|
| 1 | Sch 'A' Part-I (Building Works)Construction of office accn with sanitation ancillaries with permanent specification all as per drawing and directed by Engineer-in-ChargeNote: Not Prepriced at par with SSR Part-II (2020) at Serial Page No 20 and contractor has to quote the estimated amount under Col 6 |
| 2 | Sch 'A' Part-II (Sec-I) (Internal Water Supply Works)Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 22 and contractor has to quote the estimated amount under Col 6 |
| 3 | Sch 'A' Part-III ( Plumbing Works)Note:- Prepriced at par with SSR Part-II (2020) at Serial Page No 22 and contractor has to quote the estimated amount under Col 6 |
| 4 | Sch 'A' Part-IV, Sec-I (Internal Electrification Works)Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 34 and contractor has to quote the estimated amount under Col 6 |
| 5 | Sch 'A' Part-IV Sec-II (Internal Electrification Works)Note:- This schedule is not pre priced by MES and the pre priced rate indicated as \\"Rs.0.00\\" under Col 5 signifies this fact only. |
| 6 | S&F Led 40W, 2 feet x 2 feet Backlit Panel Cool White Light (6500K) Recessed Panel for False-Ceiling Aluminium Housing for Efficient Performance . |
| 7 | Sch 'A' Part-V, (Road, Path & Culvert Works)Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 24 and contractor has to quote the estimated amount under Col 6 |
| 8 | Sch 'A' Part-VI, Sec-I (Sewage Works)Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 25 and contractor has to quote the estimated amount under Col 6 |
| 9 | Sch 'A' Part-VI, Sec-II (Sewage Works)Note:- This schedule is not pre priced by MES and the pre priced rate indicated as \\"Rs.0.00\\" under Col 5 signifies this fact only.ly. |
| 10 | M&L for septic tank for (50 users) in any type of soil, size 4.00 m length, 1.40 m breath, 1.60 m depth single chamber with thickness of slab 100 mm and RCC baffle wall of thickness 80 mm complete all as per detail of reinforcement and drawing as mentioned in TD-CE/AF/STD-15/2000, sheet Np 1/2 and 2/2 dated 05 Jan 2000, with doundation in PCC 1:2:4, brickwork and plaster in CM 1:4 with using sub class ‘B’ old size brick, RCC slab covers including RCC precast manhole cover having 6 mm plate embedded all around/fibre reinforced cover with angle iron frame vent shaft and sludge chambers etc complete all as specified and directed |
| 11 | M & L Soakage wells excavation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonry with top ring of M-25 concrete including intercepting chamber and screen chamber made of brick masonry in CM, RCC cover slab in M-25/SFRC cover, interconnecting pipes of RCC/DWC complete filled with brick bats of size 1.2 M dia x 3.00 M effective depth |
| 12 | S&F 150 mm bore, HDPE Double Wall Corrugated Pipe in any length with rubber ring joints, laid in trenches for sewage pipe complete all as specified and as directed. |
| 13 | Sch 'A' Part-VII, (Sec-I) (External Electric Supply Works)Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 36 and contractor has to quote the estimated amount under Col 6 |
| 14 | Sch 'A' Part-VII, (Sec-II) (External Electric Supply Works)Note:- This schedule is not pre priced by MES and the pre priced rate indicated as \\"Rs.0.00\\" under Col 5 signifies this fact only. |
| 15 | M&L for cutting the existing Bituminous/Hard Standing road surface for laying of castile/Gi Pipe Cum etc and providing Plain cement concrete (1:2:4) type 82. using 20 mm graded stone aggregate for filling up the area of road cutting surfaces and making good the disturbed surface with exosting surface and all as specified and directed by Engr-in-Charge Note Excavation earthwork and PCC will be measured and paid separately under respective items |
| 16 | S & F Cable route indicators. The cable route indicators comprises for the followings:- Note:-1. The cable indicator shall be made up of CI round 100 mm dia welded fitted with MS angle Iron 40x40x6 mm, 45 CM long. The angle shall be grouted in PCC block 1:3:6 of size 150x150x150mm. The Cl round shall be embossed with the work\\" MES HT Cable.2. The unit rate of S & F of Cable indicators shall be deemed to included the above provision complete. |
| 17 | Supply, installation, commissioning and testing of totally enclosed incl taking down outdoor type LT Panel weldless cubical Kiosk in modular bolted construction type dust and vermin proof floor mounted type (IP-65 degree of protection) made out of 3 mm thick CRCA sheet of recommended size. All sheet metal parts separately chemically treated with 7 tank treatment process. The panel having both side opening door with locking arrangement.all doors fixed with Steel hinges with suitable size nut bolts and shall have flexible fixing of each switchgear and controlgrae compartment with cable alley tray of size not less than 30 cm, duly painted with two coats of synthetic enamel paint powder coated, bus bar 800 amps rating made of aluminium strip duly drilled holes for connections and mounted on epoxy based post insulators for 3 phase 4 wire 415 volts 50 HZ AC supply, hibling, cable entry boxes, cable gland and LT panel shall be mounted on iron angle frame made out of 50 X 50X 6 mm frame with 4 no. legs size not less than 45 cms fixed with nut bolts of suitable size (bottom portion of the panel). grouted by using foundation 1:2:4 type C1 with 20 mm graded stone aggregates totally tested as per IEC 61439-1, suitable for and including the following.(1) onload changeover switch 4p, 415 VAC cap 125 Amps.(ii) MCCB 4 pole with thermal based release rupturing cap 25 KA, 125 amps - 01 Nos for outgoing, Make-Legrand, equivalent make- Siemens 3VL/Schneider.(iii) MCB SPN 16 A, \\"C\\" Series 230 volts - 06 Nos for outgoing, Make-Legrand,Siemens 3VL/Schneider.(iv) Indicator set RYB-01 Set of 3 pcs only Make-L & T(v) Multifunction digital panel meter suitable to display amps, volts, frequency etc - 01No including CTs of appropriate ratio Make- Schneider cat no. 30002567 or equilent/ L &T/Legrand. (vi) All accessories prewired with suitable size copper conductor cable or strip including foundation as per manufacturer instruction all as specified and directed. |
| 18 | Sch 'A' Part-VIII (External Water Supply Works)Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 36 and contractor has to quote the estimated amount under Col 6 |
| 19 | Sch 'A' Part-IX (Site Clearance Works)Note:- Prepriced at par with SSR Part-II (2020) at Serial Page No 25 and contractor has to quote the estimated amount under Col 6 Please Enable Macros to View BoQ information |