|
| 1 | Providing and fixing new pump shaft of approved quality with chrome metal turning milling and grinding complete in all respect as per direction by Engineer-in-Charge. |
| 2 | Casting & turning of new impeller with bronze metal complete in all respect as per direction by Engineer-in-Charge. |
| 3 | Repair of Impeller Brazing & turning complete in all respect as per direction by Engineer-in-Charge. |
| 4 | Providing and fixing new Distance bush,Spacer bush,diffusser ring,Body neck ring,Diffuser bush complete in all respect as per direction by Engineer-in-Charge. |
| 5 | Repair of Pump bodies brazing & turning complete in all respect as per direction by Engineer-in-Charge. |
| 6 | Casting & fixing of new pump bodies complete in all respect as per direction by Engineer-in-Charge. |
| 7 | P/F New shaft protection sleeve with chucknut set for pump complete in all respect as per direction by Engineer-in-Charge. |
| 8 | Pump bodies boring & matching with impeller size complete in all respect as per direction by Engineer-in-Charge. |
| 9 | Suction & Delivery body boring as per size complete in all respect as per direction by Engineer-in-Charge. |
| 10 | Casting & turning of new diffusser complete in all respect as per direction by Engineer-in-Charge. |
| 11 | Providing and fixing new Gaskit set ISI marked complete in all respect as per direction by Engineer-in-Charge. |
| 12 | Providing and fixing new Coupling set UBC 4A Unimac ISI marked complete in all respect as per direction by Engineer-in-Charge. |
| 13 | P/F Bearing bracket with cover, gland plate & gland bush complete in all respect as per direction by Engineer-in-Charge. |
| 14 | Impeller Balancing complete in all respect as per direction by Engineer-in-Charge. |
| 15 | P/F Bearing NU 7305 BE2RZP (SKF) ISI marked complete in all respect as per direction by Engineer-in-Charge. |
| 16 | P/F Bearing NU206 ECJ (SKF) ISI marked complete in all respect as per direction by Engineer-in-Charge. |
| 17 | Providing adapter sleeve locking YSA 2062FK ISI marked complete in all respect as per direction by Engineer-in-Charge. |
| 18 | Providing and fixing new Low Pressure pipe ISI marked complete in all respect as per direction by Engineer-in-Charge. |
| 19 | Carriage of pump from site to work shop and back to site with complete testing including mannual carriage.complete in all respect as per direction by Engineer-in-Charge. Please Enable Macros to View BoQ information |