| 1 | Item No. 1: Excavation for foundation trenches in earth soil of all type sand gravel and soft murum including removing the excavated material upto a distace of 50 M and lifls as below, stacking and spreading as directed by Engineer-in-charge, norinal dewatering, preparing the bed for etc. complete |
| 2 | Item No. 2: Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for ete, complete |
| 3 | Item No. 3 Excavation for foundation/ pipe trenches in soft rock including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for |
| 4 | Item No. 4 Excavation for foundation / pipe trenches in hard rock by blasting including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed etc.complete |
| 5 | Lift 6 M to 7.5 m |
| 6 | Lilt 7.5 M to 9 m |
| 7 | Lift 9:00 M to 10.00 m |
| 8 | Item No. 5:- Providing and laying in situ Cement concrete in proporation of trap metal for foundation and bedding, including balling out water manually, formwork, compacting and curing etc. |
| 9 | Item No. 6: Providing & costing in constructing in situ. C.C of trap granite/quartzite / gneiss/metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering ceterind from work.compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth & even surface wherever necessary or roughening if spetial finish is to be provided & curing etc. complete. (By weight batching & mix design for M-250 & M-300 only use of L&T, ACC Ambuja, Birla Gold, Manikgad, Rajashree etc. cement is permitted excluding M.S or Tor reinforcement in R.C.C. M-250grade. |
| 10 | 1) R.C.C. M-200 for vertical wall |
| 11 | Item No. 7:- Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes, caps, footing, foundation, slab, beams, columns, canopies, staircase, newels, chajjas, lintels, pardies, coping, fine arches etc. as per detailed designs, drawing & schedule s including cutting, bending, hooking the bars, binding with wires or tack welding & supporting as required etc. complete (including cost of binding wire). Tor steel |
| 12 | Item No: 8- Providing & laying weep holes of 80 mm AC/PVC pipe as per drawing for abutment returns, 8.00 return walls etc. complete. |
| 13 | Item No. 9- Dewatering the excavated trenches and pools of water by using pumps and other devices including disposing of the water to safe distance as directed by Engineer-in-Charge (including cost of 2320 machinery labour fuel )etc complete. |
| 14 | Item No: 10- Providing rubble stone paving 15cm thick in 1:3 cement mor tar over bedding of 15cm thick cement concrete of 1:4:8 proportion with trap/granite / quartzite / gneiss metal including striking joints and watering etc. complete. |
| 15 | Item No: 11 Refilling the trenches with approved excavated material from foundation in 15cm to 20cm layers including watering and compaction etc. (MJP/DSR 22-23 |
| 16 | Item No: 12 -Providing and fixing in position C.I. dapuri steps or 22 mm dia. M.S. bar step with proper anchorage, etc. and providing and applying 3 coats of anticorrosive paint, etc complete as directed by Engineer- |
| 17 | Item No. 13:- Providing and fixing 90 cm x 60 cm Marble plate engraving 10 cm.height let ter, figures including paint ing the lefters/ figures wi th approved colour and shade complete |