| 1 | Total Price for \\"FRP piping E&C of FGD covering receipt from stores/ yard located within project premises, arranging their issue, transportation to site, temporary storage prior to erection, if required, cleaning, erection, alignment, hydraulic test, , all pre-commissioning tests, PG Test and handing over of system to BHEL / Customer etc all complete, reconciliation of materials issued to contractor & returning unused materials to BHEL stores/ yard/ places designated by BHEL OR CUSTOMER etc for 3x660 MW FGD at North Karanpura Site, Jharkhand\\", as per tendered scope and terms & conditions. VOLUME-IIIPRICE SCHEDULE, REV-00 Job: FRP piping E&C work at 3 X 660 MW North Karanpura STPP FGD project, Jharkhand. TENDER NO.- PSER:SCT-NKP-P2421:26:11437, dated 30-03-2026 Name of the Bidder/ Bidding Firm / Company : 0.0 SL. No. PREAMBLE |
| 2 | This preamble forms part of tender document and schedule of items. The tenderer should read this preamble carefully before filling in rates for various items. Clauses under this preamble shall be read in conjunction with various volumes of tender and other tender sections as applicable and shall have precedence over any contrary statement mentioned anywhere in this document. |
| 3 | Items of work provided in this schedule but not covered in this specification shall be executed strictly as per instruction of the engineer. |
| 4 | Unless specifically mentioned otherwise in the tender document, the tenderer shall quote for the finished items and shall provide for the complete cost towards power, fuel, tools, tackles, equipment, constructional plants, temporary works, labour, strengthening of roads/culverts/bridges etc. including arranging all clearances etc. required for carrying out different activities & tests, materials, levies, transport, layout, repairs, rectification, maintenance, handing over, supervisions, establishments, overheads, profits and all incidental items not specifically mentioned but reasonably implied and necessary to complete the work according to the complete tender document and this schedule. |
| 5 | BHEL reserve the right to rationalize the rates, quoted by L-1 bidder against unit rate items and/ or other optional items with respect to item-wise lowest rates (amongst the participating bidders), before placement of order. |
| 6 | Rates shall be quoted in figures and in words in clear legible writing. No overwriting is allowed. All scoring and cancellations should be countersigned and in case of illegibility the interpretation of engineer shall be final. All entries shall be in English language. |
| 7 | All works item wise shall be measured upon completion and paid for at the rates quoted and accepted as per BHEL approvedpayment schedule/ billing break-up. |
| 8 | The tenderer shall be deemed to have visited site and made himself aware of all the site conditions, studied the specifications and details of work to the done within the time schedule attached and to have acquainted himself of the conditions prevailing at site before submission of his bid/offer. No claim whatsoever due to lack of knowledge of site conditions shall be entertained after award of the work. |
| 9 | No splitting of the job is envisaged unless the same is specifically indicated in the TCC / Vol-IF. Decision of BHEL in this regard shall be final and binding to the bidders. |
| 10 | Bidders are not allowed to alter the Price Schedule format including item description, quantity etc. and the offer is liable for rejection if the bidders submit their prices in Price Schedules modified by them. BHEL reserves the right to reject the offers of bidders who submit offers in Price Formats which are modiified/ altered by them. Also putting any comments instead of rates/price in the designated column of the rate schedule shall make the offer liable for rejection. |
