor nothing shall be issued by dept. |
| 87 | Supply & Fixing in replacement following items in replacement for making the functional of non clog submersible pump set of Make :- Kirloskar / KSB of 10 HP capacity in fully serviceable condition during the process of repair as per existing size complete.Lubricant oil up to the level for lubricating mechanical seals of Make : IOC-Servo system-317 or HPCL-Enklo-57 |
| 88 | Lubricant grease as required for lubricating antifriction ball bearings of Make : IOC Servogem-2 or HPCL-Lithon-2. |
| 89 | Part 15100 - Enclosed Impeller |
| 90 | Part-23002- Mech Seal (in board) Sic Vs Sic size-40mm |
| 91 | Part-23002- Mech Seal (in board) Sic Vs Sic size-55mm |
| 92 | Part-23003 - Mech Seal (out board) Carbon Vs St. St size-40mm |
| 93 | Part-23003 - Mech Seal (out board) Carbon Vs St. St size-55mm |
| 94 | Part- 26001 - Ball Bearing (Lower) SKF 6309-2RS1 or equivalent |
| 95 | Part- 26001 - Ball Bearing (Lower) SKF 7312 BG |
| 96 | Part- 26002 - Ball Bearing (Upper) SKF 6306-2RS1 or equivalent. |
| 97 | Part - 32000 - Key for Impeller |
| 98 | O' ring set for Cap-10 HP sewage pump |
| 99 | Part - 66900 - Screw for Impeller |
| 100 | Part -84501 & 03 - Washer for Cable Seal for Power Cable |
| 101 | Cable Seal for Control Cable |
| 102 | Part - 91001& 02 - Cable Gland |
| 103 | Part - 91200 - Terminal Board |
| 104 | Power copper cable 8 Core (4 X 4 Sq mm + 4 X 1.5 Sq mm) |
| 105 | Power copper cable 8 Core X 2.5Sq mm) |
| 106 | Control copper cable 1100Volt grade submersible type EBXL 10 Sqmm 3 core |
| 107 | Control copper cable 1100Volt grade submersible type EBXL 4 Sqmm 3 core |
| 108 | FR PVC Insulated sheathed multistranded copper conductor flexible cables for 1100 Volt grade conforming to IS : 694 of sizes 10 Sq mm 4 Core |
| 109 | FR PVC Insulated sheathed multistranded copper conductor flexible cables for 1100 Volt grade conforming to IS : 694 of sizes 10 Sq mm 3 Core |
| 110 | FR PVC Insulated sheathed multistranded copper conductor flexible cables for 1100 Volt grade conforming to IS : 694 of sizes 4 Sq mm 4 Core |
| 111 | FR PVC Insulated sheathed multistranded copper conductor flexible cables for 1100 Volt grade conforming to IS : 694 of sizes 4 Sq mm 3 Core |
| 112 | FR PVC Insulated sheathed multistranded copper conductor flexible cables for 1100 Volt grade conforming to IS : 694 of sizes 2.5 Sq mm 4 Core |
| 113 | FR PVC Insulated sheathed multistranded copper conductor flexible cables for 1100 Volt grade conforming to IS : 694 of sizes 1.5 Sq mm 4 Core |
| 114 | Part - 91400 - Cable Seal |
| 115 | Part - 91401 & 03 - Cable Seal for Power Cable |
| 116 | Part - 91402 - Cable seal for Control Cable |
| 117 | Part - 93200 - Moisture Sensor |
| 118 | Rubber diaphragm cap- 10 HP |
| 119 | Guide Shoe Cap-10 HP |
| 120 | Control copper cable 1100Volt grade submersible type EBXL 10 Sqmm 3 core |
| 121 | Control copper cable 1100Volt grade submersible type EBXL 4 Sqmm 3 core |
| 122 | Transportation of monoblock pump set of capacity 0.5 HP / 1 HP AC 3 phase, 415 Volt from STPs at any location / Yard in old Cantt area Allahabad to contractor's workshop, dismantling for carrying out necessary repairs / renewal of parts of pump and refixing the same after repairs including testing complete all as specified as directed by Engineer-in-Charge. |
| 123 | Cutting, opening of winding, re-winding of monoblock pump set of any make and rewinding with same size & number of coils with super enamelled copper winding wire, varnishing, packing and reassembling of same complete |
| 124 | Supply & Fixing in replacement following items for making functional of the monoblock pump set of capacity 0.5 HP / 1 HP AC 3 phase, 415 Volt in fully serviceable condition during the process of repair as per existing make & size :-Water seal and packing complete. |
| 125 | Driven end bearing of pump shaft |
| 126 | Non driven end bearing of pump shaft |
| 127 | Cooling fan |
| 128 | Cooling fan cover |
| 129 | Cast iron Impeller |
| 130 | Connection plate |
| 131 | Sleeve in Pump's cover and making size equal to outer dia size of bearing in back cover. |
| 132 | Neck ring |
| 133 | Centrifugal switch |
| 134 | Capacitor of 4/6 mfd capacity |
