| 1 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60metres. |
| 2 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. (as per S.I. No. 251) |
| 3 | Granular Sub-base with Well Graded Material (Table 400.1)By Mix in Place Method (Blanket coat)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | Granular Sub-base with Well Graded Material (Table 400.1)By Mix in Place Method (GSB)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 5 | Providing and Laying of Rubble moulded Zig Zag Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. |
| 6 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. .(S.I. NO-279) |
| 7 | Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work.(S.I. NO-305) |
| 8 | Cement concrete with 2cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 3:1.5:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (S.I. NO-279b) |
| 9 | Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. |
| 10 | 12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 2 part of find sand of 1.25 fineness modulus. |
| 11 | Supply of M.S. Grill of a approved quality and drawing made of flat iron not bigger then 20x4 mm size including supply of materials, fabrication, labour, T&P and also one coat of red oxide paint complete in all respect as per direction of Engineer-in-charge for proper completion of work at site. |
| 12 | Cement concrete with 2cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. S.I no-279a |
| 13 | Providng and laying of 8 to 10mm thick ivory or light shade vitrified tiles of 600mm x 600mm size in flooring or skirting laid with 1 : 3 cement mortar (1 cement , 3 coarse sand) finishing with cement sturry & with pigment grouting & Polishing complete I/C S/O all material labour T & P etc. required for proper completion of work excluding base contrete. S.I. No- ch-14 Add New Item |
| 14 | RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:1.5:3 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost.(S.I. No. 284) |
| 15 | Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. |
| 16 | Providng Supplying & fixing of jali Complate As per dairection of E/I |
| 17 | Providing and laying reinforced Cement Concrete Pipe NP-3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets Clause 1106. (600 mm dia) |
| 18 | Supply & fixing of inauguration marble stone fixed in 1:4 brick work, Plastering, Letter writing, carriage upto side of work with all labours, materials etc. complete. Please Enable Macros to View BoQ information |