| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: GAIL Gas Limited, Noida Name of Work: Hiring contracts for Industrial and Commercial Connectivity for GAIL Gas Limited, Bengaluru CGD Project on ARC basis for a period of one year Tender Reference Number: GAILGAS/BLR/C&P/25-26/86NIC Tender Id: 2026_GAILG_273376_1 Do you want to quote for Bengaluru GA? Yes Name of the Bidder/ Bidding Firm / Company : 1 PRICE SCHEDULE1. This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. 2. Methodology for Selection of Contractor(s) shall be as mentioned Section-II of the Tender.3. Bidders are advised NOT to mention Rebate/Discount separately, either in the BOQ format or anywhere else in the offer. In case bidder(s) intend to offer any Rebate/Discount, they should include the same in the item rate(s) itself under the BOQ and indicate the discounted unit rate(s) only.In case, it is observed that any of the bidder(s) has/have mentioned Discount/Rebate separately, the same shall not be considered for evaluation. However, in the event of the bidder emerging as the lowest bidder, the Discount/Rebate offered by the bidder shall be considered for award of work and the same will be conclusive and binding on the bidder.4. In case, bidder has not quoted for particular Location, then bidder must not fill up the prices in BOQ. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description(refer SCC & SOW of tender document for complete details) SOR Item Serial Number Quantity Units Estimated Rate (Rs.)(Encluding GST) ATotal amount for SOR Line Items (1+2+3) including 18% GST (in Rs.) Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Unit Rate excluding GST In Figures To be entered by the Bidder (In Rs. ) Rate fixed by buyer Amount of GST on Basic Amount (in Rs.) Total Amount (Rs.) (excluding GST) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Total Amount (Rs.) (excluding GST) GST in Amount Total Amount [Inclusive of GST](Rs.) TOTAL TAXES It will be convert only If you choose Full Conversion, Until it will be treated as INR TOTAL AMOUNT In Words |
| 2 | Joint site visit of Industrial and Commercial Customers for connectivity |
| 3 | Preliminary Study of charged area and further connectivity planning etc. |
| 4 | Preparation of prelimanary action plan for connectivity. |
| 5 | Carrying out discussion with different agencies/ Industry/ commercial unit for getting pipeline connectivity including preperation of sketch/ drawing for possibile pipeline routes for gas conncetivity in consultation with PMC/ GAIL Gas. Job to be carried out as per detailed SCC & SOW. Job to be executed only after clearance of GAIL Gas Limited. |
| 6 | Monthly. After submitting required documents. |
| 7 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order |
| 8 | Providing Supervisory Services of Highly Skilled Resource, Resource shall be equiped with two wheeler along with fuel (CNG Bike/Scooter) for day to day cordination with GAIL Gas's Representative and for Liasoning with State Authorities/Utilities and other Departments. |
| 9 | Monthly. After submitting required documents. |
| 10 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order |
| 11 | Ground Connectivity Works |
| 12 | Laying of MDPE pipeline by any method in any type of soil strata upto 20m length from charged Pipeline to Customer premise including connection of Transistion Fitting at customer end.- Supply and installation of TF and construction of pedestral is in contrcator scope.- For pipeline laid more than 20m, payment for additonal length shall be covered in SOR no.3.1 in ruuning meters more than 20m. |
| 13 | PE 20mm dia |
| 14 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 15 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 16 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 17 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 18 | PE 32mm dia |
| 19 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 20 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 21 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 22 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 23 | PE 63mm dia |
| 24 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 25 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 26 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 27 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 28 | PE 90mm dia. |
| 29 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 30 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 31 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 32 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 33 | PE 125mm dia. |
| 34 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 35 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 36 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 37 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 38 | Survey, Pit Excavtion in all types of soills/PCC/RCC/Paver block/Ashpalt/Whitetopping etc., charged pipeline identification, Hook up activities, Online tapping either by Saddle / Tee / extension by Coupler for connecting the Pipeline laid as per above SOR 2.1 including fittings, Backfilling. Restoration shall be paid through other SOR |
| 39 | Connectiviy for PE 20mm dia laid under 2.1. |
| 40 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 41 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 42 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 43 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 44 | Connectiviy for PE 32mm dia laid under 2.1. |
| 45 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 46 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 47 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 48 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 49 | Connectiviy for PE 63mm dia laid under 2.1. |
| 50 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 51 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 52 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 53 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 54 | Connectiviy for PE 90mm dia laid under 2.1. |
| 55 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 56 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 57 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 58 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 59 | Connectiviy for PE 125mm dia laid under 2.1. |
| 60 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 61 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 62 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 63 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 64 | Liasioning and coordination works for carrying out connectivity work for SOR item 2.0Liaisoning with concerned land owning authorities- state authorities / owners / ( i,e BBMP/ BDA/KIADB/BMRCL/ KHB/GRAM PANCHAYAT/PWD/LOCAL ASSOCIATIONS & BODIES, BUILDER, RWA (resident welfare association)/society/individual land owners etc..) & also all other associated liaisoning work as required for smooth execution of pipeline laying and making the last mile connectivity works complete from the nearest available mainline works with any authorities such as BBMP / BDA / BWSSB, local area representatives, traffic police, police, BESCOM, BSNL, BWSSB, BMRCL etc. and any other utility companies /agencies such OFC operator etc . Repairing/replacement of all damaged utilities if any, and payment of any compensation (if claimed by Builder/RWA/Owner/other utility agencies) is in scope of the contractor.Payment charges towards demand note/ BG etc against the permission raised by the concerned authorities will be paid by GAIL Gas. |
| 65 | In- principal permission for laying of the pipeline from the concerned land-owning authority shall be obtained by Contractor |
| 66 | Payment for the length applied shall be paid after the completion of laying and testing. |
| 67 | Payment along with final bill. |
| 68 | PE PIPELINE |
| 69 | PE Pipe Laying in any type of surface like unprepared surface (Katcha surface)/ Normal Surface/ Hard surface/Rock surface etc using open cut/ Moling (without Casing)/ Moling (with Casing)/ Horizontal Directional Drilling technique (with and without casing pipe) methodology. For HDD in Rock surface payment shall be done as per SOR#3.2 |
| 70 | Receipt. Loading. unloading. storing. reloading. tranportation. unloading. stringing and laying of PE100. SDR11 line pipes of all sizes including. proper stacking. identification.and supply of accessories of all sizes & thickness like PE Bends. Couplers. Endcaps. Tee. Reducer. CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 90 mm). Warning Mat etc. Handling. Stringing / uncoiling. aligning of the PE line pipe on the pipeline Right-of-Use / route. laying / installation of PE line pipe alongwith required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storeage of material in contractor's store. fabrication. access for construction procurement and supply of all materials. consumables. equipments. labour and other inputs. |
| 71 | In the case of free issue items. the scope also includes. receiving and loading from Owner's designated store. transportation. unloading and stacking of free issue items at Contractor's store. -Laying of all PE pipe (PE 100 SDR11). Including supply of HDPE casing pipe (in case of HDD (with case).Moling(with case) . Couplers. End caps etc. (Ref. of Particular job specification).Survey of under ground utilities. execution of the work as per specification. including excavation of pits moling with the hole size not exceeding 20% of the pipe dia. jointing and insertion of carrier pipe with casing. testing & commissioning and restoration of the pits to original condition. submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge. |
| 72 | HDPE Casing details is as given below:-1. For 20mm PE pipe (min. 50mm, max. 50mm)2. For 32mm PE pipe (min. 50mm, max. 90mm)3. For 63mm PE pipe (min. 110mm, max. 160mm)4. For 90mm PE pipe (min. 200mm, max. 250mm)5. For 125mm PE pipe (min. 250mm, max. 315mm) |
| 73 | Carrying out all temporary. ancillary. auxiliary works required to make the PE pipeline ready for commissioning as per drawings. Specifications. scope of work indicated in PJS and other provisions of tender/ contract documents and instructions of Engineer-in-charge. including but not limited to carrying out the following works:Surveying of route and detours required at the time of execution. preparation of construction drawings showing survey details and submit same to Owner for review / approval. |
| 74 | Carrying out preliminary activities such as preperation of drawings wherever required for crossing etc.Preparation and getting approval of schedules. execution procedures. drawings/ sketches/ wherever required. making trial pits to determine the underground utilities/ services etc.. restoration of the abandoned trial pits to original condition. |