| 135 | Repairing of pump by re-threading of worn out studs holes and Supply & Fixing over size studs with nut and washer for balancing and repairing of pump shaft including replcement of the following. |
| 136 | Remetaling of Pump shaft, turning for bring it to Internal dia size of bearing in to front end cover. |
| 137 | Remetaling of Pump shaft, turning for bring it to Internal dia size of bearing in rear end cover. |
| 138 | Removing of Monoblock pump set of capacity 2 HP/3 HP from it's existing position and re-fixing of repaired pump set including Supply & Fixing worn out nuts & bolts and making necessary electric connection complete all as specified & directed. |
| 139 | M&L for painting to pump set externally complete with synthetic enamel smoke grey paint with spray machine after preparation of surfaces complete all as specified & directed. |
| 140 | Transportation of monoblock pump set of capacity 2 HP / 3 HP AC 3 phase, 415 Volt from STPs at any location / Yard in old Cantt area Allahabad to contractor's workshop, dismantling for carrying out necessary repairs / renewal of parts of pump and refixing the same after repairs including testing complete all as specified as directed by Engineer-in-Charge. |
| 141 | Cutting, opening of winding, re-winding of monoblock pump set of any make and rewinding with same size & number of coils with super enamelled copper winding wire, varnishing, packing and reassembling of same complete |
| 142 | Supply & Fixing in replacement following items for making functional of the monoblock pump set of capacity 2 HP / 3 HP AC 3 phase, 415 Volt in fully serviceable condition during the process of repair as per existing make & size :-Water seal and packing complete |
| 143 | Driven end bearing of pump shaft |
| 144 | Non driven end bearing of pump shaft |
| 145 | Cooling fan |
| 146 | Cooling fan cover |
| 147 | Cast iron Impeller |
| 148 | Connection plate |
| 149 | Sleeve in Pump's cover and making size equal to outer dia size of bearing in back cover |
| 150 | Neck ring |
| 151 | Centrifugal switch |
| 152 | Capacitor of 10 mfd capacity |
| 153 | Repairing of pump by re-threading of worn out studs holes and Supply & Fixing over size studs with nut and washer for balancing and repairing of pump shaft including replacement the following. |
| 154 | Remetaling of Pump shaft, turning for bring it to Internal dia size of bearing in to front end cover |
| 155 | Remetaling of Pump shaft, turning for bring it to Internal dia size of bearing in rear end cover |
| 156 | Removing of Air blower 20 HP /25 HP capacity from it's existing position and re-fixing of repaired pump set including Supply & Fixing worn out nuts & bolts and making necessary electric connection complete all as specified & directed. |
| 157 | Materail & Labour for taking out / Dismantling of Air blower pump set of rating 3 phase 440 Volt supply of capacity up to 20 HP / 25 HP from STP plant at any location and transporting the same to the authorised workshop for repair and transporting back to the site and making connection and testing complete all as specified & directed by the Engineer-in-Charge. Note : Parts renewed shall be measured & paid separately under respective item of BOQ No. 59 to 59.14 |
| 158 | Cutting out the existing winding of the motorof capacity 20/25 HP, taking out damage / burnt winding wire from startor, cleaning the slot and re-winding the same with supper enamelled copper winding wire of appropriate size including insulating material such as varnishing, paking and furnishing with the insulating sleeve and making connection complete all as specified & directed by Engineer-in-Charge. |
| 159 | Repairing of pump by re-threading of worn out studs holes and Supply & Fixing over size studs with nut and washer for balancing and repairing of pump shaft. |
| 160 | Repairing of pump shaft by depositing metal on it by brazing, grinding and polishing to make appropriate size of the shaft complete as specified including replacement of following as directed by the Engineer-in-Charge. |
| 161 | Gun metal / Stainless steel bush of pump shaft of required size complete all as specified & as directed by the Engineer-in-Charge. |
| 162 | Driven end bearing of blower shaft complete all as specified and as directed by the Engineer-in-Charge. |
