| 1 | \\"Shifting of various 33 KV lines passing through the land of 132 KV GSS Sumerpur due to Upgradation of 132 KV GSS Sumerpur to 220 KV GSS Sumerpur as applied by AEN(T&C) RVPN, Pali under AEN(O&M), Jodhpur Discom, Sumerpur under pali circle on Labour Rate basis 2025\\" |
| 2 | 1. Labour Charges for Shifting of 33KV Line 132 KV GSS Sumerpur to 220 KV GSS Sumerpur |
| 3 | (1.1) Conducting route survey as per approved route map and pegging of route with tee off point section point & double pole locations. |
| 4 | (1.4) Trimming of tree branches/plants manually/ by machine and preparing route approchases for proposed line/line maintenance work of existing HT/LT lines |
| 5 | (2.3) Excavation of pit in ordinary rock which does not require blasting/murrad (In Jodhpur Discom) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit. |
| 6 | (B) Lattice Tower /Size of pit |
| 7 | 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep |
| 8 | (C)Stay set/Depth of pit |
| 9 | 6'x 5/8\\" -0.75x0.5x1.35 m |
| 10 | (3.2) Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site |
| 11 | (3.2.1) Within 10 Kms. |
| 12 | (3.3) Safe carriage of insulator hardware cable etc. including loading /unloading & stracking in Nigam stores etc. |
| 13 | (3.3.1) (Within 10 Kms. |
| 14 | (3.4)Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site. |
| 15 | (3.4.1) Within 10 Kms. |
| 16 | (5.1) Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra. |
| 17 | (5.1.3) Lattice Structure |
| 18 | (5.4)Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire. |
| 19 | (5.4.1) 8\\"x3/4\\" with 7/8 SWG stay wire |
| 20 | (5.6) Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base. |
| 21 | (6.8)Fixing and assembly of disc.point channel pair with pilot plates&clamps on erected double pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates. |
| 22 | 33 KV line |
| 23 | (6.9) Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of hardware and strips. |
| 24 | (6.13) Fixing of 33 KV pin insulator with pins. |
| 25 | (7.1) Laying, jointing , stringing ,tensioning and clamping of conductor with propar sag as directed , using bolted type hardwere including binding on pin insulator ,jumpering on section points with binding wire P.G clamp Aluminum jointing sleeves will be used for jointing the conductor. The line must stand at propar voltage on charging .The contractor will be provide P.G clamp for which payment will be made at the prevaling Discom store issue rates. |
| 26 | (B) IN RURAL AREA |
| 27 | ACSR DOG |
| 28 | (7.3) Laying, jointing,stringing,tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc.including proper binding at each end.The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. |
| 29 | (B) IN RURAL AREA |
| 30 | G.I.Earth wire 6 SWG |
| 31 | (8.1) Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod 20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discom store issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom) |
| 32 | (11.11) Providing and fixing of G.I. Pipe B-Class (IS:1239 marks) at the starting and finishing point of 33 & 11 KV under ground cables and to lay & clamp vertically with the existing support including labour charges. |
| 33 | Providing and fixing of G.I. Pipe of 150 mm diameter. B-Class (IS:1239 mark),at the starting and finishing point of 33 KV under ground cables and to lay & clamp vertically with the existing support including labour charges. |
| 34 | (12.1) Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide) |
| 35 | (12.1.1) On new surface |
| 36 | (12.2) Painting with aluminium paint of approved brand and manufacturer to give an even surface.(including cost aluminium paint) |
| 37 | On new works with two coats. |
| 38 | (20.5) Laying of two ( D/C) 33KV, XLPE (Aluminium conductor) underground cables w/o overlapping as per relevant IS/ JVVNL standard including excavation of 50 cm width x 120 cm deep trench in Kaccha land.25 cm thick under layer of sand. 'A' class bricks or concrete block covering refilling soil in the remaining portion and providing/fixing cable route indicators at every 30Mtr.of cable and at every turn. |
| 39 | B) 3x 240 Sq mm to 3x400 Sq mm |
| 40 | (20.6) Installation of 33 KV Cable (XLPE) termination / straight through joints ( Heat shrinkable type) as per manufacturer's kit guidance and direction including preparation of cable and testing refilling etc as required.(Including crimping of lugs, including excavation/ removal/ fixing/ reaffixing/ testing etc.) as required. |
| 41 | (II) 3x240 Sq mm to 3x400 Sq mm |
| 42 | (20.14) For Extra Loop (Ghera) to be provided near the pole on termination point and the length of cable along the pole for mounting of cable jointing kit. |
| 43 | b) 33 KV Cable:- |
| 44 | 3X240 Sq.mm to 3X400 Sq.mm |
| 45 | 2. Labour Charges for Dismentaling of 33KV Line 132 KV GSS Sumerpur to 220 KV GSS Sumerpur |
| 46 | (5.1) Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra. |
| 47 | (5.1.3) Lattice Structure |
| 48 | (5.2) Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates. |
| 49 | (5.2.6) PCC Poles 9 Mtr. Long(400Kg.) |
| 50 | (6.9) Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of hardware and strips. |
| 51 | (6.13) Fixing of 33 KV pin insulator with pins. |
| 52 | (7.1) Laying, jointing , stringing ,tensioning and clamping of conductor with propar sag as directed , using bolted type hardwere including binding on pin insulator ,jumpering on section points with binding wire P.G clamp Aluminum jointing sleeves will be used for jointing the conductor. The line must stand at propar voltage on charging .The contractor will be provide P.G clamp for which payment will be made at the prevaling Discom store issue rates. |
| 53 | (B) IN RURAL AREA |
| 54 | ACSR DOG |
| 55 | Note-1.Dismentaling, if any: Dismentaling charges for all the items will be 60% of item rates of erection charges. However, charges for transportation of the material from works site in the Nigam/sub division store shall be paid as item rate of that material(Chapter-III, Transportation of material). The payment will be made after issuance of certificate by Engineer In Charge that all the dismentaled material has been safely received in the Nigam/sub division storeNote-2. The nut & bolts will be provided/supplied by the contractor which will confirm to relevant ISS & payment will be made as per prevailing Discom store issue rate.Note-3. The quality of material supplied by the contractor be got checked & approved by the circle SE. Note-4. In case of pole upper end of the GI wire provided for earthing shall be bolted with cross arm.Note-5. The qty mentioned for normal soil/ordinary rock. Hard soil which does not required drilling and Hard Rock/ CC road which required drilling are tentative & shall be payble as per actual site condition and due verification by Engineer In Charge.Note-6. Safe Carriage of PCC poles/other material including Loading/un-loading as per actual distance of work-site from place of lifting & shall be payble as per actual distance and due verification by Engineer In Charge. Note-7. Unit rates are inclusive of GST and shall be paid if applicable.Note-8. The work should be carried out as per specification and standard measurement of Jodhpur Discom. Please Enable Macros to View BoQ information |