| 1 | Excavation in trenches not exceeding 1.5 m wide and not exc. 1.5 m depth for laying cables, foundation for pole, etc and getting out in soft/loose soil complete all as specified and as directed. |
| 2 | All as per item No 1 here in before but depth exceeding 1.5 m and not exceeding 3.00 m. |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming of soil in layers n. exc 25cm thick complete all as specified and as directed. |
| 4 | Removing excavated soil to distance n. exc 50m and depositing where directed at a level n. exc 1.5m above the starting point complete all as specified and as directed. |
| 5 | Materials and labour for sand filling around the cable with approved quality coarse sand for sand cushioning of Under ground cable including spreading and punning down to requirred thickness complete all as specified and as directed. (Note: Thickness of sand cushioning after punning down shall be measured for payment purpose) |
| 6 | M & L for XLPE insulated, PVC sheathed, armoured, heavy duty electric under ground cable, with stranded aluminium conductor, 1100 Volts grade of size 10 sqmm 2 core laid in trenches /floor or fixed on wall /pole in including brass compression cable glands, terminal lugs etc, including taking out old cable complete all as specified and as directed. |
| 7 | M & L for XLPE insulated, PVC sheathed, armoured, heavy duty electric under ground cable, with stranded aluminium conductor, 1100 Volts grade of size 35 sqmm 3.5 core laid in trenches /floor or fixed on wall /pole in including brass compression cable glands, terminal lugs etc, including taking out old cable complete all as specified and as directed. |
| 8 | Materials and labour for brick protection cover to underground cables with sub class ‘B’ over burnt brick of size 23 X 11.5 X 7.5 cm, (locally available best quality), laid dry and flat abutting each other with gaps not exceeding 10mm complete all as specified and as directed. |
| 9 | Dismantling unserviceable/old ACSR conductors of any size from over head lines, poles by removing binding wire, service wire, cables and removal from site complete all as specified and as directed. |
| 10 | M&L for ACSR conductors (weasel type) for LT OH lines on poles including stringing, binding with aluminium wire 14 SWG or aluminium tape including jumpers complete connecting of disconnected cable, service cable and street light connection complete all as specified and as directed. |
| 11 | Refixing only old ACSR conductor obtained from dismantling of old ACSR conductors for LT OH lines on poles including stringing, binding with aluminium wire 14 SWG or aluminium tape including jumpers complete all as specified and as directed. |
| 12 | M&L for erection and fixing of steel tubular swaged pole type 410 SP - 31 (9.00 metres long) confirming to IS- 2713 Part I to III 1980 with and including cast iron base plate, finial taper plug, nuts, bolts and washers etc. fixed in PCC foundation duly painted painted with two coats of Aluminium paint over a coat of red oxide primer with 30 cm of black,yellow and white paint upto 1.2m including preparation of surface and including dismsntling of old pole of any size and description with foundation, PCC coping etc. complete all as specified and as directed. |
| 13 | M&L for PCC 1:4:8, type D2 (using 40 mm graded stone aggregate) as in foundations, filling and mass concrete complete all as specified and as directed. |
| 14 | M&L for PCC 1:3:6, type C2 (using 40 mm graded stone aggregate) as in foundations, filling and mass concrete complete all as specified and as directed. |
| 15 | M&L for PCC 1:2:4 type B-1 (using 20 mm graded stone aggregate) as in coping for the new/existing Steel Poles, cills, including necessary formwork (straight or curved) complete all as specified and as directed. |
| 16 | M&L for GI pipe light grade 40mm bore with all fittings laid in trenches/walls/ floor/ poles/ road crossing including taking up/ down old pipe complete all as speciffied and as directed |
| 17 | M&L for GI pipe light grade 50mm bore with all fittings laid in trenches/walls/ floor/ poles/ road crossing including taking up/ down old pipe complete all as speciffied and as directed |
| 18 | S & F in repairs, LED street light of capacity 45 Watt made up of pressure die cast aluminium housing with high power LED as light source and lens embedded PC cover including electronic driver should have luminaries efficacy ≥110 lumens/watt, CRI>70 ,PF > 0.95,CCT≥5500,IP66,impact resistance IK 07 ,inbuilt protection against lightning , over voltage , short circuit and surge/spike protection device upto 10kV including minimum 1.5m service cable 4sqmm 2 core complete all as specified and as directed. Note: Contractor have to write date of changing in bold letter using permanent marker and submit minimum two years manufacturer warrantee certificate with purchase voucher on completion of work. |
| 19 | S & F in repairs, LED street light of capacity 60 Watt made up of pressure die cast aluminium housing with high power LED as light source and lens embedded PC cover including electronic driver should have luminaries efficacy ≥110 lumens/watt, CRI>70 ,PF > 0.95,CCT≥5500,IP66,impact resistance IK 07 ,inbuilt protection against lightning , over voltage , short circuit and surge/spike protection device upto 10kV including minimum 1.5m service cable 4sqmm 2 core complete all as specified and as directed. Note: Contractor have to write date of changing in bold letter using permanent marker and submit minimum two years manufacturer warrantee certificate with purchase voucher on completion of work. |
| 20 | M&L for light bracket made out of 40 mm bore medium grade GI Pipe with two sets clamps, with nuts and bolts, bend to shape all as directed, length of GI Pipe shall not be less than 1.20 metre including taking out old bracket of any description complete all as specified and as directed. Please Enable Macros to View BoQ information |
| 21 | M&L for light bracket made out of 40 mm bore medium grade GI Pipe with two sets clamps, with nuts and bolts, bend to shape all as directed, length of GI Pipe shall not be less than 1.20 metre including taking out old bracket of any description complete all as specified and as directed. Please Enable Macros to View BoQ information |