| 1 | Providing Temporary Illumination, Security lighting, fans, Standby Generators, Inverter Facilities and Public Address systems to the Storage Place and Counting Centre for 127-Palani, 128-Oddanchatram, 129-Athur, 130-Nilakottai, 131-Natham, 132-Dindigul and 133-Vedasandur of Tamilnadu Legislative Assembly Constituencies Election 2026 in Anna University Engineering College at Silvarpatti Village in Dindigul District\\". Estimate Amounts :62.81 Lakhs |
| 2 | Hire and Labour charges for supply and fixing of 4 feet 20W LED fitting with 20W LED tube with suitable supporting poles and necessary connection complete for starting and ending day including dismantling. (DATA-1) |
| 3 | Hire and maintenance charges for 4 feet 20W LED fitting with 20W LED tube with suitable supporting poles and necessary connection complete for intermediate 28 days. (DATA-2) |
| 4 | Hire and Labour charges for supply and fixing of 4 feet 20W LED fitting with 20W LED tube on existing support / wall with necessary connection complete for starting and ending day including dismantling. (DATA-3) |
| 5 | Hire and maintenance charges for 4 feet 20W LED fitting with 20W LED tube on existing support / wall with necessary connection complete for intermediate 28 days. (DATA-4) |
| 6 | Hire and Labour charges for supply and fixing of 200W LED flood light fitting on existing support / wall with necessary connection complete for starting and ending day including dismantling. (DATA-5) |
| 7 | Hire and maintenance charges for 200W LED flood light fitting on existing support / wall with necessary connection complete for intermediate 28 days (DATA-6) |
| 8 | Hire and Labour charges for supply and fixing of 6Mtr GI post for 200W LED flood light fitting with suitable clamps and necessary earth works with connection complete for starting and ending day including dismantling. (DATA-7) |
| 9 | Hire and maintenance charges for 6Mtr GI post for 200W LED flood light fitting with suitable clamps and necessary connection complete for intermediate 28 days. (DATA-8) |
| 10 | Hire and Labour charges for supply and fixing of Pedestal fan with necessary connection complete for starting and ending day including dismantling. (DATA-9) |
| 11 | Hire and maintenance charges for Pedestal fan with necessary connection complete for intermediate 28 days. (DATA-10) |
| 12 | Hire and Labour charges for supply and fixing of 5A/15A plug board with necessary connection complete for starting and ending day including dismantling. (DATA-11) |
| 13 | Hire and maintenance charges for 5A/15A plug board with necessary connection complete for intermediate 28 days. (DATA-12) |
| 14 | Hire and Labour charges for supply and fixing of 250A Panel Board incoming 250A TPN Switch with various range of TP/DP/SP MCB with suitable angle iron frame work and necessary connection complete for starting and ending day including dismantling. (DATA-13) |
| 15 | Hire and maintenance charges for 200A Panel Board incoming 250A TPN Switch with various range of TP/DP/SP MCB with suitable angle iron frame work and necessary connection complete for intermediate 28 days. (DATA-14) |
| 16 | Hire and Labour charges for supply and fixing of 250A Change Over switch with necessary connection complete for starting and ending day including dismantling. (DATA-15) |
| 17 | Hire and maintenance charges for 250A Change Over switch with necessary connection complete for intermediate 28 days. (DATA-16) |
| 18 | Hire and Labour charges for supply and fixing of Earth pipe with necessary earthing connection complete for starting and ending day including dismantling. (DATA-17) |
| 19 | Hire and maintenance charges for Earth pipe with necessary earthing connection complete for intermediate 28 days. (DATA-18) |
| 20 | Hire and Labour charges for supply and run of 2 of 3/20 sq.mm copper wire of 1100V grade with bearer wire with necessary connection complete for starting and ending day including dismantling. (DATA-19) |
| 21 | Hire and maintenance charges for 2 of 3/20 sq.mm copper wire of 1100V grade with bearer wire and necessary connection complete for intermediate 28 days. (DATA-20) |
| 22 | Hire and Labour charges for supply and run of 2 of 7/20 sq.mm copper wire with suitable PVC pipe with necessary connection complete for starting and ending day including dismantling. (DATA-21) |
| 23 | Hire and maintenance charges for 2 of 7/20 sq.mm copper wire on suitable PVC pipe with necessary connection complete for intermediate 28 days. (DATA-22) |
| 24 | Hire and Labour charges for supply and run of 4 of 7/20 sq.mm copper wire with suitable PVC pipe with necessary connection complete for starting and ending day including dismantling. (DATA-23) |
| 25 | Hire and maintenance charges for 4 of 7/20 sq.mm copper wire with suitable PVC pipe with necessary connection complete for intermediate 28 days. (DATA-24) |
| 26 | Hire and Labour charges for supply and run of 4 of 7/16 sq.mm copper wire with necessary connection complete for starting and ending day including dismantling. (DATA-25) |
| 27 | Hire and maintenance charges for 4 of 7/16 sq.mm copper wire with necessary connection complete for intermediate 28 days. (DATA-26) |
| 28 | Hire and Labour charges for supply and run of 4 of 19/16 sq.mm copper wire with necessary connection complete for starting and ending day including dismantling. (DATA-27) |