| 11 | Engineer’s decision shall be final and binding on the contractor regarding clarification of items in the schedule with respect to theother sections/volumes of the contract. |
| 12 | No interest, whatsoever, shall be payable by BHEL on the security deposit, any bank guarantee submitted or any amount due tosuccessful bidder/contractor. |
| 13 | Bidder's Total price shall be considered for evaluation unless stated otherwise. VOLUME-IIIPRICE SCHEDULE, REV-00 Job: FRP piping E&C work at 3 X 660 MW North Karanpura STPP FGD project, Jharkhand. TENDER NO.- PSER:SCT-NKP-P2421:26:11437, dated 30-03-2026 Name of the Bidder/ Bidding Firm / Company : 0.0 SCH-1-TOTAL PRICE SL. NO. DESCRIPTION PRICE SCHEDULE REF TOTAL PRICE (INR) |
| 14 | Total Price for FRP piping E&C of FGD covering receipt from stores/ yard located within project premises, arranging their issue, transportation to site, temporary storage prior to erection, if required, cleaning, erection, alignment, hydraulic test, , all pre-commissioning tests, PG Test and handing over of system to BHEL / Customer etc all complete, reconciliation of materials issued to contractor & returning unused materials to BHEL stores/ yard/ places designated by BHEL OR CUSTOMER etc for 3x660 MW FGD at North Karanpura Site, Jharkhand as per tendered scope and terms & conditions. NOTE |
| 15 | Bidder shall quote total price for at sl no 1.0 above. All other amounts/ rates of each item of works in respective schedules/ parts will be derived based on allocated weightages and rates calculated thereof. As such, any uncalled figure/ amount noted at any other place/ schedule of Volume-III will not be recknoed & will stand null & void. |
| 16 | Bidder to note that total price at Sl No. 1.0 above shall be considered for evaluation & awarding. As such grand total price should be complete in all respect for the full scope defined and considering all terms and conditions. |
| 17 | SCH-2 is the Break-up of Total price. Individual item rate at SCH-2 shall be derived as per allocated weightages against the Total Quoted Price at SCH-1. |
| 18 | Based on the itemwise weightages allocations, the amount for the individual items of the Bill of Quantity shall be arrived at. The rates of individual items shall be derived from the amount against each items after roundeding off. |
| 19 | Bidders to note that this is an item rate contract. Payment shall be made for the actual quantities of work executed at the unit rate arrived |
| 20 | Based on the itemwise weightage allocations, the amount for the individual items of the Bill of Quantity shall be arrived at and item rates calculated thereof. The rates of individual items shall be derived from the amount against each items and its quantity and weightage after rounding off to upto 8 decimal places. However, RA bill payment shall be done after rounding off the gross amount to two decimal points. Any adjustment, if required, due to such methodology, will be effected / adjusted in final bill. |
| 21 | Any item as per scope of work, if not included in the price quoted above and shown separately will not be taken cognizance of and the offer shall be liable for rejection. |
| 22 | Price format shall not be changed by bidder in any case and it may lead to cancellation of their offer. VOLUME-IIIPRICE SCHEDULE,REV-00 Job: FRP piping E&C work at 3 X 660 MW North Karanpura STPP FGD project, Jharkhand. TENDER NO.- PSER:SCT-NKP-P2421:26:11437, dated 30-03-2026 Name of the Bidder/ Bidding Firm / Company : 0.0 SCH-2-BREAK UP OF TOTAL PRICE SL NO DESCRIPTION UNIT OF MEASUREMENT QUANTITY ALLOCATED WEIGHTAGE OF TOTAL PRICE ITEM RATE (INR) |
| 23 | FRP PIPE OF SIZE 25NB OF PN10 RATING. |
| 24 | FRP PIPE OF SIZE 40NB OF PN10 RATING. |
| 25 | FRP PIPE OF SIZE 50NB OF PN10 RATING. |
| 26 | FRP PIPE OF SIZE 80NB OF PN10 RATING. |
| 27 | FRP PIPE OF SIZE 100NB OF PN10 RATING. |
| 28 | FRP PIPE OF SIZE 150NB OF PN10 RATING. |
