| 1 | Supply & laying of following sizes of DI K-9/K-7, HDPE pipes including Lowering into trenches, laying true to alignment and gradient in excavated trenches, making S/S joints ; Supply of required material and making of suitable bedding as and where required : Fixing of M.S. Gap pieces as and where required for completion of work also including testing and commissioning of the Pipe line.railway freight and cartage upto store, complete. |
| 2 | DI K7 100MM |
| 3 | Supply of C.I.Sluice/Scour valves /Double Kinetic air valve as per Relevent I.S. Code suitable for a working pressure of 10 Kg/sqcm. Including Carting from store to site of work, lowering, fixing and jointing of following fittings in trenches. |
| 4 | Air valve (Double Kinetic Air Valve PN 16 as per IS 14845) |
| 5 | 50 mm dia. |
| 6 | C.I. D/F Sluice/Scour valve PN 16 as per IS 14846 |
| 7 | 100 mm |
| 8 | Excavation for pipe line trenches requiring use of special T&P ie. pick axe, sabbals etc. lift upto 1.5 m lead upto 50 m. Filling watering ramming of excavated earth into trenches or into the space between the pipes & the side of trenches and disposal of surplus earth upto a distance of 50 meter from the centre of the foundation trenches. |
| 9 | Excavation in Earth, Moorum, shingle |
| 10 | 0.0 to 1.5 M. depth |
| 11 | Excavation in soft/ medium/ hard rock |
| 12 | 0.0 to 1.5 M. depth |
| 13 | Supply of all materials and construction of following chambers as per type design. |
| 14 | Air Valve Chmaber (Masonry Type) (1175mmX1000mmX1700mm) |
| 15 | Sluice Valve Chamber (Masonry type) (1325mX1175mmX2625mm) |
| 16 | Design and construct Thrust Block made in R.C.C. with cement coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3 for pipe line including supply of MS reinforcement wrought to required shape as necessary its bending fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials labour T & P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge. |
| 17 | Making Inter connection of new shifted pipeline with existing pipeline, cutting of DI/HDPE/GI pipeline, bailing out of water manually/by Diesel pumps, including supply of all material, labour, T&P, speicals like tee, bend etc. all complete with testing and commissioning of pipeline. |
| 18 | Nala/culvert/Road crossings: Provision for following type of nala/culvert/Road crossing with excavation,PCC M-15,and RCC M20 including reinforcement and shuttering as per departmental type design and drawings etc complete as per instructions of engineer incharge etc complete |
| 19 | 100mm dia DI pipe |
| 20 | Dismantling and reinstatement of following type of road surfaces for laying of pipe line including sorting out of serviceable materials and disposal of unserviceable materials. |
| 21 | Bitumen Road |
| 22 | CC Road Please Enable Macros to View BoQ information |