| 1 | Earth work in all kind of soil for excavation of foundation within initial lead of 50m. and lift of 1.50m including rough dressing, breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth As per direction of Engineer in charge . |
| 2 | Supplying Sand with filling in foundation and plinth with approved river sand well watered and rammed.including cost, conveyance, royalty taxes of all metarials, etc completed as per the direction of the Engineer-in-charge. |
| 3 | Plain Cement Concrete (1:3:6) using 40 mm size H.G. metal ( crusser brocken) well rammed including cost, conveyance, royalty taxes of all metarials, etc completed as per the direction of the Engineer-in-charge. |
| 4 | Fly Ash Brick masonary of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. per sqr.cm. in cement mortar of mix (1:6) in super structure with all cost ,carraige & all taxes etc. complete in all respect as directed by the Engineer-in charge. |
| 5 | Providing and laying Cement Concrete M20 using 20mm size down graded B.H.G. chips for R.C.C. works including cost, carraige, rayality of all materials and machinaries and labours,( including centring & shuttering ) lifts etc complete as per approved drawings & specification & direction of the Engineer-in-charge. (A) Column footings |
| 6 | (B) Plinth Band |
| 7 | ('C) Column & Beam |
| 8 | (D) Lintel |
| 9 | ('E) Stair Case |
| 10 | (F) Roof Slab |
| 11 | Supplying, cutting, bending, binding, straightening the reinforcement HYSD steel bar of different diameters including quality control testing charges complete as per specification & direction of Engineer-in-charge. |
| 12 | Fly Ash Brick masonary of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. per sqr.cm. in cement mortar of mix (1:6) in super structure with all cost ,carraige & all taxes etc. complete in all respect as directed by the Engineer-in charge. |
| 13 | 6mm thick C:P (1:4) to R.C.C. surface finished smooth including closed deep chipping and slurry treatment. |
| 14 | 12 mm thick plaster with cement mortar (1:6) over stone/brick masonary |
| 15 | 16 mm thick plaster with cement mortar (1:6) over stone/brick masonary |
| 16 | Supplying,fitting ,fixing of G.I plate of Rolling Shutter including all cost of materials , labour, conveyance etc. complete. |
| 17 | Cement washing 1 coats with all cost, carraige & all taxes complete as per direction of Engineer in charge. |
| 18 | Painting with Enamel paint of approved quality and shade over surface with 2 coats over 1 coat of epoxy primer etc. |
| 19 | Finishing walls with weather coat of approved shade on new work 2 coats to to give an shade over 1 coat of wall primer |
| 20 | Plastic emulsion paint of approved quality and shade over surface with 2 coats over 1 coat of primer etc. |
| 21 | 2.5cm thick A.S flooring with cement concrete (1:2:4) including punning using 12mm size H.G.C.B chips including all cost etc. complete. Please Enable Macros to View BoQ information |