| 1 | Allied Material |
| 2 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 9 Mtr. Long ST Poles with pit excavation [IS 2713 410 SP 33] |
| 3 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 8 Mtr. Long ST Poles with pit excavation [IS 2713 410 SP 15] |
| 4 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and Laying of 0.05 ACSR Conductor |
| 5 | Supply,installation, testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 6 | Supply,installation, testing and commissioning of 185 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type |
| 7 | Providing & fixing of GI Channel cross-arm 75x40x40 x6mm with GI Angle Pole Top Bracket (50x50x6 mm) including back clamps of 50X8 mm for fixing Cross arm and pole top bracket . |
| 8 | Providing and Laying of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover |
| 9 | Supply,installation, testing and commissioning of LT Fuse Set for 63kva/100 kVA DTR |
| 10 | Supply,installation, testing and commissioning of GI Wire |
| 11 | Providing and fixing of Sundry Items like Aluminium Lugs, Jumpers, Binding Tape |
| 12 | Operation Charges of DT's light by way of Providing Skilled Labour force: |
| 13 | Carriage from Baltal camp to Different track location /camps of 25/63/100 kva DTs (to be provided by deptt) hilly terrain track .The job includes installation and charging also |
| 14 | upkeep and Operation and Maintenance of DTs by way of Providing Skilled labour force 1 electrician for 65 days at 8 different sites,in 2 shifts |
| 15 | upkeep and Operation and Maintenance of DTs by way of Providing Skilled labour force 1 unskilled labor for 65 days at 8different sites, in 2 shifts |
| 16 | Re-Errection of Substation structures including poles and allied material (material available at site) |
| 17 | Dismantling of 25/63/100 kva DTs after culmination of Yatra (to be Kept at safe location identified by site engineer ) hilly terrain track carriage . |
| 18 | P/F and carriage to Hilly Terrian 11KV Link Set (Post Type) Heavy Duty, Suitable for 400 - 630 Amp current capacity (IS: 9920 (Part-I to IV)) |
| 19 | Pre and Post Geo tagged Photographic Evidence consisiting of 5x7 inch Photographs and Autocad Single Line Diagram Please Enable Macros to View BoQ information |