| 1 | Part A:- Restoration of 11KV OH Line |
| 2 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 9 Mtr. Long ST Poles with pit excavation [IS 2713 410 SP 33] |
| 3 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 8 Mtr. Long ST Poles with pit excavation [IS 2713 410 SP 15] |
| 4 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and Laying of 0.05 ACSR Conductor |
| 5 | Supply,installation, testing and commissioning of Galvanized Nuts and Bolts of sizes. |
| 6 | Providing & fixing of GI Channel cross-arm 75x40x40 x6mm with GI Angle Pole Top Bracket (50x50x6 mm) including back clamps of 50X8 mm for fixing Cross arm and pole top bracket . |
| 7 | Supply,installation, testing and commissioning of 11 KV Polymeric Composit pin with insulator insulator 12 KV, 5 KN,Light Impulse 75 KVPositive and 80 KV Negative ,Creepage distance 320 mm |
| 8 | Supply,installation, testing and commissioning of Straight through jointing Kit 400 mm Sq |
| 9 | Supply,installation, testing and commissioning of Straight through jointing Kit 185 mm Sq |
| 10 | Providing and fixing of 3 phase, 415V, 1no of 250 Amp incoming 4P MCCB (Breaking Capacity 36kA) fitted with outgoing 03 No 100 Amps SP MCCBs, 1No.100Amps 3 pole MCCB for outgoing LT cables, Distribution feeder Pillar suitable for outdoor installation , made out of CRCA sheet painted through 7-tank process with PU painted Busbars 4P, Aluminium with heat shrinkable sleeves and adequate capacities complete with all accesories 4 way Distribution Feeder Pillar |
| 11 | Providing and fixing of Support Galvanised angle frame and legs (50mm x 50 mm x 6 mm) for Distribution Feeder Pillar , leg height 1m with 0.3m in soil approx 7m @4.50Kg per mtr |
| 12 | Providing and Laying of Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip (25x3 )mm |
| 13 | Providing and Laying of Cement grouting for support angle legs |
| 14 | Miscellaneous Works |
| 15 | Restringing of Old Loose Conductor /Channels arms affected due to snowfall/snowslides |
| 16 | Re erection of fallen poles affected due to snowfall/snowslides |
| 17 | Set right of tilted poles affected due to snowfall/snowslides |
| 18 | Pre and Post Geo tagged Photographic Evidence consisiting of 5x7 inch Photographs and Autocad Single Line Diagram Please Enable Macros to View BoQ information |