| 1 | (Supply Part) - 33 KV H T line |
| 2 | ACSR 6/4.72 mm + 7/1.57mm (100 mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage)} |
| 3 | Steel Tubular Poles (11 m, Working Load > 227 kg) (with Ruling Span 90 m, 10 No. Run thro' and 3 No. Dead End Structures) |
| 4 | Muffs (2000mm) with concerete filling |
| 5 | X-Arms: [MS Channel Iron C type (125x65x5.3 mm, Length: 2100 mm i/c tolerance 100 mm on either side] x 10 No. Structures |
| 6 | Belt Set - MS Angle Iron: 65x65x6, Length:(1800 mm) x2 No. |
| 7 | X-Bracing Set - MS Angle Iron: 50X50x6, Length [2700mm) x 2 No.] |
| 8 | Belt Set - MS Angle Iron: 65x65x6, Length:(1800 mm) x2 No. |
| 9 | X-Bracing Set - MS Angle Iron: 50X50x6, Length [2700mm) x 2 No.] |
| 10 | X-Arm (Horizontal) - MS Channel Iron C type: (100x50x6 mm), Length: 3250 mm i/c tolerance 100 mm on either side x 2 No.] |
| 11 | Discs insulator String sets on Dead End structures (comprising 3 No. Discs in each string: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Bend Stapples & straight Stapples etc.) x (3 No. conductors) x (2 No. sides) |
| 12 | 33 kV Pin Insulators (Porcelain, 36 kV, 10 kN): 3 No per double pole structure |
| 13 | Stay set complete in all respect( i/c stay clamp) (2 No./Run Thro & 4 No. / Dead End) |
| 14 | Stay Wire (7/4.00 mm) (10.0 kg Per Stay Set) |
| 15 | HT Earthing set complete |
| 16 | Earth wire (GI, 6 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3%(Sag and wastage)}@ 150 kg/km |
| 17 | Eye Hook for earth wire |
| 18 | MS Channel Iron: 75x40x4.8, Length :3300 mm |
| 19 | Half clamps: [On Double Pole Dead End structure: 6 No, Double Pole Run Thro' structure: 8 No] |
| 20 | Full clamps: [On Double Pole Dead End structure: 4 No, Double Pole Run Thro' structure: 4 No] |
| 21 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 20 mm Φ or more (with flat and spring washers)] |
| 22 | Barbed wire |
| 23 | Danger Plate (203X200X1.6mm) |
| 24 | Red Oxide |
| 25 | Aluminium Paint |
| 26 | Transportation charges |
| 27 | (Erection Part) - 33 KV H T line |
| 28 | Erection of ST pole 11 mtr long (Double Pole str) for HT Line complete in all respect. |
| 29 | Erection or RE-erection of Tilted S/T Pole structure ( Double pole structure) for HT Line complete in all respect. |
| 30 | Erection of Stay Set for HT Line complete in all respect. |
| 31 | Erection of Earthing set for HT Line complete in all respect. |
| 32 | Erection of G I wire such as Stringing , tensioning, Sagging, jointing & fasting etc. |
| 33 | Erection of ACSR Conductor 6/1/4.72 mm2 such as Stringing , tensioning, Sagging, jointing & fasting etc. |
| 34 | Dismantling charges of damaged ACSR Conductor 100 mm2 complete in all respect |
| 35 | Dismantling of damaged ST Pole structure complete in all respect |
| 36 | Manual carrige of material for 1 Km HT line Average distance =1.00km. Please Enable Macros to View BoQ information |