| 1 | Earth work in excavation in all kind of soil with all leads and lift including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the engineer- in- charge. |
| 2 | Filling in foundation trenches, plinths, sites of foundation, in the space below the grade level slab and other underground structures with good quality river sand (inclusive of cost, conveyance, royalties, taxes, loading and unloading) laying in layers not exceeding 225mm in thickness, filling, watering and compacting / ramming, in each layers or complete as per specification, drawing and direction of the Engineer-in-Charge |
| 3 | Providing & laying cement concrete of prop (1:4:8) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. Complete. To the required levels including cost, conveyance, royality and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer in charge. |
| 4 | Providing Supplying & laying of 80 mm thick cement concrete interlocking paver block of M40 grade of approved make ,design ,colour and size made by block macking machine with proper compaction laid in required pattern etc.complete in all respect conforming to IRCSP-63-2018. |
| 5 | Providing & laying cement concrete of prop. (1:2:4) in road work using 12mm size crusher broken hard granite chips of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&p etc. as required for the work complete and as per direction of Engineer in charge. |
| 6 | Rigid smooth centering and shuttering for R.C.C work including false work and dismantling after casting including cost of all labour, materials, T&P required etc. as per the direction of Engineer in charge. |
| 7 | Removal of excavated earth & Dismantaling materials away from work site by mechanical means up to 5km lead and lift etc complete as per direction of Engineer in charge. Please Enable Macros to View BoQ information |