| 1 | item discription |
| 2 | Installation and commissioning of 1000mm wide x 468 mtr conveyor Belt in Panel No. P-2, RVIIC Seam, -5D/-20L to -23D/-20L of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit- 2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & stool-468mtr @68Kg/mtr=31.8MT+ 10 times Tail end shifting (shortning)- 10MT. total weight =63.4 MT (1000mm wide dual drive conveyor Belt of Depillaring Panel No. P-2 RVIIC Seam of -5D/-20L to -23D/-20L, length: - 468mtr.) |
| 3 | Fitting of tail end and discharge scraper. |
| 4 | Belt laying including transporting of belt, jointing, tensioning, trail run etc |
| 5 | Foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos |
| 6 | Cleaning of coal & unused materials before installation job |
| 7 | Fencing of drive ,loop take up & tail end |
| 8 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. |
| 9 | Cost of M.S. Nut bolts & washers |
| 10 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines |
| 11 | Drive base frame, Loop take up base & discharge base cement concrete |
| 12 | Installation and commissioning of 1000mm wide x 546 mtr conveyor Belt in Panel No. P3, -8L/-6D to -8L/-27D of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool- 546mtr @68Kg/mtr=37.12MT+ 15 times Tail end shifting (shortning)-15MT. total weight =73.72 MT (1000mm wide dual drive conveyor Belt of Depillaring Panel No. P-3, RVIIC Seam of -8L/-6D to -8L/-27D, length: - 546mtr.) |
| 13 | Fitting of tail end and discharge scraper. |
| 14 | Belt laying including transporting of belt, jointing, tensioning, trail run etc |
| 15 | Foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos |
| 16 | Cleaning of coal & unused materials before installation job |
| 17 | Fencing of drive ,loop take up & tail end |
| 18 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. |
| 19 | Cost of M.S. Nut bolts & washers |
| 20 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines |
| 21 | Drive base frame, Loop take up base & discharge base cement concrete |
| 22 | Installation and commissioning of 1000mm widex 676mtr conveyor Belt in common belt for Panel No. P-4 RVIIC Seam, -5D/-1L to -31D/-1L of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+load table-1MT+loop take up with tension trolley drum- 3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-676mtr @68Kg/mtr =45.96MT+16 times Tail end shifting (shortning)-16MT= total weight =82.56MT (1000mm wide dual drive conveyor belt of Development Panel no. P4, RVIIC seam of -5D/-1L to -31D/-1L, length: -676mtr.) |
| 23 | Fitting of tail end and discharge scraper. |
| 24 | Belt laying including transporting of belt, jointing, tensioning, trail run etc |
| 25 | Foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos |
| 26 | Cleaning of coal & unused materials before installation job |
| 27 | Fencing of drive ,loop take up & tail end |
| 28 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. |
| 29 | Cost of M.S. Nut bolts & washers |
| 30 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines |
| 31 | Drive base frame, Loop take up base & discharge base cement concrete |
| 32 | Installation and commissioning of 1000mm widex 630mtr conveyor Belt in common belt for Panel No. P-5, RVIIC Seam, 6L/-5D to 6L/-29D of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit 2.5MT+tail end -1MT+load table-1MT+loop take up with tension trolley drum- 3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc - 2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-630mtr @68Kg/mtr =42.84MT+16 times Tail end shifting (shortning)-16MT= total weight =80.44MT (1000mm wide dual drive conveyor belt of 6L/-5D to 6L/-29D in panel no. P5, of RVIIC seam, length: -630mtr.) |
| 33 | Fitting of tail end and discharge scraper. |
| 34 | Belt laying including transporting of belt, jointing, tensioning, trail run etc |
| 35 | Foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos |
| 36 | Cleaning of coal & unused materials before installation job |
| 37 | Fencing of drive ,loop take up & tail end |
| 38 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. |
| 39 | Cost of M.S. Nut bolts & washers |
| 40 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines |
| 41 | Drive base frame, Loop take up base & discharge base cement concrete |
| 42 | Installation and commissioning of 1000mm wide x 312mtr conveyor Belt in common belt for Panel No. P-6, RVIIC Seam, -16L/-5D to -10L/+7D of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+load table-1MT+loop take up with tension trolley drum- 3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-316mtr @68Kg/mtr =21.48MT+8 times Tail end shifting (shortning)-8MT= total weight =51.08 MT (1000mm wide dual drive conveyor Belt of Depillaring Panel No. P6, RVIIC Seam of -16L/-5D to -10L/+7D, length: - 312mtr.) |
| 43 | Fitting of tail end and discharge scraper. |
| 44 | Belt laying including transporting of belt, jointing, tensioning, trail run etc |
| 45 | Foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos |
| 46 | Cleaning of coal & unused materials before installation job |
| 47 | Fencing of drive ,loop take up & tail end |
| 48 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. |
| 49 | Cost of M.S. Nut bolts & washers |
| 50 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines |
| 51 | Drive base frame, Loop take up base & discharge base cement concrete |
| 52 | Estimation for Installation and commissioning of 1000mm widex 360mtr conveyor Belt in commonbelt for Panel No. P9(A), RVIIC Seam, -28L/-5D to -28L/9D of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit- 2.5MT+tail end -1MT+load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-360mtr @68Kg/mtr =24.48MT+9 times Tail end shifting (extension)-9MT= total weight =55.08MT (1000mm wide dual drive conveyor belt of Development Panel no. P9(A), RVIIC seam of -28L/-5D to -28L/9D, length: -360mtr.) |
| 53 | Fitting of tail end and discharge scraper. |
| 54 | Belt laying including transporting of belt, jointing, tensioning, trail run etc |
| 55 | Foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos |
| 56 | Cleaning of coal & unused materials before installation job |
| 57 | Fencing of drive ,loop take up & tail end |
| 58 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. |
| 59 | Cost of M.S. Nut bolts & washers |
| 60 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines |
| 61 | Drive base frame, Loop take up base & discharge base cement concrete |
| 62 | Installation and commissioning of 1000mm widex 364 mtr conveyor Belt in common belt for Panel No. P-4 & P-5 RVIIC Seam, -8L/-5D to 6L/-5D of CM Project at Nakrakonda- Kumardihi B Colliery under Bankola Area. Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit- 2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum- 3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc - 2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-364mtr @68Kg/mtr =24.75 MT total weight = 46.35 MT (1000mm wide dual drive conveyor belt of -8L/-5D to 6L/-5D in panel no. P4 & P5 of RVIIC seam, length: -364mtr.) |
| 63 | Fitting of tail end and discharge scraper. |
| 64 | Belt laying including transporting of belt, jointing, tensioning, trail run etc |
| 65 | Foundation, bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos |
| 66 | Cleaning of coal & unused materials before installation job |
| 67 | Fencing of drive ,loop take up & tail end |
| 68 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. |
| 69 | Cost of M.S. Nut bolts & washers |
| 70 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines |
| 71 | Drive base frame, Loop take up base & discharge base cement concrete |
| 72 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |