| 1 | Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil |
| 2 | Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil |
| 3 | Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering. |
| 4 | Providing material and labour for laying Plain cement concrete M15 in Foundation and Plinth including cost of formwork, compacting, finishing, curing etc complete for all level, all height/ depth as directed by engineer in charge. |
| 5 | Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete. (upto 10 ton) |
| 6 | Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (A) Foundations Footings Bases of Columns etc. and Mass concrete. (upto 10 ton) |
| 7 | Providing and laying controlled cement concrete M.250 and curing complete including the cost of formwork and reinforcement for reinforced concrete work in (D) Columns, Pillars posts and struts, upto floor two level. (upto 10 ton) |
| 8 | Providing and laying controlled cement concrete M.250 and curing complete including the cost of formwork and excluding cost of reinforcement for reinforced concrete work in Lintels, Beams, Girders and Cantilever upto floor two level etc complete as directed by Engineer-incharge. |
| 9 | Providing TMT Bar FE 500/500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level (upto 10 ton) |
| 10 | Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in Above plinth level upto floor level two in Cement Mortar 1:6 (1- Cement : 6 -fine sand)(B) Conventional (upto 10 ton) |
| 11 | Providing 20mm thick sand faced cement plaster on walls upto height 10 metres above ground level consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and8mm thick finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. complete. |
| 12 | Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an required shape even shade after thoroughly brushing the surface to remove all dirt, and remains of loose powdered materials.etc complete inluding primary coat. |
| 13 | Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at required spacings and frame alround, square or round bars with round headed bolts and nuts or by screws. (B) ORNAMENTAL GRILL (upto 10 ton) |
| 14 | Steel work, welded in built up sections framed work including cutting, hoisting, fixing in position and applying a priming coat of read lead paint. For Wallcmpound Gate And Grill work work at above wall. |
| 15 | Painting two coats (excluding priming coat) on new steel and other metal surface with enamel paint, brushing, interior to give an even shade including cleaning the surface an even shade including cleanicn the surface of all dirt, dust and other foreign matter. |
| 16 | Construction of granular Sub base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401, |
| 17 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.60 mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern. |
| 18 | Manufactture, supply of R.C.C. Precast Kerb Stone - K - HB GREY SL VWP 600 x 300 x 150 mm with minimum average 2 Mpa bending strength at 28 days HSN : 68101190 as per specification and drawing attached with the tender document for sizes as mentioned. The rates included all taxes, loading, carting, unloading, stacking etc. complete. |
| 19 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead as per EIC and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). |
| 20 | Terminalia Arjuna : Ht.-8'-9' |
| 21 | Lagerstroemia White: Ht. 8'-9' |
| 22 | Terminalia Bellirica: Ht. 6'-7' |
| 23 | Bauhinia Blakeana: Ht. 10'-12' |
| 24 | Dalbergia Sissoo : Ht.-6'-8' |
| 25 | Mimusops Elengi: Ht. 10'-12' |
| 26 | Supplying material and labour for filling with good quality garden soil obtained from outside, including watering, ramming well, consolidating, compacting dressing and maintenance for 2 months etc. complete, as directed. Dressing and leveling the area by spreading 2\\"-3\\" of good quality soil & manual compaction as required and as approved by EIC. Please Enable Macros to View BoQ information |