| 163 | Non-driven end bearing of blower shaft complete all as specified and as directed by the Engineer-in-Charge. |
| 164 | Gland packing complete all directed by the Engineer-in-Charge. |
| 165 | Coupling with studs between motor & air blower complete as directed by the Engineer-in-Charge. |
| 166 | Suction air filter complete as directed by the Engineer-in-Charge. |
| 167 | Suction silencer complete as directed by the Engineer-in-Charge. |
| 168 | Neck ring complete all as specified & directed by the Engineer-in-Charge. |
| 169 | Ball bearing of motor shaft complete as specified & directed by the Engineer-in-Charge. |
| 170 | Replacment of air blower pully as per sample or suiatable at site complete as specified & as directed by the Engineer-in-Charge. |
| 171 | Strip opening of air blower & cleaning of air filter and silencer as per manufacurer Instruction complete as directed by the Engineer-in-Charge. |
| 172 | Draining of used oil from air blower & supply and filling of new oil in air blower up to reuired level complete all as specified & as directed by the Engineer-in-Charge. |
| 173 | Fan belt suitable for Air Compressor 500Cum per Hours including connection complete as directed by Engineer-in-Charge |
| 174 | Pressure Gauge (Water) range 0-4.20 Kg/Sqcm complete as directed by Engineer-in-Charge. |
| 175 | Cuttting of grass and vegitation shrubs and removing the same at site around the sewage treatment plant area at different location at Old Cantt Allahabad Cantt at interval of three month complete as directed by the Engineer-In-Charge.Note : Each cutting will be measured separately. |
| 176 | Provision for Bactroligical test & sample collection from various STP plants in sterilized bottle and testing shall be done from Govt Lab / Approved by UP Pollution Control Board, on monthly basis as per the Environment (Protection) Rules-1986, in Schedule-I, in permissible standards in sewage treated water for inland surface water i.e.(a) Suspended solids Max < 50 mg/litres(b) PH value (6.5 PH to 9.0 PH) (c) Biochemical Oxygen Demand (BOD) (5 day at 20 deg celcius) Max > 30 (d) COD (Chemical Oxygen Demand) up to 250 mg/l(e) Focal Coliform (FC) Most Probable Number per 100 millimeter (MPN/100 ml) < 1000 |
| 177 | De-sludging of existing sewage collection well of size 6 Mtr dia and 10 Mtr depth and getting out sludge through sucking super soucer machine and depositing to a distance exceeding 1.5 KM but not exc 2 KM out side MD land at isolated places (Location -STP Saraswati Vihar).Note : Pumping out sludge water from sewage collection tank by using Diesel Engine driven pumps and necessary diesel is to be arranged / provided by Contractor |
| 178 | De-sludging of existing sewage collection well of size 4.5 Mtr dia and 10 Mtr depth and getting out sludge through sucking super soucer machine and depositing to a distance exceeding 1.5 KM but not exc 2 KM out side MD land at isolated places (Location -STP Saraswati Vihar Boosting Station).Note : Pumping out sludge water from sewage collection tank by using Diesel Engine driven pumps and necessary diesel is to be arranged / provided by Contractor |
| 179 | De-sludging / cleaning of existing sludge drying bed of size (6.40 X 6.40 Mtrs) and depth 0.8 M by any means i.e. manually or by mechanical appliances complete by removing the sludge / vegetation and depositing sludge at abandoned places in the Cantt area and deposited the same where directed by Engineer-in-Charge including supply and spreading of sand up to 150 mm thick on top of filter bed complete as specified & directed by Engineer-in-Charge. (Location-STP Saraswati Vihar) Please Enable Macros to View BoQ information |
| 180 | De-sludging / cleaning of existing sludge drying bed of size (6.40 X 6.40 Mtrs) and depth 0.8 M by any means i.e. manually or by mechanical appliances complete by removing the sludge / vegetation and depositing sludge at abandoned places in the Cantt area and deposited the same where directed by Engineer-in-Charge including supply and spreading of sand up to 150 mm thick on top of filter bed complete as specified & directed by Engineer-in-Charge. (Location-STP Saraswati Vihar) Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail