| 1 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcol, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 2 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP incl. conveyance of materials. |
| 3 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 numbers poles excluding loading & unloading charges. |
| 4 | Additional rate for providing one disc set, PG clamp etc. Complete, on any type of HT pole for making cut point. |
| 5 | Excavation of cable trench of appropriate size (normally 1.2m deep and 0.35m/0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consoldating the soil in layers of 75cm (excluding laying cable). |
| 6 | Laying HT XLPE UG cable of size beyond 3x185 sqmm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.Ipipes at road crossing/culverts/bridges etc. Wherever necessary, providing idendification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfillling. |
| 7 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole incl. conveyance of materials |
| 8 | Doing one cable end termination on HT XLPE UG Cable of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. compelete as per the direction of the departmental officers. |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport vehicle). |
| 10 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing) |
| 11 | Fitting and providing one HT stay for 11KV pole, including digging and back filling pit in ordinary soil. |
| 12 | Stringing of one 11KV line with ACSR Racoon( 3 conductors) after fitting insulators and givinf jumper connections including cutting and removing tree branches wherever necessary excluding cut point works. |
| 13 | Fitting one set AB switch on existing DP, giving connection and drawing suffcient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 14 | Drilling hole of various sizes on existing Channel/Cross arm |
| 15 | Fitting and erecting one HT Double Pole Structure using A type Pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 16 | Providing stay for LT poles including digging & back filling pit in ordinary soil. |
| 17 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. attached thereon and stacking the same |
| 18 | Erecting one LT PSC pole in position including. digging and back filling pit in ordinary soil. |
| 19 | Providing concrete muffing of size 0.45x0.45x10.5m(0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 20 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store |
| 21 | Mounting and connecting HT XLPE UG Cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc. including cost of extra materials if needed and giving necessary jumper connections. |
| 22 | Additional rate for excavation of cable trench of appropriate size (normally 1.2m deep and 0.35m /0.5m wide for single/double run) in exceptionally hard conditions (like in ordinary rock). * (As per the PWD Standard Data book, ordinary rock is defined as any material which can be quarried or split with crowbars or wedges). |
| 23 | Stringing of 11 kV Aerial Bunched cable of size 3x120+1x95 sqmm with bare/insulated messenger through existing poles |
| 24 | Erection of Anchor clamp/dead end clamp for 11 KV ABC of any size |
| 25 | Dismantling (without damage) one 11 KV PSC/RCC pole after disconnecting stays , strut etc. attached thereon and stacking the same. |
| 26 | Dismantling (without damage) one Km LT three ph 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 27 | Dismantling (without damage) one Km LT additional conductor line by dismantling cross arms, insulators and stacking the conductor in rolls properly. |
| 28 | Stringing, shackling, fitting cross arm, insulators and binding, giving jumper connection etc. using ACSR Rabbit for phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 29 | Dismantling one suspension clamp from 11 KV ABC |
| 30 | Dismantling one anchor clamp /dead end clamp from 11 KV ABC |
| 31 | Erection of suspension clamp for 11 KV ABC of any size |
| 32 | Dismantling of 11 KV Aerial Bunched Cable XLPE insulated of size 3x120+1x95 sqmm with bare insulated messenger |
| 33 | Loading 3x300 sqmm XLPE cable from its place of storage to department lorry and properly without causing any damage to its insulation and make ready for transporting as per the direction of department officers. (cost index(e) : 1 included in Rate) |
| 34 | Dismantling (without damage) one km 11kv line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 35 | Doing straight joint of 3x300 mm2 11 KV XLPE cable very carefully observing directions of manufacturers and departmental staff including crimping of socket (cost index€ : 1 included in Rate) |
| 36 | Doing one cable end termination on HT ABC of sizes upto 3x150+1x120 sqmm and connecting to existing MVT or other terminals, using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 37 | Fitting one no MVT on existing cross arm excluding termination work ( for one phase) of any rating for 11 KV AB cable Please Enable Macros to View BoQ information |