| 75 | Stacking and installation of construction markers. clearing. fencing. grubbing. cutting of trees. full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities. grading of work area. |
| 76 | Barricading the work area as per local authorities norms & to the satisfaction of Owner/ Eingineer -in- charge. installation of safety signs.Barricading the pipeline construction area prior to execution of the works as per drawing enclosed with tender/ contract documents and to the entire satisfaction of owner / engineer- in -charge. |
| 77 | Laying using open trench without casing includes survey of under ground utilities (through trial pits). execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata and different type of pavement / footpath / roads etc. including rock breaking. chiselling or otherwise cutting etc. as required and storing excavated soil. reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. |
| 78 | The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher.Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any. and payment of any compensation (if claimed by owner / other utility agencies)Uncoiling / stringing & aligning of PE pipes. clamping. jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification.Note:- Coordinates to be taken for implementation for GIS for Valve pit, Fusion welding location and MRS. |
| 79 | Installation / lowering the pipeline in trench to required depth as per PJS. Technical Specification & drawings. supply & placement of HDPE Yellow colour warning mat (refer PJS) over the pipeline along the complete route as per standard drawings. data sheets & technical specifications. padding around pipeline including supply of suitable padding material duly approved by EIC. Backfilling to its original condition with excavated earth / borrowed select soil/sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU. trench shall be backfilled & compacted and shall be made ready for motorable and no seperate payment shall be admissible against this activity.All tiles / slabs / curb stones etc removed during excavation shall be placed properly.Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities. |
| 80 | The scope of work against this item also include Electro-fusion jointing of valves. fittings wherever required and as directed by Engineer-in-charge.The scope of work against laying of 20 mm pipe also includes works like making of PCC pedastal of grade (1:2:4) and size ( (300mm(L)X200mm(W) XHeight (H)). (H>=300mm & will be as per site condition) ). supply and installation of GI Sleeve (Heavy (C-Class) as per IS-1239). filling of sand and installation of TF (along with supply). |
| 81 | Pneumatic testing. purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles. nitrogen. instruments. manpower and other related accessories and as per the instructions of the Engineer-in-charge. |
| 82 | Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge. |
| 83 | Maintaining the completed pipelines and installation for any defect or failures during defect liability period (i.e. 12 months from date of completion of work).Handing over the completed works to Owner for their operation/ use. reconciliation of material area wise and obtaining \\"no objection certificate\\" from Owner/ PMC.Preparation and submission of Daily progress report. Laying Graphs / PE line cards on daily basis. |
| 84 | On completion of gas charging of pipelines. Preparation and submission of As-built drawings. crossings details. termination. utility graphs and deviation statements.In case. the minimum required depth is not possible due to site condition. necessary mitigation measures with minimum permissible top cover shall be carried out by the contractor in consultation with EIC as per PNGRB Guidelines. without any time and cost implecation to owner. |
| 85 | Submission of all documents required for contract closure in numbers as mentioned in contract.Any other activities not mentioned / covered explicitly above. but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract. |
| 86 | 20 mm PE 100 pipe |
| 87 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 88 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 89 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 90 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 91 | 32 mm PE 100 pipe |
| 92 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 93 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 94 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 95 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 96 | 63 mm PE 100 pipe |
| 97 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 98 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 99 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 100 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 101 | 90 mm PE 100 pipe |
| 102 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 103 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 104 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 105 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 106 | 125 mm PE 100 pipe |
| 107 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 108 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 109 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 110 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 111 | NOTE i) The lengths of pipelines are tentative. ii) For restoration of asphalt / concrete roads. the item for construction of asphalt top / concrete top / Tiles/Stone slab/Paver Blocks/Curb Stones shall be paid separately as per the SOR 4 |
| 112 | Laying of Pipeline by HDD in Rock Terrain |
| 113 | 32 mm PE 100 pipe |
| 114 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 115 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 116 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 117 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 118 | 63 mm PE 100 pipe |
| 119 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 120 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 121 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 122 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 123 | 90 mm PE 100 pipe |
| 124 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 125 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 126 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 127 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 128 | 125mm PE 100 pipe |
| 129 | In continuous stretches of minimum 100 Mtrs. Including survey, online tapping either by Saddle/ Tee/extension by coupler, trench, less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, back-filling and compaction for the complete stretch as per the scope of work. |
| 130 | Testing of network, installation of Permanent Markers & Valve chambers. |
| 131 | Pre-Commissioning of the system with Nitrogen at positive pressure or Commissioning with gas charging of the PE pipeline (case decided by EIC) and material re-conciliation. |
| 132 | Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract Submission of final bill. |
| 133 | Restoration |
| 134 | Restoration of the roads. pavements. channels. footpaths. tiles. stones etc. to original condition including supply of the approved quality material required. as per local authorities norms. obtaining NOC from concerned local authorities / land owners / third party inspection agencies (if any) designated by owner and to the satisfaction of Engineer-in-charge. |
| 135 | Asphalt road: Restoration of bitumen Asphalt road after laying of pipeline as per the drawing no. MEC/23VT/01/11/D2/ST/LY/0211/R00/A3 , specifications and instruction of Engineer-In-Charge. Restoration of roads shall be done as per requirement of BBMP/ BDA/ KIADB/BMRCL/KHB/GRAM PANCHAYAT/PWD/LOCAL ASSOCIATIONS & BODIES, BUILDER, RWA and to get NOC from the concerned authorities. Restoration of the asphalt road cut portion for pipeline trench width shall be carried out by filling the bottom layer with good earth/Soil filling followed by 225mm thk. GSB & 250mm thk. WMM with top bituminous layers comprising of 50mm thk. DBM & 40mm thk. BC matching with the existing road top level. This item also includes disposal of surplus soil /debris with all lift & leads, cutting of Top layer of asphalt road by mechanized saw/cutters for maintaining straight line. |
| 136 | After Complete area wise restoration as per the standards (bidder may note that restoration work shall be carried out after successful testing and commissioning I gas charging in respective area). |
| 137 | After obtaining NOC from respective local authorities/third party agencies designated by land owing agencies. |
| 138 | After Completion of all works and closure of contract. |
| 139 | Restroration of the all kind of pathway: Restoration by using excavated material such as tiles/pavers/granite/red stone etc by providing PCC 1:4:8 of 50mm thickness below after compaction of the filled soil, fixing the Tiles/Paver blocks/Granite etc and matching it to the existing surface. Item includes providing of extra finished material if required.such as Tiles/Paver blocks/Granite etc matching to original pathways. The area restored shall be measured in Sqm. |
| 140 | After Complete area wise restoration as per the standards (bidder may note that restoration work shall be carried out after successful testing and commissioning I gas charging in respective area). |
| 141 | After obtaining NOC from respective local authorities/third party agencies designated by land owing agencies. |
| 142 | After Completion of all works and closure of contract. |
| 143 | Reinforced Concrete road/ Reinforced Concrete pavement: Restroration of reinforced concrete road and pavements shall be done by providing PCC 1:4:8 of 75 mm thick and RCC 1:2:4 of 100 mm thickness and providing 8 mm dia rod at 200 mm C/C. The cost of Shuttering, compacting the base surface etc.. are in the scope of this item. The area restored shall be measured in Sqm. |
| 144 | After Complete area wise restoration as per the standards (bidder may note that restoration work shall be carried out after successful testing and commissioning I gas charging in respective area). |
| 145 | After obtaining NOC from respective local authorities/third party agencies designated by land owing agencies. |
| 146 | After Completion of all works and closure of contract. |
| 147 | Installation of valve in pit including supply of valves |
| 148 | Supply of isolation valves (as per data sheet) and installtion of valves in the valve pits as per typical drawing and specification enclosed and instructions of Engineer-in-charge. Payment of valve pits shall be paid separately as per SOR. |
