| 1 | Barricading of pipe line of trenches by using bamboopoles, caution tape etc for safety purpose Including all labor, material T&P etc complete. (10% of total length proposed to be barricded) |
| 2 | Dismantling of Chauka Stone roads for laying of sewer including sorting out and stacking of serviceable materials and disposal of unservice- able materials up to a distance of 50m. |
| 3 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m and lead upto 50 m filling, watering and ramming of excavated earth into the trenches and disposal of surplus earth upto a distance of 50 m from the centre of the foundation trenches. (a) 00.00 m-01.50 m B.G.L. |
| 4 | Supply of (ø200mm) DI-K7 pipe packing and forwarding charges, transit insurance charges etc. |
| 5 | Supply of (ø150mm) DI-K7 pipe packing and forwarding charges, transit insurance charges etc. |
| 6 | Supply of (ø100mm) DI-K7 pipe packing and forwarding charges, transit insurance charges etc. |
| 7 | Supply & fixing of specials/fittings (Bend, Tee, reduser, Elbow etc) during laying of pipe line Includeding all labor, material T&P etc complete work.(10% of total pipe cost) |
| 8 | Carting of following size of pipes and specials from store to the site of work within 8kms, lowering the same into trenches and laying true to the alignment and gradient including jointing the same properly and testing of pipe line including cutting of pipe for the making the required lengths as per design.a (ø200mm) DI-K7 pipe |
| 9 | Providing following size of C.I.D/F Sluice Valve (ø100mm) of various size given below including railway freight, insurance charge, loading, unloading & stacking, etc complete. |
| 10 | Providing following size of C.I.D/F Sluice Valve (ø200mm) of various size given below including railway freight, insurance charge, loading, unloading & stacking, etc complete. |
| 11 | Carting of following size of sluice valves from more to site of work, lowering in already prepered trenches and fixing them in position including cost of jointing materials and proper completion of work.100mm dia. |
| 12 | 200mm dia. |
| 13 | Unforseen Item during work like leakage, sewer line damage, Electric cable repairing etc complete work. |
| 14 | Construction of Sluice Valve chamber masonary type, provide all materials brick work, plastering, CC work and labor T&P etc required for proper completion of work etc. |
| 15 | Supply of frame cover mm RCC material for water connection chamber Including transpor-tation, loading, unloading ete complete work. |
| 16 | Dewatering work at site during laying/shifting of water line Including dewatering pump/diesel/labour etc complete. |
| 17 | Shifting new water connection with ferrule connection to distribution mains new line with material, labor, cost of fittings and specials, T&P etc complete work. |
| 18 | Provision for Inter-connections from Old existing pipe line (110mm)PVC to new pipe line (100mm) D.I as per requirement & direction of Engineer Incharge Including supply of all materials, Labor T&P etc complete. |
| 19 | (ø100mm) DI-K7 pipe |
| 20 | (ø150mm) DI-K7 pipe |
| 21 | (ø200mm) DI-K7 pipe |
| 22 | Repairing work of damaged sewer chamber during work Including labor, material, T&P etc complete. |
| 23 | Supply of GSB and spreading the same into the trech with all material, labour, T&P etc complete in all the respect. |
| 24 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exeeding 10km. from the site of work and Including watering, dressing, etc. rate to include the cost of all materials, labour, T&P etc. required for proper completion of work. |
| 25 | Fabrication work like welding, grinding, cutting etc at site during work Including all labor, material, T&P etc complete. |
| 26 | Restoration work of Chauka stone road watering, ramming, leveling, black top, required machinery equipment all labor, material T&P etc complete work. |
| 27 | Provision for site clearance and disposal of surplus earth, malba after construction period with all labor, T&P etc complete. Please Enable Macros to View BoQ information |