Name of Work:- lEidZ ekxZ bykgkckn mUuko ekxZ ls lksukeÅ eqnjlk rd dk [email protected] dk;Z okh; vuqj{k.k vof/k lfgr½
Sl. No.
Item Description
1
Excavation in foudation in ordinary soil inclduing lift upto 1.50 m and lead upto 30 m including filling watering and ramming of excavated earth into the trenches of in to the space between the building and the side of foundation trenches or into the plinth and removal and disposal of surplus earth as
2
W.B.M. Grading-3Providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 Kn in stages to proper gra
3
P/l cement concrete in 1:6:12 in foundation and under floors (1 cement :6 sand :12 brick ballast 40 mm gauge) including all supply of all materials labour tools
4
cement concrete with 20/10 mm gauge approved stone grit coarse sand 2.5fm and cement proportion of M20 1:1.5:3 including supply of all materials of all materials
5
Providing and laing of rubber moulded reflective zig-zag interlocking 80mm thick tiles of precast compressed c.c passing minimum 30mpa
6
M150 class brick work in 1:4 in cement and coarse sand in foudation and plinth including
7
The routine maintenance of above road work including earthen shoulder and interlocking road etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 1st year maintenance [email protected]%
8
The routine maintenance of above road work including earthen shoulder and interlocking road etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 2nd year maintenance [email protected]%
9
The routine maintenance of above road work including earthen shoulder c.c road pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 3rd year maintenance [email protected]%
10
The routine maintenance of above road work including earthen shoulder and interlocking road etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 4th year maintenance [email protected]%
11
The routine maintenance of above road work including earthen shoulder and interlocking road etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 5th year maintenance [email protected]% Item No. 1 to 07 cost of work (item no 07 to 11 Maintenance work) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.