| 149 | PE Valve 32 mm dia |
| 150 | Upon supply of items including all Accessories and acceptance of supplied items at site. |
| 151 | Upon Complete installation of item's and all its associated work. |
| 152 | After submission of documents and closure of contract. |
| 153 | PE Valve 63 mm dia |
| 154 | Upon supply of items including all Accessories and acceptance of supplied items at site. |
| 155 | Upon Complete installation of item's and all its associated work. |
| 156 | After submission of documents and closure of contract. |
| 157 | PE Valve 90 mm dia |
| 158 | Upon supply of items including all Accessories and acceptance of supplied items at site. |
| 159 | Upon Complete installation of item's and all its associated work. |
| 160 | After submission of documents and closure of contract. |
| 161 | PE Valve 125 mm dia |
| 162 | Upon supply of items including all Accessories and acceptance of supplied items at site. |
| 163 | Upon Complete installation of item's and all its associated work. |
| 164 | After submission of documents and closure of contract. |
| 165 | Construction of Valve Pits as per the enclosed tender drawing and specification. The item includes supply of all the material including Pre-cast RCC cover. shuttering. reinforcement. labour. curing etc as per the drawings. specification and instruction of EIC. |
| 166 | Type-I having Internal size of Minimum 1000 x 1000mm |
| 167 | Upon supply and Complete installation of item’s and all its associated work. |
| 168 | After submission of documents and closure of contract. |
| 169 | Type-II having Internal size of Minimum 600 x 600mm |
| 170 | Upon supply and Complete installation of item’s and all its associated work. |
| 171 | After submission of documents and closure of contract. |
| 172 | Note: The tender drawing enclosed is only for reference purpose and contractor shall be required to prepare drawings (in line with reference tender drawing) for specific sizes of Valve pits and the same shall be approved by EIC. |
| 173 | Fabrication & Installation of Markers |
| 174 | RCC Route Markers |
| 175 | Supply, fabrication and installation of RCC route markers as per the attached drawing in technical volume, along the route including all associated civil works such as excavation and construction in all types of soils, construction and pedestals and grouting with concrete. |
| 176 | Upon supply of items including all Accessories and acceptance of supplied items at site. |
| 177 | Upon Complete installation of item's and all its associated work. |
| 178 | After submission of documents and closure of contract. |
| 179 | Pole Markers with Foundation |
| 180 | Supply, fabrication and installation of plate markers as per the attached drawings in technical volume including all associated civil works such as excavation and construction in all types of soils, construction and pedestals and grouting with concrete, cleaning, stencil let. |
| 181 | Upon supply of items including all Accessories and acceptance of supplied items at site. |
| 182 | Upon Complete installation of item's and all its associated work. |
| 183 | After submission of documents and closure of contract. |
| 184 | Warning Plate Markers |
| 185 | Supply, fabrication and installation of plate markers, including application of approved color and quality of primer and paint, stencil letter cutting of lettering, numbers, direction, etc. as per the attached drawing in technical volume to be installed near regulator. |
| 186 | Upon supply and Complete installation of item’s and all its associated work. |
| 187 | After submission of documents and closure of contract. |
| 188 | Excavation of Hard rock/surface |
| 189 | Excavation of trench or pits, wherever hard rock presence is exceeding 1.5 m in any direction of the trench and excavation of trench or pits in Malba/Multiple layers of asphalt/ brick / PCC/RCC etc and removable only by pneumatic chisel / drill as per the specifications and direction of EIC. The rates are payable over and above the Laying rates as per relevant SOR no. 3.1 |
| 190 | Cutting of PCC/RCC surface with thickness more than 12\\" or Continuous asphalt multi-layer/ Malba/ Brick / Boulders more than 24\\".(Malba shall be considered as a strata where soil is in mixed form of debris/building rubbish or discarded pieces of bricks/stones ) |
| 191 | After completion of the work in all respects. |
| 192 | After submission of documents and closure of contract. |
| 193 | Rock Cutting encountered while excavation of trenches for item 3.1 of SOR, including getting out the excavated soil and disposal of excavated soil as directed within a lead of 50 meter. In case of rocky soil, the bedding shall be done with approved/ good quality packing sand, subject to the approval of the EIC, the size distribution of the sand / shall be the same as per soil. The packing sand shall be placed to a minimum thickness of 150mm around the pipe in case of rocky terrain. |
| 194 | After completion of the work in all respects. |
| 195 | After submission of documents and closure of contract. |
| 196 | Note: i) The quantities mentioned are indicative only. ii) For all the supply items mentioned above, procurement shall be made as per specification after due approval of engineer- in - charge. |
| 197 | Liaisoning with Land Owning Agencies for Permission |
| 198 | Liasioning works for carrying out connectivity for SOR item 3.0 Liaisoning with concerned land owning authorities- state authorities / owners / ( i,e BBMP/ BDA/ KIADB/BMRCL/KHB/ GRAM PANCHAYAT/ PWD/ LOCAL ASSOCIATIONS & BODIES, BUILDER, RWA (resident welfare association)/society/individual land owners etc..) & also all other associated liaisoning work as required for smooth execution of pipeline laying and making the last mile connectivity works complete from the nearest available mainline works with any authorities such as BBMP / BDA / BWSSB, local area representatives, traffic police, police, BESCOM, BSNL, BWSSB, BMRCL etc. and any other utility companies / agencies such OFC operator etc . Repairing/replacement of all damaged utilities if any, and payment of any compensation (if claimed by Builder/RWA/Owner/other utility agencies) is in scope of the contractor. |
| 199 | In- principal permission for laying of the pipeline from the concerned land-owning authority shall be obtained by Contractor |
| 200 | Payment for the length applied shall be paid after the completion of laying and testing. |
| 201 | Payment along with final bill. |
| 202 | Construction of RCC structure for protection of service line for drain/nallah Crossings |
| 203 | Construction of Non suspended slabs/pavement slabs including pedestal/ramp etc.using reinforced cement concrete of M-25 grade (Concrete shall be design mix/nominal mix with 20 mm & down size graded crushed stone aggregates) to protect the PE pipe laid. All necessary form work, finishing the top surface rough/smooth as required in any position, shape, level and thickness etc. shall be as specified and directed by EIC. The rates shall include grouting of pockets, supply of all material, tools, reinforcement steel etc. |
| 204 | Upon supply and Complete installation of item’s and all its associated work. |
| 205 | After submission of documents and closure of contract. |
| 206 | CIVIL WORKS |
| 207 | Earth Work |
| 208 | Upon supply and Complete installation of item’s and all its associated work. |
| 209 | After submission of documents and closure of contract. |
| 210 | Earth in excavation and filling to the grades and levels shown in the approved drawings in all kinds of conditions including for Road embakments, using approved quality good earth from designated borrow area, for all heights and depths including clearing and stripping (min. 150 mm) of the area marked for filling, taking spot levels, consolidating the exposed natural soil surface, excavating the earth from borrow area loading, transporting & unloading, spreading in layers not exceeding 150 mm thickness, breaking clods, watering (if reqd.), ramming and compacting by manual/ mechanical means to give minimum 92% of modified Proctor's density of earth, testing & dressing including disposal of all unserviceable material all complete as per specifications and directions of Engineer-in-charge. |
| 211 | (Rate to include cost of all labour, tools, tackles, equipment, hire chanrges, cost of borrow earth by way of royalties, right of way, cess etc., as applicable with all bye works and sundry works). |
| 212 | PCC 1:2:4 |
| 213 | Upon supply and Complete installation of item’s and all its associated work. |
| 214 | After submission of documents and closure of contract. |
| 215 | 1 Cement : 2 Coarse sand : 4 stone aggregate 20mm nominal size. |
| 216 | PCC 1:4:8 |
| 217 | Upon supply and Complete installation of item’s and all its associated work. |
| 218 | After submission of documents and closure of contract. |
| 219 | 1 Cement : 4 Coarse sand : 8 stone aggregate 40mm nominal size. |
| 220 | (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering, earthwork in excavation and backfilling using approved earth in all conditions etc. with all bye works and sundry works.) |
| 221 | Reinforced Cement Concrete |
| 222 | Upon supply and Complete installation of item’s and all its associated work. |
| 223 | After submission of documents and closure of contract. |
| 224 | Providing and laying reinforced cement of grade M-25 with 20mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers, column, equipment foundation, Non suspended slabs/pavement slabs, ramps, cable trench inlcuding construction joints, bitumen painting on surface in contact with soil, supplying and fixing reinforcing steel, shuttering, inserts, finishes, grounting etc. at all depths and heights complete as per drawings, specifications and direction of the Engineer-in-charge. |
| 225 | Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all maerials such as minimum 43 grade cement including sulphate resistant cement for sub-structures, R/F steel, Inserts, bolts, conduits, bitumen, other minor constrcution materials, shuttering, stanging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works. |
| 226 | Concrete Pavement |
| 227 | Providing and laying reinforced cement concrete of (M-25 grade) with 20mm and down grade crushed stone aggregate in pavement, including preparation of base (i.e. compacted subgrade, 200 thk sand and 50 thk PCC M-10 grade), leaving pockets if necessary, making recess, projections, fixing inserts conduit pipes (GI, PVC, HDPE, etc.) laying in alternate panels, filling the gaps between the panels with bitumen etc., making slopes, finishing edges, leaving bars for pedestals & sleepers including providing sand fill isolation , shuttering, providing and fixing reinforcing steel, curing, chipping and modification works etc. as specified in any shape, thickness, position and finishing the top surface smooth as per requirement etc. all complete as per drawings, specifications and directions of the Engineer-in-charge. |
| 228 | Concrete Pavement- 150mm thick (Type-I) |
| 229 | Upon supply and Complete installation of item’s and all its associated work. |
| 230 | After submission of documents and closure of contract. |
| 231 | Brick Work |
| 232 | Upon supply and Complete installation of item’s and all its associated work. |
| 233 | After submission of documents and closure of contract. |
| 234 | Providing brick work with brick class designation M-7.5 of IS:1077 in cm1:4 (1 cement : 4 sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with all lead, depths & height including curring, scaffolding, etc., as per specifications and drawings with all bye-works and direction of the Enfineer-in-charge. |
| 235 | (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement, bricks, finishes, bitumen, other minor constrcution materials, shuttering, staging, masonry work, plastering, painting etc. with all bye-works and sundry works). |
| 236 | Note: The quantites of individual item can varied as per site requirement.The payment will be made as per actual certified measurement at site. |
| 237 | Laying of Brick layer/ Concrete |
| 238 | Providing single layer of Brick / Concrete / or impact resistant tape to entire width of trench above Warning Mat placed in trench over the laid pipeline as per OISD 226, standard drawing, specification and instruction of Owner. (Rate to include cost of all labour, tools, tackles, equipment, hire charges & supply of all materials, etc) |
| 239 | Brick Layer for width of PE pipeline trench as per drawing (75 mm thk.) |
| 240 | Upon supply and Complete installation of item’s and all its associated work. |
| 241 | After submission of documents and closure of contract. |
| 242 | Concrete for width of PE pipeline trench as per drawing (80 mm thk.) |
| 243 | Upon supply and Complete installation of item’s and all its associated work. |
| 244 | After submission of documents and closure of contract. |
| 245 | Demolition of PCC work below plinth level |
| 246 | Upon supply and Complete installation of item’s and all its associated work. |
| 247 | After submission of documents and closure of contract. |
| 248 | Demolishing plain cement concrete (PCC) work (taking all necessary safety precautions) for all depths below plinth level including supply of all tools & tackles, necessary scaffolding, propping, underpinning, etc. , disposal of unserviceable material outside the boundary limits keeping the owner indemnified of any liabilities from statutory/ local bodies, all complete work as specified and directed. |
| 249 | Excavation for foundation works |
| 250 | Excavation as per plan, upto 3 meters and upto any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be levelled and neatly dressed complete in all respect as per scope of work, technical specification and directions of EIC. |
| 251 | Upto 3.0 Mtrs |
| 252 | Upon supply and Complete installation of item’s and all its associated work. |
| 253 | After submission of documents and closure of contract. |
| 254 | Dismantling of RCC & cutting of reinforcement (Thickness above 3”) |
| 255 | Upon supply and Complete installation of item’s and all its associated work. |
| 256 | After submission of documents and closure of contract. |
| 257 | Structural Works |
| 258 | Supplying, fabricating & fixing steel structural cage fabricated from Angle conforming to IS:808 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm bothways to structural steel frame by means of welding/bolting, including applying two coats of approved quality of synthetic enamel paint over a priming coat of in approved shade including supply of all raw materials, bolts, electrodes, transportation, including Hilti arrangement ,locking arrangement for fixing of posts etc complete as per enclosed drawing, technical specifications, scope of works and directions of the Engineer-In-Charge. Note:- Material shall be supplied and fabricated as per site condition and Contractor have to take quantity approval from EIC/OWNER prior to commencement of work and order placement. |
| 259 | Upon supply and Complete installation of item’s and all its associated work. |
| 260 | After submission of documents and closure of contract. |
| 261 | Providing and fixing chain link Fencing |
| 262 | Upon supply and Complete installation of item’s and all its associated work. |
| 263 | After submission of documents and closure of contract. |
| 264 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50mmx50 mmx3.1mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per Specifiaction, drawing & the direction of Engineer-In-charge. The cost of structural steel and PCC shall be paid separately. |
| 265 | Upon supply and Complete installation of item’s and all its associated work. |
| 266 | After submission of documents and closure of contract. |
| 267 | Supplying, fabricating & fixing fencing gates fabricated from pipes conforming to IS:1161 and plates conforming to IS:2062 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm bothways to structural steel frame by means of welding/bolting, painting with enamel paint in approved shade including supply of all raw materials, bolts, electrodes, transportation etc complete as per enclosed sketch, technical specifications, drawings and directions of the Engineer-In-Charge.2m Wide x 2.1m High |
| 268 | Upon supply and Complete installation of item’s and all its associated work. |
| 269 | After submission of documents and closure of contract. |
| 270 | Providing and fixing of barbed wire. |
| 271 | Upon supply and Complete installation of item’s and all its associated work. |
| 272 | After submission of documents and closure of contract. |
| 273 | MRS / Metering Skid/Wall Mounted MRS. |
| 274 | Installation of MRS / Metering Skid/ DRS on foundation |
| 275 | Receiving and taking over, handling, loading, transportation and unloading of MRS / Metering Skid from Owner's designated stockyards to site, installation at foundation and hooking up with PE pipe including all works as required to complete the job as per the drawings and specification, scope of work mentioned in tender doucment. The scope includes supply of transition fittings,GI Sleeve, other MDPE and CS fittings as required and various associated works to commission MRS / Metering Skid. (Note : - The installation included CS piping work included welding,testing,NDT etc.,however payment for the CS piping work along with accessories supply will be paid in SOR item 17 to 35 respectively.) |
| 276 | Note: 1) Amount towards civil work shall be payable as per related SOR items. 2) Rate to include cost of all labour, tools, tackles, equipment, hire charges.3) All fittings and consumables including Bolts, nuts, washer, U-clamps, gaskets etc. if required during installation shall be procured and supplied by the Contractor within the rate quoted. These items shall not be separately measured and paid. |
| 277 | MRS / Metering Skid <2000 SCMD |
| 278 | Upon Complete installation of items and its associated work |
| 279 | Testing of installations. |
| 280 | Pre-Commissioning with Nitrogen at positive pressure or Commissioning with gas charging including all related activities Cease decided by EIC. |
| 281 | After submission of documents and closure of contract. |
| 282 | MRS / Metering Skid 2000-5000 SCMD |
| 283 | Upon Complete installation of items and its associated work |
| 284 | Testing of installations. |
| 285 | Pre-Commissioning with Nitrogen at positive pressure or Commissioning with gas charging including all related activities Cease decided by EIC. |
| 286 | After submission of documents and closure of contract. |
| 287 | MRS / Metering Skid 5000-20000 SCMD |
| 288 | Upon Complete installation of items and its associated work |
| 289 | Testing of installations. |
| 290 | Pre-Commissioning with Nitrogen at positive pressure or Commissioning with gas charging including all related activities Cease decided by EIC. |
| 291 | After submission of documents and closure of contract. |
| 292 | MRS / Metering Skid >20000 SCMD |
| 293 | Upon Complete installation of items and its associated work |
| 294 | Testing of installations. |
| 295 | Pre-Commissioning with Nitrogen at positive pressure or Commissioning with gas charging including all related activities Cease decided by EIC. |
| 296 | After submission of documents and closure of contract. |
| 297 | DRS upto 5000 SCMH |
| 298 | Upon Complete installation of items and its associated work |
| 299 | Testing of installations. |
| 300 | Pre-Commissioning with Nitrogen at positive pressure or Commissioning with gas charging including all related activities Cease decided by EIC. |
| 301 | After submission of documents and closure of contract. |
| 302 | Installation of Wall Mounted Metering System (Meter, Regulator & Accessory) locked in cage |
| 303 | Receiving and taking over, handling, loading, transportation and unloading of all items for Wall Mounted Metering System (Meter, Regulator & Accessory) from Owner's designated stockyards to site, installation on wall and hooking up with PE pipe including all works as required to complete the job as per the drawings and specification, scope of work mentioned in tender doucment.The scope includes supply of items required as per the drawing in scope of work (Details of drawings as PJS) viz. transition fittings, GI/Concrete Sleeves and other MDPE and CS fittings etc. as required and various associated works.(Only Meters and Regulators shall be provided as free issue) and all associated works (For CS pipe and other items refer sl. no. 17 to 35) to commission Wall Mounted Metering System. Note : Installation works included CS piping work, Testing etc.,however payment for the CS piping work along accessories will be paid in diiferent SOR item |
| 304 | Note: 1) Amount towards civil work shall be payable as per relevant SOR items. 2) Rate to include cost of all labour, tools, tackles, equipment, hire charges .3) All fittings (those are not mentioned in SOR item 17 to 35) and consumables including Bolts, nuts, washer, U-clamps, gaskets etc. if required during installation shall be procured and supplied by the Contractor within the rate quoted. These items shall not be separately measured and paid.4)The wall mounted Metering System to be kept in cage with locking facility, However payment for Structural work will be paid against respective SOR |
| 305 | The Typical Design of MRS/Metering System are as per \\"Standardized metering system Design, Selection & Installation philosophy for supply of PNG to Industrial and Commercial Customers of GAIL Gas.\\"Note: -The sizes mentioned in drawings are indicative & may vary as per actual requirment at site . |
| 306 | Wall Mounted Metering System < 500 SCMD |
| 307 | Upon Complete installation of items and its associated work |
| 308 | Testing of installations. |
| 309 | Pre-Commissioning with Nitrogen at positive pressure or Commissioning with gas charging including all related activities Cease decided by EIC. |
| 310 | After submission of documents and closure of contract. |
| 311 | Wall mounted Metering System 500 to 2000 SCMD |
| 312 | Upon Complete installation of items and its associated work |
| 313 | Testing of installations. |
| 314 | Pre-Commissioning with Nitrogen at positive pressure or Commissioning with gas charging including all related activities Cease decided by EIC. |
| 315 | After submission of documents and closure of contract. |
| 316 | Wall mounted Metering System >2000 SCMD |
| 317 | Upon Complete installation of items and its associated work |
| 318 | Testing of installations. |
| 319 | Pre-Commissioning with Nitrogen at positive pressure or Commissioning with gas charging including all related activities Cease decided by EIC. |
| 320 | After submission of documents and closure of contract. |
| 321 | Note: i) The quantities mentioned are indicative only. ii) For all the supply items mentioned above, procurement shall be made as per specification after due approval of engineer- in - charge. |
| 322 | Installation of Wall Mounted Metering System (Pre-assemble) |
| 323 | Receiving and taking over, handling, loading, transportation and unloading of all items for Wall Mounted Metering System (Pre-assembled as per standard drawing Attached in PJS Drawing ) from Owner's designated stockyards to site, installation on wall and hooking up with PE pipe including all works as required to complete the job as per the drawings and specification, scope of work mentioned in tender doucment.The scope includes supply of transition fittings, Sleeves and other MDPE and CS fittings etc. as required and various associated works, however, the Metering System assembly ( As per drawing ) shall be provided as free issue by GAIL Gas. Installtion work done by Contractor along supply of consumables including Bolts, nuts, washer, U-clamps, gaskets etc. if required during installation shall be procured and supplied by the Contractor within the rate quoted. |
| 324 | Note: 1) Amount towards civil work shall be payable as per related in respective SOR 2) Rate to include cost of all labour, tools, tackles, equipment, hire charges .3) The wall mounted Metering System to be kept in cage with locking facility, However payment for Structural work will be paid as per respective SOR. |
| 325 | Installation of GI Pipe upto 2\\" size with isolation valve for commercial meter inlet connection from TF |
| 326 | Supply and installation of upto 2\\" GI pipe |
| 327 | Upon Complete installation of items and its associated work |
| 328 | Testing of installations. |
| 329 | Pre-Commissioning with Nitrogen at positive pressure or Commissioning with gas charging including all related activities Cease decided by EIC. |
| 330 | After submission of documents and closure of contract. |
| 331 | Supply and installation of upto 2\\" Isolation valve |
| 332 | Upon Complete installation of items and its associated work |
| 333 | Testing of installations. |
| 334 | Pre-Commissioning with Nitrogen at positive pressure or Commissioning with gas charging including all related activities Cease decided by EIC. |
| 335 | After submission of documents and closure of contract. |
| 336 | Removal of MRS (all capacities) from existing consumer's premise, |
| 337 | Removal of MRS(all capacities) from existing consumer's premise for shifting to another site/store. The scope of work also includes excavation to retrive PE pipe line , disconnection of existing pipe lines (PE & Steel). |
| 338 | Removal and shifting of MRS/Metering Skid/wall mounted MRS/metering system from customer’s premises to another site/store, including store. |
| 339 | After Completion of all works and closure of contract. |
| 340 | Note:- Transportaion of removed metering skid to store shall be payble under SOR item no.15.2. However, if this skid is being shifted directly to new location for installation at new customer premises then transportation to be claimed from 14 as applicable. |
| 341 | Transportaion of removed metering skid to store |
| 342 | Removal and shifting of MRS/Metering Skid/wall mounted MRS/metering system from customer’s premises to another site/store, including store. |
| 343 | After Completion of all works and closure of contract. |
| 344 | Conversion of Commercial Appliances/industrial : |
| 345 | Conversions of all types of commercial appliances to NG based appliances. Supply & changing of the nozzles /jets and associated controls for Non-domestic appliances (imported appliances included) with proper tools and tackles. Cleaning and performing minor maintenance, greasing etc. of the appliance. Testing and showing the performance to the customer, signing of joint meter records (JMR) and instructing the customer on use & safety norms, complete as per specifications & to satisfaction of owner / Engineer in Charge and includes supply of reinforced rubber hose with requisite pressure rating.Supply of Appliance valve is also included. |
| 346 | Upon supply and Complete installation of item’s and all its associated work. |
| 347 | After submission of documents and closure of contract. |
| 348 | Installation of ASTM A106, Gr. B, Seamless, BE , NB, XS pipes of various dia |
| 349 | - Erection, welding & Installation of CS pipes(sizes 1\\" to 4\\") & fittings (all types) including all types of Valves (Ball/Check/GLOBE) for piping for connectivity to industrial/ commercial customer. 1. Scope include required welding, painting, supply of all required gaskets, studs bolts & nuts etc.2. The Scope includes Supply & fixing of approved MS angle clamps, Ceiling clamps & dowel plugs with screws, supply and insertion of insulation material i.e. PVC, PTFE sheet between pipe.3. Other Required other material like CS pipe, elbow , bends, flanges,valve,NRV etc covered under respective SOR shall be seperately payable. 4. Payment of radiography of joints (4\\" and below ) shall be paid seperately under SOR item for RADIOGRAPHY.5. Cleaning and flushing by water/ compressed air, testing of the systems including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/other methods approved by EIC/RCM/Owner6. The Scope includes Restoring the wall surface to original conditions. Clean-up and restoration of site, preparation of as built drawings, documents and project records; transportation of surplus free issue material to Owner's designated plac(s); completing all works in all respects as per the AFC drawing, specifications, standards and other provisions of Contract and instruction of Engineer-in-charge. |
| 350 | NOTE :1) SOR 17.0 executed only prior approval from EIC / OWNER.2) If Consumer is ready / agree complete the work after outlet of MRS/Metering skid outlet (after outlet valve) to commercial/industrial appliance valve connection Contractor have to take quantity (Corresponds to SOR 18.0 to 35.0) approval from EIC / OWNER prior to order placement. |
| 351 | ASTM A106, Gr. B, Seamless, PE , 1/2\\" NB, S160 , their fittings and installation of meter and regulator (as applicable) |
| 352 | On fabrication of piping. |
| 353 | On erection, alignment, welding complete to achieve mechanical completion. |
| 354 | On flushing, testing, draining, drying, etc.. |
| 355 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 356 | ASTM A106, Gr. B, Seamless, PE , 1\\" NB, XS , their fittings and installation of meter and regulator (as applicable) |
| 357 | On fabrication of piping. |
| 358 | On erection, alignment, welding complete to achieve mechanical completion. |
| 359 | On flushing, testing, draining, drying, etc.. |
| 360 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 361 | ASTM A106, Gr. B, Seamless, PE, 1.5\\" NB, XS , their fittings and installation of meter and regulator (as applicable) |
| 362 | On fabrication of piping. |
| 363 | On erection, alignment, welding complete to achieve mechanical completion. |
| 364 | On flushing, testing, draining, drying, etc.. |
| 365 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 366 | ASTM A106, Gr. B (Charpy), Seamless, BE , 2\\" NB, XS , their fittings and installation of meter and regulator (as applicable) |
| 367 | On fabrication of piping. |
| 368 | On erection, alignment, welding complete to achieve mechanical completion. |
| 369 | On flushing, testing, draining, drying, etc.. |
| 370 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 371 | ASTM A106, Gr. B (Charpy), Seamless, BE , 3\\" NB,XS , their fittings and installation of meter and regulator (as applicable) |
| 372 | On fabrication of piping. |
| 373 | On erection, alignment, welding complete to achieve mechanical completion. |
| 374 | On flushing, testing, draining, drying, etc.. |
| 375 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 376 | ASTM A106, Gr. B (Charpy), Seamless, BE , 4\\" NB,XS , their fittings and installation of meter and regulator (as applicable) |
| 377 | On fabrication of piping. |
| 378 | On erection, alignment, welding complete to achieve mechanical completion. |
| 379 | On flushing, testing, draining, drying, etc.. |
| 380 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 381 | Note:a). Supply & Installation of required size of brass fittings (which are not included in SOR item 18.0 to 33.0) in all type of meters (supplied by GAIL GAS LTD. ) shall be in scope of contractor.b). All butt welded fittings end shall generally match with connecting pipe wall thickness. However, in case of misalignment, Contractor shall have to do end preparation without any extra cost. c). Payment of radiography of joints (4\\" and below ) shall be paid seperately under SOR item for RADIOGRAPHY mentioned elsewhere in this SOR 35.0d). All type of piping works shall be carried out as per piping material specification (PMS).e). Complete Carbon Steel Piping Work with painting including all fittings, flanges and supply of all required gaskets, studs bolts & nuts etc. |
| 382 | Supply of CARBON STEEL PIPES as per Technical Specification and as directed by EIC |
| 383 | ASTM A106, Gr. B, Seamless, PE , 1/2\\" NB, S160 |
| 384 | On placement of order on sub vendor |
| 385 | On receipt of material at site and acceptance thereof. |
| 386 | On erection/installation, alignment, welding, grouting, painting, testing |
| 387 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 388 | ASTM A106, Gr. B, Seamless, PE , 1\\" NB, XS |