| 29 | Hire and maintenance charges for 4 of 19/16 sq.mm copper wire with necessary connection complete for intermediate 28 days. (DATA-28) |
| 30 | Hire and Labour charges for supply and laying of 4 of 185 sq.mm PVC Alu. LTUG armoured cable with necessary excavation and earth works connection complete for starting and ending day including dismantling. (DATA-29) |
| 31 | Hire and maintenance charges for 4 of 185 sq.mm PVC Alu. LTUG armoured cable with necessary connection complete for intermediate 28 days. (DATA-30) |
| 32 | Hire and Labour charges for supply, erection, testing and functioning of 125 KVA Diesel Generator set for starting and Ending day including transportation & dismantling. (DATA-31) |
| 33 | Hire and maintenance charges for functioning of 125 KVA Diesel Generator set for intermediate 28 days (DATA-32) |
| 34 | II) Counting Centre (3 days) |
| 35 | Hire and Labour charges for supply and fixing of 4 feet 20W LED fitting with 20W LED tube on existing support / wall with necessary connection complete for 3 days including dismantling. (DATA-33) |
| 36 | Hire and Labour charges for supply and fixing of 200W LED flood light fitting on existing support / wall with necessary connection complete for 3 days including dismantling. (DATA-34) |
| 37 | Hire and Labour charges for supply and fixing of Pedestal fan with necessary connection complete for 3 days including dismantling. (DATA-35) |
| 38 | Hire and Labour charges for supply and fixing of 5A/15A plug board with necessary connection complete for 3 days including dismantling. (DATA-36) |
| 39 | Hire and Labour charges for supply and fixing of 250A Panel Board incoming 250A TPN Switch with various range of TP/DP/SP MCB with suitable angle iron frame work and necessary connection complete for 3 days. (DATA-37) |
| 40 | Hire and Labour charges for supply and fixing of 250A Change Over switch with necessary connection complete for 3 days. (DATA-38) |
| 41 | Hire and Labour charges for supply and fixing of Earth pipe with necessary earthing connection complete for 3 days including dismantling. (DATA-39) |
| 42 | Hire and Labour charges for supply and run of 2 of 3/20 sq.mm copper wire of 1100V grade on suitable bearer wire with necessary connection complete for 3 days including dismantling. (DATA-40) |
| 43 | Hire and Labour charges for supply and run of 2 of 7/20 sq.mm copper wire of 1100V grade on suitable bearer wire with necessary connection complete for 3 days including dismantling. (DATA-41) |
| 44 | Hire and Labour charges for supply and laying of 4 of 185 sq.mm PVC Alu. LTUG armoured cable with necessary excavation and earth works connection complete for 3 days including dismantling. (DATA-42) |
| 45 | Hire and Labour charges for supply, erection, testing and functioning of 125 KVA Diesel Generator set for 3 days including transportation & dismantling. (DATA-43) |
| 46 | Hire and Labour charges for supply and run of Air cooler with stand with necessary connection complete for 3 days including dismantling. (DATA-44) |
| 47 | Hire and Labour charges for supply, erection, testing and functioning of Power Amplifier with connection complete for 3 days including dismantling. (DATA-45) |
| 48 | Hire and Labour charges for supply, erection, testing and functioning of 1x15 HF Loud Speaker for 3 days including dismantling. (DATA-46) |
| 49 | Hire and Labour charges for supply, erection, testing and functioning of Wired mike / Cordless mike for 3 days. (DATA-47) |
| 50 | Hire and labour charges for supply, erection, testing, commissioning and Dismantling of 2KVA UPS with 2 Nos 12V 150AH tall tubular Batteries including transportation charges and necessary connection complete for 30 Days including dismantling. (DATA-48) |
| 51 | ire and labour charges for supply, fixing, testing of 5TR Split type AC indoor and out door units, interconnecting copper pipe, leakage testing, gas charging for 30 Days including Refrigerant topup dismantling. (DATA-49) |
| 52 | Hire charges for 5TR Split type AC indoor and out door units, interconnecting copper pipe, leakage testing, gas charging for 3 Days including Refrigerant topup dismantling. (DATA-50) |
| 53 | ire and labour charges for supply, fixing, testing of 2 TR Split type AC indoor and out door units, interconnecting copper pipe, leakage testing, gas charging for 30 Days including Refrigerant topup dismantling. (DATA-51) |
| 54 | Hire charges for 2 TR Split type AC indoor and out door units, interconnecting copper pipe, leakage testing, gas charging for 3 Days including Refrigerant topup dismantling. (DATA-52) |
| 55 | Towards Engagement Electrical Labours to attend the electrical works and inspecting of Electrical Installations periodically. |
| 56 | Storage Days |
| 57 | Electrician / Wireman Grade - II |
| 58 | Electrical Helper |
| 59 | Intermediate Days |
| 60 | Electrician / Wireman Grade - II |
| 61 | Electrical Helper |
| 62 | Counting Days |
| 63 | Electrician / Wireman Grade - II |
| 64 | Electrical Helper |
| 65 | Charges for Purchase of Diesel for 30 Days (calculation: 6×125kVA DG sets × 25.5 L/hr × 1 hr × 30 days = 4,590 Ltrs; shutdown period 1,110 Ltrs; total 5,700 Ltrs) |
| 66 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |