| 1 | Site Clerance including labour and matrialsand including grass cutting /Dressing andcarrage of matrials by Head load |
| 2 | E/W filling in embankment with cartage soilup to 8.00 km distances etc com. |
| 3 | Dismenteling of Brick Work includingStacking of materials as directed by theEngineer-in-Charge with the distance of60.00m. Work SI No. 692 |
| 4 | E/W in Excavation in ordenery soil infoudation including labour and matrialsand T/P with all com. Work SI No. 251 |
| 5 | C.C. Work in 1:6:12 in cement, fine sandand 40 mm Gauge Brick Ballast includinglabour and matrials , T/P with all com.Work SI No. 273 |
| 6 | M-150 B/W in 1:4 in cement and coar sandmortar including labour and matrials , T/Pwith all com. Work SI No.305DEDUCTED TO OLD BRICKS & BATS RS. 8507.00 |
| 7 | 12mm thick Plaster work in 1:3 in cementand fine sand mortar including labour andmatrials, T/P with all com. Work SI No.583 |
| 8 | R.C.C. Work in 1:1.5:3 in cement coarsesand and 20mm gauge including labourand matrials, T/P with all com. Work SINo.285 |
| 9 | MS work in R.C.C. work includinglabour and matrials , T/P with all com.Work SI. No.504 |
| 10 | Construction of Granular sub base (GSB) byproviding coarse graded material spreadingin uniform layers with motor grader onprepared surface, mixing by mix in placemethod with rotavator at OMC, andcompacting with vibratory roller to achievethe desired density, complete as per Clause401 .. |
| 11 | P/L of 80 mm thick rubber moulded interlocking cement concrete paver blocks, Work SI NO. 786(I) |
| 12 | P /F Colour interlocking tiles with all comp. |
| 13 | P.C.C. Work in 1:2:4 in cement, Coarsesand and 20 mm GaugeStone gritincluding labour and matrials , T/P withall com. Work SI No. 279(B) |
| 14 | Shifting of all material ,add to item 251-253for every additional 30m .lead or part of30m.or for every additional 1.50m lift orpart of 1.50m .Work SI No-254.150 m distance |
| 15 | S/F of 0.60X45X0.08 mm stone patiyaincluded all comp work. |
| 16 | S/F of Granite Sign Board including labourand matrials T/P with all com. Work. |
| 17 | Add 18% GST Please Enable Macros to View BoQ information |