| 389 | On placement of order on sub vendor |
| 390 | On receipt of material at site and acceptance thereof. |
| 391 | On erection/installation, alignment, welding, grouting, painting, testing |
| 392 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 393 | ASTM A106, Gr. B, Seamless, PE, 1.5\\" NB, XS |
| 394 | On placement of order on sub vendor |
| 395 | On receipt of material at site and acceptance thereof. |
| 396 | On erection/installation, alignment, welding, grouting, painting, testing |
| 397 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 398 | ASTM A106, Gr. B (Charpy), Seamless, BE , 2\\" NB, XS |
| 399 | On placement of order on sub vendor |
| 400 | On receipt of material at site and acceptance thereof. |
| 401 | On erection/installation, alignment, welding, grouting, painting, testing |
| 402 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 403 | ASTM A106, Gr. B (Charpy), Seamless, BE , 3\\" NB,XS |
| 404 | On placement of order on sub vendor |
| 405 | On receipt of material at site and acceptance thereof. |
| 406 | On erection/installation, alignment, welding, grouting, painting, testing |
| 407 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 408 | ASTM A106, Gr. B (Charpy), Seamless, BE , 4\\" NB,XS |
| 409 | On placement of order on sub vendor |
| 410 | On receipt of material at site and acceptance thereof. |
| 411 | On erection/installation, alignment, welding, grouting, painting, testing |
| 412 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 413 | Supply of Pressure Gauges as per Technical Specification and as directed by EIC |
| 414 | RANGE 0-100 MBAR - 4\\"- DIAL SIZE |
| 415 | On placement of order on sub vendor |
| 416 | On receipt of material at site and acceptance thereof. |
| 417 | On erection/installation, alignment, welding, grouting, painting, testing |
| 418 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 419 | RANGE 0-1 BAR - 4\\"- DIAL SIZE |
| 420 | On placement of order on sub vendor |
| 421 | On receipt of material at site and acceptance thereof. |
| 422 | On erection/installation, alignment, welding, grouting, painting, testing |
| 423 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 424 | RANGE 0-4 BAR - 4\\"- DIAL SIZE |
| 425 | On placement of order on sub vendor |
| 426 | On receipt of material at site and acceptance thereof. |
| 427 | On erection/installation, alignment, welding, grouting, painting, testing |
| 428 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 429 | RANGE 0-6 BAR - 4\\"- DIAL SIZE |
| 430 | On placement of order on sub vendor |
| 431 | On receipt of material at site and acceptance thereof. |
| 432 | On erection/installation, alignment, welding, grouting, painting, testing |
| 433 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 434 | RANGE 0-30 BAR - 4\\"- DIAL SIZE |
| 435 | On placement of order on sub vendor |
| 436 | On receipt of material at site and acceptance thereof. |
| 437 | On erection/installation, alignment, welding, grouting, painting, testing |
| 438 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 439 | Supply of Strainers |
| 440 | Supply of Conical Strainer |
| 441 | As per Technical Specification and as directed by EIC.Note: - Conical Stainer may be free issue by Gail Gas Ltd., Its Discretion of Gail Gas Ltd. to excute the SOR or Free Issue the material. |
| 442 | On placement of order on sub vendor |
| 443 | On receipt of material at site and acceptance thereof. |
| 444 | On erection/installation, alignment, welding, grouting, painting, testing |
| 445 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 446 | On placement of order on sub vendor |
| 447 | On receipt of material at site and acceptance thereof. |
| 448 | On erection/installation, alignment, welding, grouting, painting, testing |
| 449 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 450 | On placement of order on sub vendor |
| 451 | On receipt of material at site and acceptance thereof. |
| 452 | On erection/installation, alignment, welding, grouting, painting, testing |
| 453 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 454 | On placement of order on sub vendor |
| 455 | On receipt of material at site and acceptance thereof. |
| 456 | On erection/installation, alignment, welding, grouting, painting, testing |
| 457 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 458 | Supply of Y Type Strainer |
| 459 | On placement of order on sub vendor |
| 460 | On receipt of material at site and acceptance thereof. |
| 461 | On erection/installation, alignment, welding, grouting, painting, testing |
| 462 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 463 | Supply of Check valve/NRVAs per Technical Specification and as directed by EIC. |
| 464 | 1 1/2\\", 150# FE,FB |
| 465 | On placement of order on sub vendor |
| 466 | On receipt of material at site and acceptance thereof. |
| 467 | On erection/installation, alignment, welding, grouting, painting, testing |
| 468 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 469 | 2\\", 150# FE,FB |
| 470 | On placement of order on sub vendor |
| 471 | On receipt of material at site and acceptance thereof. |
| 472 | On erection/installation, alignment, welding, grouting, painting, testing |
| 473 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 474 | 3\\", 150# FE,FB |
| 475 | On placement of order on sub vendor |
| 476 | On receipt of material at site and acceptance thereof. |
| 477 | On erection/installation, alignment, welding, grouting, painting, testing |
| 478 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 479 | 4\\", 150# FE,FB |
| 480 | On placement of order on sub vendor |
| 481 | On receipt of material at site and acceptance thereof. |
| 482 | On erection/installation, alignment, welding, grouting, painting, testing |
| 483 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 484 | Supply of FLANGES Weld Neck(End Thickness to match pipe thickness) |
| 485 | 1\\" , 150#, B-16.5 , A105 ,125 AARH,SW,RF |
| 486 | On placement of order on sub vendor |
| 487 | On receipt of material at site and acceptance thereof. |
| 488 | On erection/installation, alignment, welding, grouting, painting, testing |
| 489 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 490 | 1.5\\" , 150#, B-16.5 , A105 ,125 AARH,SW,RF |
| 491 | On placement of order on sub vendor |
| 492 | On receipt of material at site and acceptance thereof. |
| 493 | On erection/installation, alignment, welding, grouting, painting, testing |
| 494 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 495 | 2\\",150#, B-16.5, A105 (Charpy), 125 AARH, RF |
| 496 | On placement of order on sub vendor |
| 497 | On receipt of material at site and acceptance thereof. |
| 498 | On erection/installation, alignment, welding, grouting, painting, testing |
| 499 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 500 | 3\\",150#, B-16.5, A105 (Charpy), 125 AARH, RF |
| 501 | On placement of order on sub vendor |
| 502 | On receipt of material at site and acceptance thereof. |
| 503 | On erection/installation, alignment, welding, grouting, painting, testing |
| 504 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 505 | 4\\",150#, B-16.5, A105 (Charpy), 125 AARH, RF |
| 506 | On placement of order on sub vendor |
| 507 | On receipt of material at site and acceptance thereof. |
| 508 | On erection/installation, alignment, welding, grouting, painting, testing |
| 509 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 510 | Supply of Blind FlangesAs per Technical Specification and as directed by EIC. |
| 511 | 1 1/2\\",150#, B-16.5, A105 (Charpy), 125 AARH, RF |
| 512 | On placement of order on sub vendor |
| 513 | On receipt of material at site and acceptance thereof. |
| 514 | On erection/installation, alignment, welding, grouting, painting, testing |
| 515 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 516 | 2\\",150#, B-16.5, A105 (Charpy), 125 AARH, RF |
| 517 | On placement of order on sub vendor |
| 518 | On receipt of material at site and acceptance thereof. |
| 519 | On erection/installation, alignment, welding, grouting, painting, testing |
| 520 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 521 | 3\\",150#, B-16.5, A105 (Charpy), 125 AARH, RF |
| 522 | On placement of order on sub vendor |
| 523 | On receipt of material at site and acceptance thereof. |
| 524 | On erection/installation, alignment, welding, grouting, painting, testing |
| 525 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 526 | 4\\",150#, B-16.5, A105 (Charpy), 125 AARH, RF |
| 527 | On placement of order on sub vendor |
| 528 | On receipt of material at site and acceptance thereof. |
| 529 | On erection/installation, alignment, welding, grouting, painting, testing |
| 530 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 531 | End Caps |
| 532 | 2\\", XS, A 234 Gr. WPB (Charpy), BW |
| 533 | On placement of order on sub vendor |
| 534 | On receipt of material at site and acceptance thereof. |
| 535 | On erection/installation, alignment, welding, grouting, painting, testing |
| 536 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 537 | 3\\", XS, A 234 Gr. WPB (Charpy), BW |
| 538 | On placement of order on sub vendor |
| 539 | On receipt of material at site and acceptance thereof. |
| 540 | On erection/installation, alignment, welding, grouting, painting, testing |
| 541 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 542 | 4\\", XS, A 234 Gr. WPB (Charpy), BW |
| 543 | On placement of order on sub vendor |
| 544 | On receipt of material at site and acceptance thereof. |
| 545 | On erection/installation, alignment, welding, grouting, painting, testing |
| 546 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 547 | Supply of FLANGE END GLOBE VALVES, 150#As per Technical Specification and as directed by EIC. |
| 548 | On placement of order on sub vendor |
| 549 | On receipt of material at site and acceptance thereof. |
| 550 | On erection/installation, alignment, welding, grouting, painting, testing |
| 551 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 552 | On placement of order on sub vendor |
| 553 | On receipt of material at site and acceptance thereof. |
| 554 | On erection/installation, alignment, welding, grouting, painting, testing |
| 555 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 556 | On placement of order on sub vendor |
| 557 | On receipt of material at site and acceptance thereof. |
| 558 | On erection/installation, alignment, welding, grouting, painting, testing |
| 559 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 560 | On placement of order on sub vendor |
| 561 | On receipt of material at site and acceptance thereof. |
| 562 | On erection/installation, alignment, welding, grouting, painting, testing |
| 563 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 564 | On placement of order on sub vendor |
| 565 | On receipt of material at site and acceptance thereof. |
| 566 | On erection/installation, alignment, welding, grouting, painting, testing |
| 567 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 568 | Supply of Ball ValvesAs per Technical Specification and as directed by EIC. |
| 569 | 1/2\\",800#, Sockolet Welded/Threaded Valve ASTM A-105, B 16.11 |
| 570 | On placement of order on sub vendor |
| 571 | On receipt of material at site and acceptance thereof. |
| 572 | On erection/installation, alignment, welding, grouting, painting, testing |
| 573 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 574 | 1\\",800#, Sockolet Welded/Threaded Valve ASTM A-105, B 16.11 |
| 575 | On placement of order on sub vendor |
| 576 | On receipt of material at site and acceptance thereof. |
| 577 | On erection/installation, alignment, welding, grouting, painting, testing |
| 578 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 579 | 1.5\\" 800#, Sockolet Welded/Threaded Valve ASTM A-105, B 16.11 |
| 580 | On placement of order on sub vendor |
| 581 | On receipt of material at site and acceptance thereof. |
| 582 | On erection/installation, alignment, welding, grouting, painting, testing |
| 583 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 584 | 2\\",150#,FE, FB, |
| 585 | On placement of order on sub vendor |
| 586 | On receipt of material at site and acceptance thereof. |
| 587 | On erection/installation, alignment, welding, grouting, painting, testing |
| 588 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 589 | 3\\",150#,FE, FB, |
| 590 | On placement of order on sub vendor |
| 591 | On receipt of material at site and acceptance thereof. |
| 592 | On erection/installation, alignment, welding, grouting, painting, testing |
| 593 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 594 | 4\\",150#,FE, FB, |
| 595 | On placement of order on sub vendor |
| 596 | On receipt of material at site and acceptance thereof. |
| 597 | On erection/installation, alignment, welding, grouting, painting, testing |
| 598 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 599 | Supply of Isolation Ball Valve And Appliance Valve as per Technical Specification and as directed by EIC |
| 600 | Isolation Ball Valve ½\\" max. 6 bar (g) |
| 601 | On placement of order on sub vendor |
| 602 | On receipt of material at site and acceptance thereof. |
| 603 | On erection/installation, alignment, welding, grouting, painting, testing |
| 604 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 605 | Isolation Ball Valve 1\\" max. 6 bar (g) |
| 606 | On placement of order on sub vendor |
| 607 | On receipt of material at site and acceptance thereof. |
| 608 | On erection/installation, alignment, welding, grouting, painting, testing |
| 609 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 610 | Isolation Ball Valve 1.5\\" max. 6 bar (g) |
| 611 | On placement of order on sub vendor |
| 612 | On receipt of material at site and acceptance thereof. |
| 613 | On erection/installation, alignment, welding, grouting, painting, testing |
| 614 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 615 | Isolation Ball Valve 2\\" max. 6 bar (g) |
| 616 | On placement of order on sub vendor |
| 617 | On receipt of material at site and acceptance thereof. |
| 618 | On erection/installation, alignment, welding, grouting, painting, testing |
| 619 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 620 | Isolation Ball Valve 3\\" max. 6 bar (g) |
| 621 | On placement of order on sub vendor |
| 622 | On receipt of material at site and acceptance thereof. |
| 623 | On erection/installation, alignment, welding, grouting, painting, testing |
| 624 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 625 | Supply SOCKOLET (A105, SW) As per Technical Specification and as directed by EIC. |
| 626 | 2\\" x ½\\" |
| 627 | On placement of order on sub vendor |
| 628 | On receipt of material at site and acceptance thereof. |
| 629 | On erection/installation, alignment, welding, grouting, painting, testing |
| 630 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 631 | 2\\" x 1\\" |
| 632 | On placement of order on sub vendor |
| 633 | On receipt of material at site and acceptance thereof. |
| 634 | On erection/installation, alignment, welding, grouting, painting, testing |
| 635 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 636 | 3\\" x ½\\" |
| 637 | On placement of order on sub vendor |
| 638 | On receipt of material at site and acceptance thereof. |
| 639 | On erection/installation, alignment, welding, grouting, painting, testing |
| 640 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 641 | 3\\" x 1\\" |
| 642 | On placement of order on sub vendor |
| 643 | On receipt of material at site and acceptance thereof. |
| 644 | On erection/installation, alignment, welding, grouting, painting, testing |
| 645 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 646 | 4\\" x ½\\" |
| 647 | On placement of order on sub vendor |
| 648 | On receipt of material at site and acceptance thereof. |
| 649 | On erection/installation, alignment, welding, grouting, painting, testing |
| 650 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 651 | 4\\" x 1\\" |
| 652 | On placement of order on sub vendor |
| 653 | On receipt of material at site and acceptance thereof. |
| 654 | On erection/installation, alignment, welding, grouting, painting, testing |
| 655 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 656 | SUPPLY OF REDUCER (A 234 Gr. WPB (Charpy), BW) |
| 657 | 1.5\\" x 1\\", XS x XS, A105, SW,3000#, B-16.11 |
| 658 | On placement of order on sub vendor |
| 659 | On receipt of material at site and acceptance thereof. |
| 660 | On erection/installation, alignment, welding, grouting, painting, testing |
| 661 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 662 | 2\\"x1\\", XS x XS, A 234 Gr. WPB (Charpy), BW, B-16.9 |
| 663 | On placement of order on sub vendor |
| 664 | On receipt of material at site and acceptance thereof. |
| 665 | On erection/installation, alignment, welding, grouting, painting, testing |
| 666 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 667 | 2\\" X 1.5\\", XS , A 234 Gr. WPB (Charpy), BW, B-16.9 |
| 668 | On placement of order on sub vendor |
| 669 | On receipt of material at site and acceptance thereof. |
| 670 | On erection/installation, alignment, welding, grouting, painting, testing |
| 671 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 672 | 3\\"x1\\", XS x XS, A 234 Gr. WPB (Charpy), BW, B-16.9 |
| 673 | On placement of order on sub vendor |
| 674 | On receipt of material at site and acceptance thereof. |
| 675 | On erection/installation, alignment, welding, grouting, painting, testing |
| 676 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 677 | 3\\" X 1.5\\", XS , A 234 Gr. WPB (Charpy), BW, B-16.9 |
| 678 | On placement of order on sub vendor |
| 679 | On receipt of material at site and acceptance thereof. |
| 680 | On erection/installation, alignment, welding, grouting, painting, testing |
| 681 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 682 | 3\\" x 2\\" , STD x XS, A 234 Gr. WPB (Charpy), BW, B-16.9 |
| 683 | On placement of order on sub vendor |
| 684 | On receipt of material at site and acceptance thereof. |
| 685 | On erection/installation, alignment, welding, grouting, painting, testing |
| 686 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 687 | 4\\" x 2\\" , STD x XS, A 234 Gr. WPB (Charpy), BW, B-16.9 |
| 688 | On placement of order on sub vendor |
| 689 | On receipt of material at site and acceptance thereof. |
| 690 | On erection/installation, alignment, welding, grouting, painting, testing |
| 691 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 692 | 4\\" x 3\\" , STD x XS, A 234 Gr. WPB (Charpy), BW, B-16.9 |
| 693 | On placement of order on sub vendor |
| 694 | On receipt of material at site and acceptance thereof. |
| 695 | On erection/installation, alignment, welding, grouting, painting, testing |
| 696 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 697 | TEE, Equal / Unequal Tee |
| 698 | 1\\", XS, SW, 3000#, B-16.11 |
| 699 | On placement of order on sub vendor |
| 700 | On receipt of material at site and acceptance thereof. |
| 701 | On erection/installation, alignment, welding, grouting, painting, testing |
| 702 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 703 | 1.5\\", XS, A105, SW, 3000#, B-16.11 |
| 704 | On placement of order on sub vendor |
| 705 | On receipt of material at site and acceptance thereof. |
| 706 | On erection/installation, alignment, welding, grouting, painting, testing |
| 707 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 708 | 2\\" x 1.5\\", XS , A234, Gr. WPB (Charpy), B-16.9, BW |
| 709 | On placement of order on sub vendor |
| 710 | On receipt of material at site and acceptance thereof. |
| 711 | On erection/installation, alignment, welding, grouting, painting, testing |
| 712 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 713 | 2\\", XS , A234, Gr. WPB (Charpy), B-16.9, BW |
| 714 | On placement of order on sub vendor |
| 715 | On receipt of material at site and acceptance thereof. |
| 716 | On erection/installation, alignment, welding, grouting, painting, testing |
| 717 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 718 | 3\\", STD , A234, Gr. WPB (Charpy), B-16.9, BW |
| 719 | On placement of order on sub vendor |
| 720 | On receipt of material at site and acceptance thereof. |
| 721 | On erection/installation, alignment, welding, grouting, painting, testing |
| 722 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 723 | 4\\" STD x XS, A234, Gr. WPB (Charpy), B-16.9, BW |
| 724 | On placement of order on sub vendor |
| 725 | On receipt of material at site and acceptance thereof. |
| 726 | On erection/installation, alignment, welding, grouting, painting, testing |
| 727 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 728 | ELBOW, 90° Elbow |
| 729 | ½\\", XS, SW, 3000#, ASTM A105,B-16.11 |
| 730 | On placement of order on sub vendor |
| 731 | On receipt of material at site and acceptance thereof. |
| 732 | On erection/installation, alignment, welding, grouting, painting, testing |
| 733 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 734 | 1\\", XS, SW, 3000#, ASTM A105,B-16.11 |
| 735 | On placement of order on sub vendor |
| 736 | On receipt of material at site and acceptance thereof. |
| 737 | On erection/installation, alignment, welding, grouting, painting, testing |
| 738 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 739 | 1.5\\", XS, SW, 3000#, ASTM A105,B-16.11 |
| 740 | On placement of order on sub vendor |
