|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in charge. DSR 2023 SI 2.6.1 |
| 2 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. DSR 2023 SI 2.30.1 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR 2023 SI 2.27 |
| 4 | 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer’s specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. DSR 2023 SI 11.4 |
| 5 | 1:5:10 (1 cement : 5 coarse sand (zone-iii) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 2023 SI 4.1.10 |
| 6 | 1:3:6 (1 cement : 3 coarse sand (zone-iii) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023 SI 4.1.5 |
| 7 | Providin and Installation of Badminton Pole Height From Ground 5 feet with Nylon 9 ply Net, Fixed Type, 50mm NB Pipe , Height Adjuster including all labour and accessories required completion for the work. |
| 8 | Providin and Installation of Basket Ball Pole Single Pole Height From Ground 8 feet with 6\\" Round Mild Steen Pile, 18mm Acrylic Board, 21\\" 12 loops Net , 20mm solid bar ring including all labour and accessories required completion for the work. |
| 9 | Providin and Installation of Double See-Saw capacity of 4 children, Height 0.5 mts, Main frame 35mm NB GI Pipe and support 25mm N.B. GI Pipe, LLDPE Seat including all labour and accessories required completion for the work. |
| 10 | Providin and Installation of Cross Walker, with Main pipe-100mm NB A Class GI Pipe, and Other Pipe 50mm, 40mm, 32mm NB A Class GI Pipe, and Mild Steel Footrest including all labour and accessories required completion for the work. |
| 11 | Providin and Installation of Stepper with Glider with Main pipe-100mm NB A Class GI Pipe, and Other Pipe 50mm, 40mm, 32mm NB A Class GI Pipe, and Mild Steel Footrest including all labour and accessories required completion for the work. |
| 12 | Providin and Installation of Bridge Ladder Height 8 feet and Length 10 feet with Structure pipe-32mm A Class GI Pipe, Rung 25mm GI Pipe A Class including all labour and accessories required completion for the work. |
| 13 | Providin and Installation of Rainbow Climber Height 6 feet and Length 8 feet with Structure pipe-32mm A Class GI Pipe, Rung 25mm GI Pipe A Class including all labour and accessories required completion for the work. |
| 14 | Sign Board Painting and Photography and other Miscellaneous Work. Please Enable Macros to View BoQ information |