Name of Work:- Silt Clearance From Intake Sump. And Delivery Tank of Pumping Station 1st or ps Iind of KLC
Sl. No.
Item Description
1
Hire charges Hydra crane 8 to 10 tone capacity With POL and operator etc
2
Removal of slit/soil/earth, sand, pebbles, Malba , debris, rubbish, stone pebbles &obstruction deposited in canal bed up to design line grade and sections having design due toerosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moistcondition from canal bed including dewatering, loading unloading and disposal at suitable place asdirected by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing oncanal bed complete in all respect Extra on item 7(c) only if silt clearance is done under water &mud.
3
Removal of slit/soil/earth, sand, pebbles, Malba , debris, rubbish, stone pebbles &obstruction deposited in canal bed up to design line grade and sections having design due toerosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moistcondition from canal bed including dewatering, loading unloading and disposal at suitable place asdirected by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing oncanal bed complete in all respect For depth above 30cm.Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and forevery additional lift of 1.5m or part there of including loading and un- loading wherever required
4
Removal of slit/soil/earth, sand, pebbles, Malba , debris, rubbish, stone pebbles &obstruction deposited in canal bed up to design line grade and sections having design due toerosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moistcondition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect For depth above 30cm.Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and forevery additional lift of 1.5m or part there of including loading and un- loading wherever required
5
Labour charges for making coffer dam/ring bund (under flowing / stagnate water pool) byloading transporting earth filled cement bags dropping at required locations in water including leadup to 3 km and lift up to 8 meter from NSL complete (excluding cost of earth filled cement bags).
6
Supplying of well stitched earth filled bags of capacity, weigh not less than 40 kg per bagat site etc. complete. Plastic bag
7
Carriage of Materials by mechanical transport including loading, unloading and stacking , ifstacking is not required no deduction is to be donestone, Aggregate, Ballast, Sand, Lime, Surkhi,Fly-ash, Morrum, Kanker etc.Lead up to 2 Km. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.