| 741 | On receipt of material at site and acceptance thereof. |
| 742 | On erection/installation, alignment, welding, grouting, painting, testing |
| 743 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 744 | 2\\", XS, BW, A234, Gr. WPB (Charpy), B-16.9, 1.5D |
| 745 | On placement of order on sub vendor |
| 746 | On receipt of material at site and acceptance thereof. |
| 747 | On erection/installation, alignment, welding, grouting, painting, testing |
| 748 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 749 | 3\\", STD, BW, A234, Gr. WPB (Charpy), B-16.9, 1.5D |
| 750 | On placement of order on sub vendor |
| 751 | On receipt of material at site and acceptance thereof. |
| 752 | On erection/installation, alignment, welding, grouting, painting, testing |
| 753 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 754 | 4\\", XS, BW, A234, Gr. WPB (Charpy), B-16.9, 1.5D |
| 755 | On placement of order on sub vendor |
| 756 | On receipt of material at site and acceptance thereof. |
| 757 | On erection/installation, alignment, welding, grouting, painting, testing |
| 758 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 759 | Spectacle Blind AS PER SPECIFICATION |
| 760 | Spectacle Blind 1 1/2\\" |
| 761 | On placement of order on sub vendor |
| 762 | On receipt of material at site and acceptance thereof. |
| 763 | On erection/installation, alignment, welding, grouting, painting, testing |
| 764 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 765 | Spectacle Blind 2\\" |
| 766 | On placement of order on sub vendor |
| 767 | On receipt of material at site and acceptance thereof. |
| 768 | On erection/installation, alignment, welding, grouting, painting, testing |
| 769 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 770 | Spectacle Blind 3\\" |
| 771 | On placement of order on sub vendor |
| 772 | On receipt of material at site and acceptance thereof. |
| 773 | On erection/installation, alignment, welding, grouting, painting, testing |
| 774 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 775 | Spectacle Blind 4\\" |
| 776 | On placement of order on sub vendor |
| 777 | On receipt of material at site and acceptance thereof. |
| 778 | On erection/installation, alignment, welding, grouting, painting, testing |
| 779 | On completion of all activities and their acceptance, submission of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order. |
| 780 | Internal/external piping support (AS PER Tender) |
| 781 | Structrual work for providing support and other related work |
| 782 | Completion of individual work as per SOR including supply (wherever applicable) |
| 783 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 784 | WELDING OF JOINTS - Butt Weld Joints |
| 785 | 1/2\\" (WELDING OF JOINTS) |
| 786 | Completion of individual work as per SOR including supply (wherever applicable) |
| 787 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 788 | 1\\" (WELDING OF JOINTS) |
| 789 | Completion of individual work as per SOR including supply (wherever applicable) |
| 790 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 791 | 1.5\\" (WELDING OF JOINTS) |
| 792 | Completion of individual work as per SOR including supply (wherever applicable) |
| 793 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 794 | 2\\" (WELDING OF JOINTS) |
| 795 | Completion of individual work as per SOR including supply (wherever applicable) |
| 796 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 797 | 3\\" (WELDING OF JOINTS) |
| 798 | Completion of individual work as per SOR including supply (wherever applicable) |
| 799 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 800 | 4\\" (WELDING OF JOINTS) |
| 801 | Completion of individual work as per SOR including supply (wherever applicable) |
| 802 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 803 | Note: i) All butt welded fittings end shall generally match with connecting pipe wall thickness however in case of misalignment Contractor shall have to do end preparation without any extra cost.ii) All coupling, nipples etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under erection rate. |
| 804 | RADIOGRAPHY OF JOINTS |
| 805 | Performance of radiographic inspection by gamma radiation as per scope of work and as per specifications in piping of all types and thickness including providing/hiring of all necessary equipments, supply of all consumables, and whatever else even though not expressely mentioned but required to perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-radiography of the repaired joint and additional radiography necessitated due to poor performance of contractor's welder shall be carried out by the Contractor at his own cost and shall not be paid extra by Company). Radiographs shall be submitted to the Engineer-in-Charge for acceptance, whose decision shall be final and binding. |
| 806 | Note- i). 4\\" & Below and all butt weld joint are radiography / X-ray shall be done at every joint and shall be carried out as per API 1104 (latest edition) / M/s GAIL Gas Ltd. specification / OISD / PNGRB and same shall be approved by Engineer–in–charge (EIC)/RCM.ii). All socket weld joint MPT/UT/DPT shall be done at every joint nd shall be carried out as per API 1104 (latest edition)/M/s GAIL Gas Ltd. specification / OISD / PNGRB and same shall be approved by Engineer–in–charge (EIC)/ RCM. |
| 807 | 1/2\\" (RADIOGRAPHY of Joints as Above) |
| 808 | Completion of individual work as per SOR including supply (wherever applicable) |
| 809 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 810 | 1\\" (RADIOGRAPHY of Joints as Above) |
| 811 | Completion of individual work as per SOR including supply (wherever applicable) |
| 812 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 813 | 1.5\\" (RADIOGRAPHY of Joints as Above) |
| 814 | Completion of individual work as per SOR including supply (wherever applicable) |
| 815 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 816 | 2\\" (RADIOGRAPHY of Joints as Above) |
| 817 | Completion of individual work as per SOR including supply (wherever applicable) |
| 818 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 819 | 3\\" (RADIOGRAPHY of Joints as Above) |
| 820 | Completion of individual work as per SOR including supply (wherever applicable) |
| 821 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 822 | 4\\" (RADIOGRAPHY of Joints as Above) |
| 823 | Completion of individual work as per SOR including supply (wherever applicable) |
| 824 | Completion of all activities and their acceptance submission of final documents, final bill and acceptance of these by |
| 825 | Supply, installation, comissioning of earthpits |
| 826 | Supply, installation, comissioning of earthpits as per scope of work & enclosed drawing and specififcations including supply and installation of of GI Pipe earth electrode, salt, charcoal, sand and brick masonary work,excavation and backfilling in all type of soils and MS cover at the top. (If RCC or PCC is to be broken, payment for the same shall be done separately under respective SOR, payment of cable and strip shall be seperate). |
| 827 | After Completion of works in all respect. |
| 828 | After submission of documents and closure of contract. |
| 829 | Supply, Installation & Commissioning of Earth Pits as per scope of work & enclosed drawing (Drawings No.- MEC/SD/05/E9/02/02 ) and specifications including supply and installation of copper plate, GI Pipe, salt, charcoal, sand and brick masonry work, excavation and backfilling in all type of soils and MS cover at the top. (Earthing Cable/ strip extra). |
| 830 | After Completion of works in all respect. |
| 831 | After submission of documents and closure of contract. |
| 832 | Supply, Installation & Commissioning of Maintenance free Earth Pits as per scope of work & enclosed drawing. Chemical Earthpits at Bengaluru GA which includes supply and installation of copper bonded solid steel rods made by high quality molecular bonding 99.9 % pure electrolytic copper on a low carbon, high tensile steel core with the bonding range of 250 micron, supply of earth enhancement materials, supply of copper bus bar, supply and construction of earthing Pit Chamber including supply of Pit cover, requisite SS nuts & bolts, soil excavation, drilling & boring, Labour,Freight, Transponation, tools & tackles, all consumable etc, any other materials require to complete the subject work shall be in the scope of vendor, installtion and commissioning work as per scope of work and specification of tender document to the satifaction of EIC. |
| 833 | After Completion of works in all respect. |
| 834 | After submission of documents and closure of contract. |
| 835 | Supply & Laying/ Erection of 25 mm X 3 mm G.I strip upto 0.50 metre below ground as strip including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm) including all associated civil work/ restoration and labour for Grid Fabrication of Existing Earth Pits as per IS 3043. |
| 836 | After Completion of works in all respect. |
| 837 | After submission of documents and closure of contract. |
| 838 | Supply & Laying/ Erection of 50 mm X 6 mm G.I strip upto 0.50 metre below ground as strip including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm) including all associated civil work/ restoration and labour for Grid Fabrication of Existing Earth Pits as per IS 3043. |
| 839 | After Completion of works in all respect. |
| 840 | After submission of documents and closure of contract. |
| 841 | Note: i) Quantities mentioned against each above item of SOR Items are tentative and may increase or decrease during execution of work depending upon site requirement. Contractor required to supply materials after assessing the site requirement and in multiple lot or as per Release Order/ Sub Purchase Order wise. All material either in multiple lot or as per Release Order/ Sub Purchase Order wise or as decided by EIC shall be supplied by bidder within the quoted price.(ii) The quantites of individual item can varied as per site requirement.The payment will be made as per actual certified measurement at site. For the supply items the quantities shall be procured after approval from client/ consultant/EIC.(iii) The bidder must indicate currency(ies) against each quoted item of the SOR.(iv) The total amount shall also be given by the bidder in the quoted currency(ies).(v) Some of the may / may not be execute as per site requirements. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
| 8 | Click here to download tender document | Tender Documents |
| 9 | Click here to download tender document | Tender Documents |
| 10 | Click here to download tender document | Tender Documents |
| 11 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail