| 1 | I) Storage Place |
| 2 | Hiring charges for 4 feet 20W LED fitting with 20W LED tube with suitable supporting poles which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 3 | Hiring charges for 4 feet 20W LED fitting with 20W LED tube on wall which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 4 | Hiring charges for 200W LED flood light fitting on existing support / wall which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 5 | Hiring charges for 6Mtr GI post for 200W LED flood light fitting with suitable clamps which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 6 | Hiring charges for Pedestal fan which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 7 | Hiring charges for 5A/15A plug board which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 8 | Hiring charges for 250A Panel Board incoming 250A TPN Switch with various range of TP/DP/SP MCB with angle iron frame work which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 9 | Hiring charges for 100 A Change Over switch which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 10 | Hiring charges for 250A Change Over switch which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 11 | Hiring charges for Earth pipe with necessary earthing connection which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 12 | Hiring charges for 2 of 3/20 sq.mm copper wire of 1100V grade with suitable PVC pipe which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 13 | Hiring charges for 2 of 7/20 sq.mm copper wire on suitable PVC pipe which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 14 | Hiring charges for 4 of 7/20 sq.mm copper wire with suitable PVC pipe which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 15 | Hiring charges for 4 of 7/16 sq.mm copper wire on bearer wire which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 16 | Hiring charges for 4 of 19/16 sq.mm copper wire on bearer wire which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 17 | Hiring charges for 4 of 185 sq.mm PVC Alu. LTUG armoured cable which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 18 | Hiring charges for 62.5KVA Diesel Generator set which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 19 | Hiring charges for 125 KVA Diesel Generator set which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 20 | Hiring charges for 2KVA UPS with 2 Nos 12V 150AH tall tubular Batteries which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 21 | Hiring charges for 5TR Split type AC indoor and out door units, interconnecting copper pipe, leakage testing, gas charging which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 22 | Hiring charges for 2 TR Split type AC indoor and out door units, interconnecting copper pipe, leakage testing, gas charging which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 23 | Hiring charges for 55 inch LED TV with stand which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 24 | Hiring charges for 2 Nos 32A Fuse unit (500V) on TW Board on wall which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 25 | Hiring charges for Single phase Imax-50kA surge protection devices which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 20 days. |
| 26 | II) Counting Centre (3 days) |
| 27 | Hiring charges for 4 feet 20W LED fitting with 20W LED tube on existing support / wall which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 28 | Hiring charges for 200W LED flood light fitting on existing support / wall which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 29 | Hiring charges for Pedestal fan which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 30 | Hiring charges for 5A/15A plug board which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 31 | Hiring charges for 250A Panel Board incoming 250A TPN Switch with various range of TP/DP/SP MCB which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 32 | Hiring charges for 100 A Change Over switch which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 33 | Hiring charges for 250A Change Over switch which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 34 | Hiring charges for Earth pipe which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 35 | Hiring charges for 2 of 3/20 sq.mm copper wire of 1100V grade on suitable PVC pipe which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 36 | Hiring charges for 2 of 7/20 sq.mm copper wire of 1100V grade on suitable PVC pipe which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 37 | Hiring charges for 4 of 185 sq.mm PVC Alu. LTUG armoured cable which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 38 | Hiring charges for 62.5KVA Diesel Generator set which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 39 | Hiring charges for 125 KVA Diesel Generator set which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 40 | Hiring charges for Air cooler with stand which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 41 | Hiring charges for Power Amplifier which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 42 | Hiring charges for 1x15 HF Loud Speaker which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 43 | Hiring charges for Wired mike / Cordless mike which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 44 | Hiring charges for 5TR Split type AC indoor and out door units, interconnecting copper pipe, leakage testing, gas charging which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 45 | Hiring charges for 2 TR Split type AC indoor and out door units, interconnecting copper pipe, leakage testing, gas charging which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 46 | Hiring charges for 55 inch LED TV with stand which includes installation and maintenance charges and also charges for conveyance of materials and other incidental charges including all necessary tools & plants with masonry / concrete elements / earth work excavation / refilling & redoing of dismantled portions to its original condition wherever necessary and as directed by the Departmental officers etc. complete for a maximum period of 3 days. |
| 47 | GST-18% Please Enable Macros to View BoQ information |