| 29 | FRP PIPE OF SIZE 200NB OF PN10 RATING. |
| 30 | FRP PIPE OF SIZE 250NB OF PN10 RATING. |
| 31 | FRP 45 DEGREE ELBOW OF SIZE 40NB |
| 32 | FRP 45 DEGREE ELBOW OF SIZE 100NB |
| 33 | FRP 45 DEGREE ELBOW OF SIZE 150NB |
| 34 | FRP 45 DEGREE ELBOW OF SIZE 200NB |
| 35 | FRP 45 DEGREE ELBOW OF SIZE 250NB |
| 36 | FRP 60 DEGREE ELBOW OF SIZE 100NB |
| 37 | FRP 60 DEGREE ELBOW OF SIZE 200NB |
| 38 | FRP 60 DEGREE ELBOW OF SIZE 250NB |
| 39 | FRP 75 DEGREE ELBOW OF SIZE 150NB |
| 40 | FRP 75 DEGREE ELBOW OF SIZE 250NB |
| 41 | FRP 84 DEGREE ELBOW OF SIZE 50NB |
| 42 | FRP 84 DEGREE ELBOW OF SIZE 80NB |
| 43 | FRP 84 DEGREE ELBOW OF SIZE 100NB |
| 44 | FRP 84 DEGREE ELBOW OF SIZE 150NB |
| 45 | FRP 84 DEGREE ELBOW OF SIZE 200NB |
| 46 | FRP 84 DEGREE ELBOW OF SIZE 250NB |
| 47 | FRP 90 DEGREE ELBOW OF SIZE 25NB |
| 48 | FRP 90 DEGREE ELBOW OF SIZE 40NB |
| 49 | FRP 90 DEGREE ELBOW OF SIZE 50NB |
| 50 | FRP 90 DEGREE ELBOW OF SIZE 80NB |
| 51 | FRP 90 DEGREE ELBOW OF SIZE 100NB |
| 52 | FRP 90 DEGREE ELBOW OF SIZE 150NB |
| 53 | FRP 90 DEGREE ELBOW OF SIZE 200NB |
| 54 | FRP 90 DEGREE ELBOW OF SIZE 250NB |
| 55 | FRP STUB FLANGE OF SIZE 25NB OF PN10 |
| 56 | FRP STUB FLANGE OF SIZE 40NB OF PN10 |
| 57 | FRP STUB FLANGE OF SIZE 50NB OF PN10 |
| 58 | FRP FLANGE OF SIZE 80NB OF PN 10 |
| 59 | FRP FLANGE OF SIZE 100NB OF PN 10 |
| 60 | FRP FLANGE OF SIZE 125NB OF PN 10 |
| 61 | FRP FLANGE OF SIZE 150NB OF PN 10 |
| 62 | FRP FLANGE OF SIZE 200NB OF PN 10 |
| 63 | FRP FLANGE OF SIZE 250NB OF PN 10 |
| 64 | FRP BLIND FLANGE OF SIZE 150NB OF PN 10 |
| 65 | FRP 90 DEGREE EQUAL TEE OF SIZE 50NB |
| 66 | FRP 90 DEGREE EQUAL TEE OF SIZE 100NB |
| 67 | FRP 90 DEGREE EQUAL TEE OF SIZE 250NB |
| 68 | FRP 84 DEGREE EQUAL TEE OF SIZE 50NB |
| 69 | FRP 90 DEGREE UNEQUAL TEE OFSIZE 50X25NB OF PN 10 RATING |
| 70 | FRP 90 DEGREE UNEQUAL TEE OF SIZE 100X50NB OF PN 10 RATING. |
| 71 | FRP 90 DEGREE UNEQUAL TEE OF SIZE 200X150NB OF PN 10 RATING. |
| 72 | FRP 90 DEGREE UNEQUAL TEE OF SIZE 250X200NB OF PN 10 RATING. |
| 73 | FRP 84 DEGREE EQUAL TEE OF SIZE 250X200NB OF PN 10 RATING. |
| 74 | FRP CONCENTRIC REDUCER OF SIZE 50X25 |
| 75 | FRP CONCENTRIC REDUCER OF SIZE 80X50 |
| 76 | FRP CONCENTRIC REDUCER OF SIZE 100X50 |
| 77 | FRP CONCENTRIC REDUCER OF SIZE 150X80 |
| 78 | FRP CONCENTRIC REDUCER OF SIZE 150X100 |
| 79 | FRP CONCENTRIC REDUCER OF SIZE 150X125 |
| 80 | FRP CONCENTRIC REDUCER OF SIZE 200X100 |
| 81 | FRP CONCENTRIC REDUCER OF SIZE 250X150 |
| 82 | FRP CONCENTRIC REDUCER OF SIZE 250X200 |
| 83 | FRP FLANGE CONCENTRIC REDUCER OF SIZE 100X50 NB OF PN 10 RATING |
| 84 | FRP ECCENTRIC REDUCER OF SIZE 100X50 |
| 85 | FRP ECCENTRIC REDUCER OF SIZE 200X150 |
| 86 | FRP ECCENTRIC REDUCER OF SIZE 250X200 |
| 87 | FRP PIPE OF SIZE 50NB OF PN16 RATING. |
| 88 | FRP PIPE OF SIZE 100NB OF PN16 RATING. |
| 89 | FRP PIPE OF SIZE 125NB OF PN16 RATING. |
| 90 | FRP PIPE OF SIZE 150NB OF PN16 RATING. |
| 91 | FRP PIPE OF SIZE 200NB OF PN16 RATING. |
| 92 | FRP 45 DEGREE ELBOW OF SIZE 100NB |
| 93 | FRP 45 DEGREE ELBOW OF SIZE 125NB |
| 94 | FRP 90 DEGREE ELBOW OF SIZE 50NB |
| 95 | FRP 90 DEGREE ELBOW OF SIZE 100NB |
| 96 | FRP 90 DEGREE ELBOW OF SIZE 125NB |
| 97 | FRP 90 DEGREE ELBOW OF SIZE 150NB |
| 98 | FRP 90 DEGREE ELBOW OF SIZE 200NB |
| 99 | FRP FLANGE OF SIZE 50NB OF PN 16 |
| 100 | FRP FLANGE OF SIZE 100NB OF PN 16 |
| 101 | FRP FLANGE OF SIZE 125NB OF PN 16 |
| 102 | FRP FLANGE OF SIZE 150NB OF PN 16 |
| 103 | FRP FLANGE OF SIZE 200NB OF PN 16 |
| 104 | FRP EQUAL TEE OF SIZE 125NB OF PN16 |
| 105 | FRP EQUAL TEE OF SIZE 150NB OF PN16 |
| 106 | FRP EQUAL TEE OF SIZE 200NB OF PN16 |
| 107 | FRP UNEQUAL TEE OF SIZE 200X100NB OF |
| 108 | FRP CONCENTRIC REDUCER OF SIZE 150X100 |
| 109 | FRP CONCENTRIC REDUCER OF SIZE 200X100 |
| 110 | FRP CONCENTRIC REDUCER OF SIZE 200X125 |
| 111 | FRP ECCENTRIC REDUCER OF SIZE 150X125 TOTAL 1.0 Please Enable Macros to View BoQ information |