| 1 | Dismantling,clearing away and carefully stacking materials useful for re-use for any thickness of walls of Brick work in cement mortar walls under 3m high,etc complying with standard specifications and as directed by the departmental officers. |
| 2 | Precast Concrete Block masonry using Autoclaved Cellular Aerated Concrete Block of size 600x200x225mm conforming to IS 2185 (Part 3) : 1984 with Self Curing AAC Joint Mortar for Partition Wall of non load bearing type in accordance with IS 6041:1985 including neat finishing, etc., complete complying with standard specification and as directed by the departmental officers. |
| 3 | For Superstructure in Ground Floor |
| 4 | For Superstructure in First Floor |
| 5 | For Superstructure in Second Floor |
| 6 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 7 | Hire charges for Closing the glazed doors and windows in Strong room using Plywood and strengthening the same with countrywood reeper 2\\"x1\\". The entire cost should be borne by the contractor himself and the work should be completed. After the counting is over the same protection should be removed as directed by the departmental officers.(14 days) |
| 8 | Hire charges for Closing the glazed doors and windows in Strong room using GI sheet and strengthening the same with countrywood reeper 2\\"x1\\". The entire cost should be borne by the contractor himself and the work should be completed. After the counting is over the same protection should be removed as directed by the departmental officers.(14 days) |
| 9 | Hire charges for providing weldmesh partition using 7.50cm x 2.50 cm weldmesh (10 gauge) with silver oak scantling of required length and size of vertical and horizontal supports and cross supports using countrywood reeper of size 2\\" x 1\\" etc., complete as directed by the departmental officers. (14 days) |
| 10 | Hire charges for Providing Steel Frame Weld Mesh Door of size 0.90m x 1.85m using countrywood reepers frame of size 2\\"x1\\" of two vertical of size 1.85m each and two horizontal of 0.90m by the each and intermediate support on the bottom 2Nos of 0.65m layers each and weldmesh of size 3\\" x 1\\" (10 gauge x 6 gauge) including cost of nails and labour charges etc., complete.(14 days) |
| 11 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 12 | Painting Old Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over the existing wall in all floors etc.,complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 13 | Painting synthetic enamel paint of approved quality and colour over a priming coat with approved quality of white primer in all floors.The rate is inclusive of cost of all materials and labour, brushes and scaffolding charges etc., complete complying with standard specifications.(The paint to be used should be got approved by the executive engineer before use on works). |
| 14 | Hire charges for providing and erection of G.I. Sheet Covered barricading arrangements with casurina poles of 10cm to 13cm dia for vertical and 10cm to 13cm dia for horizontal.The total height of the barricading is 2.10 m that is 60cm for embedding below ground level, 120cm to 150cm above ground level.Three of horizontal to be provided in all places tighty tied with vertical poles using coir ropes.The distance between the vertical poles is 1.50m to 2.40m and removing the same after the counting is over including, erection cost and conveyence all materials to site of work etc., complete with standard specifications and as directed by the departmental officers.(14 days) |
| 15 | Hire charges for Providing and erection of barricading arrangements with casurina poles of 10cm to 13cm dia for vertical and 10cm to 13cm dia for horizontal.The total height of the barricading is 2.10 m that is 60cm for embedding below ground level, 120cm to 150cm above ground level.Three of horizontal to be provided in all places tighty tied with vertical poles using coir ropes.The distance between the vertical poles is 1.50m to 2.40m and removing the same after the counting is over including, erection cost and conveyence all materials to site of work etc., complete with standard specifications and as directed by the departmental officers.(14 days) |
| 16 | Labour and hire charges for providing Steel barricading arrangements using GI pipes and 60cm below Ground level and 1.00m above 10 feet length and tied with bolt and nuts and dismantled after function is over (Hire charges only) |
| 17 | 3 days |
| 18 | Labour and hire Charges for Materials and cost of Labour for erection of HIPPED ROOF rain proof PVC pandal using Tubler post of 100mm dia over tubular truss 3.30m C/C top covered with PVC sheets as directed by the departmental officers. |
| 19 | 3 days |
| 20 | 14 days |
| 21 | Hire charges for materials and cost of labour for erection of HIPPED ROOF RAIN PROOF G.I.SHEET PANDAL using tubular post of 200mm dia at 20' centre to centre and middle span of 80'. The tubular post are connected with 100mm dia pipe truss for a span of 80'. The entire roof of the pandal are covered with 0.6mm thick G.I. Corrugated sheet with proper special type clamps and nails. THe rate is inclusive of removing the pandal after function is over etc., Complete complying with standard specificatin and as directed by the departmental officers. |
| 22 | For 14 days |
| 23 | For 3 days |
| 24 | Labour and hire charges for supplying and spreading of RED COLOUR CARPET inside, front of the shed and ladder point up to the VVIP & VIP section areas including transporting, spreading and removing the same after the function is over. (Hire Charges for Three days only) |
| 25 | Hire charges for Police watch tower made of casurina props of 10cm to 13cm dia to a height of 15' including ladder arrangements and standing platform using 25mm thick plywood with red carpet with casurina prop hand rails etc, complete as directed by the departmental officer .The rate including loading ,transporting and erecting, removing the same after the election as over etc, complete with standard specification ( Hire charges for 14 days ) |
| 26 | Hire charges for Earth-Excavator-wheeled Backhoe loader - 0.5m3 capacity for clearing the site, debris, bushes, vegetation and levelling the site etc., complete complying with standard specification and as directed by the departmental officers. |
| 27 | Hire Charges using Light crane for closing rear window and openings as directed by the departmental officer and the rate is inclusive of hire charges for Crane, fuel cost, labour charges etc., complete. |
| 28 | Supplying of 3 Row Steel rack of 7 feet height of required size provided with M.S angle of size 25x25x3mm is coated with one coat of zinc and two coats of enamel paint for Storing of EVM's and VVPATs in Strong Room and labour charges, conveyance,etc., complete and as directed by the departmental officers. |
| 29 | GST 18% Please Enable Macros to View BoQ information |