| 1 | Supply & Laying For a 2000 kVA connection, the High Tension (HT) cable requirements depend on the input voltage (typically 11 kV or 33 kV) and local utility regulations. Based on standard industrial practices, a 3 Core x 185 sq. mm XLPE armoured aluminium cable is commonly required for 11 kV systems.Work will do as per engineer incharge. |
| 2 | Supply & laying of 400 Sq mm 3.5 Core L.T Cable aluminium cable For 11 K.V.A. Key LT Cable Full Load Current (LT side) Cable Type: XLPE Insulated, PVC Sheathed, Armoured Aluminium Cable Sizing (Typical Configuration) 3.5 Core x 400 sq. mm XLPE Cable. Work will do as per engineer incharge. |
| 3 | Supply & laying of 240 Sq mm 3.5 Core L.T Cable aluminium cable For 11 K.V.A. Key LT Cable Full Load Current (LT side) Cable Type: XLPE Insulated, PVC Sheathed, Armoured Aluminium Cable Sizing (Typical Configuration) XLPE Cable. Work will do as per engineer incharge. |
| 4 | Supply & Fixing of 2000 Amp load connection Make C.G or Schneider,cropmton, Abb. Voltage Rating: 11 kV (Nominal), 12 kV (Maximum) Rated Current: Typically, 800A is common for 2000 kVA, providing sufficient margin) Short Circuit Breaking Capacity: 13.1 kA to 21 kA for 3 seconds (21 kA is standard for many modern tenders). Making Capacity: 50 kA (peak). Type: Indoor/Outdoor, Sheet steel-clad, floor-mounted, metal-enclosed. Operation: Motor-operated spring charge with manual override (remote trip facility is generally required). Work will do as per engineer incharge. |
| 5 | C.T. For V.C.B Protective Relay & CT Requirements Protection Type: Overcurrent and Earth Fault (O/C & E/F) relays (typically self-powered or 230V AC operated). Current Transformers (CT): Cast resin/epoxy insulated ring type, typically 30/1A, 60/5A or 100/5A, Class 10P10 for protection. Panel Metering: Ammeter (0-60A/5A) and KV meter (0-15KV) with selector switches. Work will do as per engineer incharge. |
| 6 | S/F 11KAV HT Pole SP-55 11mtr long. Work will do as per engineer incharge. |
| 7 | S/F Tee channel. Work will do as per engineer incharge. |
| 8 | S/F Fuse set. Work will do as per engineer incharge. |
| 9 | S/F 11 kv T.P.M.O Complete. Work will do as per engineer incharge. |
| 10 | Earthing Road 11 KVA as per inincharge of enginner direction Supply and burying earth for lighting conductor of 900mm x 900mm x 3mm copper plate vertically with its top at least 3 metres below ground level complete with 20mm dia G.I. pipe for watering funnel, 30cm square C.I. frame with hinged cover masonry housing alternate layers of charcoal/coke and salt at least 150mm thick alround etc. as per directions of Engineer-in-charge complete in all respect. Work will do as per engineer incharge. |
| 11 | Supply & Fixing of 2500 KVA, 11/0.433 KV Class 50Hz ONAN Cooling typeThree Phase Copper Wound Oil Immersed, With Tapping Switch Dyn -11, type distribution transformer.Work will do as per engineer incharge. |
| 12 | Contingency/Supervision Charge 15% |
| 13 | GST Please Enable Macros to View BoQ information |