|
| 1 | Cleaning of septic tank of 10 to 25 users by removing sludge/waste material (night soil) inside the manhole, washing with water and disposing off sludge/waste material from site in a hygienic manner complete all as directed. |
| 2 | Cleaning of septic tank of 50 to 100 users by removing sludge/waste material (night soil) inside the manhole, washing with water and disposing off sludge/waste material from site in a hygienic manner complete all as directed. |
| 3 | Cleaning of septic tank of 200 to 1000 users by removing sludge/waste material (night soil) inside the manhole, washing with water and disposing off sludge/waste material from site in a hygienic manner complete all as directed. |
| 4 | Mechanically pumping out sewage water from Septic tanks/sump well where required and as directed with taking precautionary measurers including tools & plants as required and removing to place out side MOD land from the site complete(working in foul condition) complete all as specified and as directed. |
| 5 | Cleaning and removing all scale and dirt etc from sevice water tanks of capacity exceeding 500 ltrs and not exceeding 1000 ltrs and from mouths of circulating pipes,Date of cleaning to be written in synthetic enamel paint on all tank, after cleaning, size of letters shall be 50mm in height and text shall be “TANK CLEANED ON DD/MM/YYYY etc complete all as directed. |
| 6 | Cleaning and removing all scale and dirt etc from sevice water tank of capacity exceeding 1000 ltrs but not exceeding 2000 ltrs and from mouths of circulating pipes,Date of cleaning to be written in synthetic enamel paint on all tank, after cleaning, size of letters shall be 50mm in height and text shall be “TANK CLEANED ON DD/MM/YYYY etc complete all as directed. |
| 7 | Cleaning surfaces of RCC and AC sheet roofing RCC chajjah , sides of parapet walls by uprooting the unwanted vegetation and scrapping with steel wire brush ,watering and sweeping including taking down the leonine trees over roofs and removing the derbis to a distance exc 250m and n.exc.,500m complete all as directed. |
| 8 | Excavation in trenches, in soft/loose soil, not exceeding 1.5 m wide and not exceeding 1.5 m in depth, for foundation etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out complete all as directed. |
| 9 | M&L for 150mm bore Reinforced concrete pipes, class NP2, laid and jointed complete with collars including taking out existing old existing pipe complete all as directed |
| 10 | M&L for cement concrete bed 1:3:6 type C2 to drain pipe 150 mm bore including packing under and hunching against the sides of pipes after they laid and tested including demolition of old concrete and removing debris outside of MOD land complete all as directed. |
| 11 | Returning, filling in, including spreading leveling watering and well ramming in layers not exceeding 25cm thick using soil complete all as directed. |
| 12 | Removing excavated material to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as directed. Please Enable Macros to View BoQ information |
| 13 | Removing excavated material to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as directed. Please Enable Macros to View BoQ information |