|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 3 | Desilting of side drains and disposal of material to nearby NDMC dhalao within 1 km by tractor trolley including loading , unloading etc complete including execution of work in foul conditions. All kinds of soil. |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks ofclass designation 7.5 in foundation and plinth in Cement mortar 1:6(1 cement : 6 coarse sand) |
| 7 | 12 mm cement plaster of mix 1:4 (1 cement: 4 coarse sand) with Neat cement punning. |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 10 | Providing & Fixing 30 mm thick (undressed) Red Sand Stone Slab over drains |
| 11 | Centering and shuttering including strutting, propping etc. and removalof form for all heights: Foundations, footings, bases of columns, etc. for mass concrete |
| 12 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 13 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 14 | Filling with available demolished C&D material at site in trenches, plinth,sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering as per specification and direction of Engineer-in-charge |
| 15 | Supply of screen soil C&D waste product by mechanical transport including loading, unloading, royalty and banking the same in layers not exceeding 20 cm in depth, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions with mechanical lead upto 15 Km and lift up to 1.5m in all kinds of soil. |
| 16 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth levelConcrete of M10 grade with minimum cement content of 220 kg /cum |
| 17 | Providing and laying RMC of M-30 grade By using minimum 400kg of cement(43 grade, OPC) per cum of concrete in roads / streets manufactured in automatic RMC plant using coarse sand and graded stone aggregate of 20mm nominal size in appropriate proportion as per approved design criteria including transportation to site in transit mixer, including cost of admixture in recommended proportion as per IS9103 to accelerate/ retard setting of concrete to improve workability with out impairing strength and durability as per specification including spreading and compacting mechanically by using needle and surface vibratos, leveling to required slope & camber, finishing by floating & brooming with wire brushes etc. and curing including making provision for contraction / expansion, construction of cross / longitudinal joints of size 10mm wide 50mm deep by groove cutting machine, providing and filling joints with approved joint filler and sealants, etc. complete, as per direction of Engineer in-charge. (Cost of joint filler & sealants shall be paid for separately under relevant items). Note:- Cement content considered in M-30 is @ 400 kg/cum. Less cement used as per design mix is recoverable separately M-30 RMC by using minimum cement @400 kg/cum. Cement concrete manufactured in automatic batching plant (RMC plant) including transportation to site in transit mixer. |
| 18 | Providing and filling in position rubberized bitumen hot sealing compound for sealing of expansion joints in roads / pavements all complete as per direction of the Engineer-in-Charge. |
| 19 | Pumping out water by deploying diesel pump of 10 HP including suction pipe and delivery pipe and shifting as per site requirement etc. complete. |
| 20 | Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately) :Circular manhole 140 cm dia with circular cover 600 mm dia of grade EHD - 35 |
| 21 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 22 | Lettering with black Japan paint of approved brand and manufacture |
| 23 | Painting with synthetic enamel paint of approved brand andmanufacture of required colour to give an even shade . Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. Please Enable Macros to View BoQ information |