| 1 | Annual maintenance for chlorinators at Nashik (Satpur) WTP. ( As per Schedule \\"B\\" |
| 2 | Visit Charges to attend Servicing/ Repairing of Chlorinators which includes monthly visit to maintain/ necessary repairs to chlorinators to keep chlorinator in operative condition without any trouble round the clock & to replace parts of chlorinator if necessary and as and when required etc. complete. |
| 3 | Supply, Installation and testing of Vacuum Regulator including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 4 | Supply, Installation and testing of inlet valve assembly for regulator including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 5 | Supply, Installation and testing of gas flow meter Cap.20 Kg/hr including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 6 | Supply, Installation and testing of 100 mm Dial vacuum gauge with PVC isolator including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 7 | Supply, Installation and testing of 100 mm Dial Water presure gauge including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 8 | Supply, Installation and testing Non return valve for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 9 | Supply, Installation and testing Control valve assembly including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 10 | Supply, Installation and testing of control valve set including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 11 | Supply, Installation and testing of 3/8\\" OD X 16 SWG Copper coil with end fittings including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 12 | Supply, Installation and testing of Injector nozzle including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 13 | Supply, Installation and testing of Injector diaphragm set including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 14 | Supply, Installation and testing of 50 MM PP Ball valve for solution line including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 15 | Supply, Installation and testing of rigid PVC NRV for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 16 | Supply, Installation and testing of Header isolation valve. (IS3224) including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 17 | Supply, Installation and testing of yoke clamp. (Tonner clamp) including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 18 | Supply, Installation and testing of \\"O\\" Ring set for complate chlorinator including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 19 | Supply of Lead washers including material etc. complete as per the direction of Engineer-in-charge. |
| 20 | Annual maintenance for chlorine leak absorption system at Nashik (Satpur) WTP. |
| 21 | AMC for Chlorine leak absorption system for a period of two years. During the monthly visit complete check-up shall be carried out of all the items and trail run shall be taken on auto as well as manual operation mode. |
| 22 | Providing and replacement of All the nut / bolts / washers and Gaskets of all flange joints including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 23 | Providing and maintaining of Concentration of Caustic solution after checking once in a year, and the necessary arrangement shall be done to maintain the concentration level at 20% including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 24 | Maintaining of The PP circulation pump, motor for PP pump and motor for blower and are covered 100% and shall be replaced if the same are found not be performing up to the mark including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 25 | Providing and replacement of All valves including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 26 | Maintaining of Caustic solution tank, absorption tower, blower Impeller for minor leakages including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 27 | Annual maintenance for chlorinators at Sinner WTP. |
| 28 | Visit Charges to attend Servicing/ Repairing of Chlorinators which includes monthly visit to maintain/ necessary repairs to chlorinators to keep chlorinator in operative condition without any trouble round the clock & to replace parts of chlorinator if necessary and as and when required etc. complete. |
| 29 | Supply, Installation and testing of Vacuum Regulator including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 30 | Supply, Installation and testing of inlet valve assembly for regulator including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 31 | Supply, Installation and testing of gas flow meter Cap.20 Kg/hr including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 32 | Supply, Installation and testing of 100 mm Dial vacuum gauge with PVC isolator including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 33 | Supply, Installation and testing of 100 mm Dial Water presure gauge including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 34 | Supply, Installation and testing Non return valve for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 35 | Supply, Installation and testing Control valve assembly including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 36 | Supply, Installation and testing of control valve set including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 37 | Supply, Installation and testing of 3/8\\" OD X 16 SWG Copper coil with end fittings including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 38 | Supply, Installation and testing of Injector nozzle including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 39 | Supply, Installation and testing of Injector diaphragm set including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 40 | Supply, Installation and testing of 50 MM PP Ball valve for solution line including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 41 | Supply, Installation and testing of rigid PVC NRV for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 42 | Supply, Installation and testing of Header isolation valve. (IS3224) including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 43 | Supply, Installation and testing of yoke clamp. (Tonner clamp) including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 44 | Supply, Installation and testing of \\"O\\" Ring set for complate chlorinator including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 45 | Supply of Lead washers including material etc. complete as per the direction of Engineer-in-charge. |
| 46 | Service/ Repairs to booster pump set including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 47 | Annual maintenance for chlorine leak absorption system at Sinner WTP. |
| 48 | AMC for Chlorine leak absorption system for a period of one year. During the monthly visit complete check-up shall be carried out of all the items and trail run shall be taken on auto as well as manual operation mode. Annual maintenance for chlorine leak absorption system at Sinner WTP. For Two years period from 01/04/2024 to 31/03/2026. Monthly visit for Sinner WTP for period of two years |
| 49 | Providing and replacement of All the nut / bolts / washers and Gaskets of all flange joints including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 50 | Providing and maintaining of Concentration of Caustic solution after checking once in a year, and the necessary arrangement shall be done to maintain the concentration level at 20%. |
| 51 | Maintaining of The PP circulation pump, motor for PP pump and motor for blower and are covered 100% and shall be replaced if the same are found not be performing up to the mark. |
| 52 | Providing and replacement of All valves including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 53 | Maintaining of Caustic solution tank, absorption tower, blower Impeller for minor leakages including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 54 | Annual maintenance for chlorinators at Sayane WTP. |
| 55 | Visit Charges to attend Servicing/ Repairing of Chlorinators which includes monthly visit to maintain/ necessary repairs to chlorinators to keep chlorinator in operative condition without any trouble round the clock & to replace parts of chlorinator if necessary and as and when required etc. complete. |
| 56 | Supply, Installation and testing of inlet valve assembly for regulator including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 57 | Supply, Installation and testing of gas flow meter Cap.5 Kg/hr including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 58 | Supply, Installation and testing Non return valve for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 59 | Supply, Installation and testing Control valve assembly including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 60 | Supply, Installation and testing of \\"O\\" Ring set for complate chlorinator including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 61 | Supply, Installation and testing of 65 mm Dial water pressure gauge including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 62 | Supply, Installation and testing of 3/8\\" OD X 16 SWG Copper coil with end fittings including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 63 | Supply, Installation and testing of Injector nozzle including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 64 | Supply, Installation and testing of rigid PVC NRV for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 65 | Supply, Installation and testing of Header isolation valve. (IS3224) including labour, material etc. complete as per the direction of Engineer-in-charge.... |
| 66 | Supply, Installation and testing of yoke clamp. (Tonner clamp) including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 67 | Supply of Lead washers including material etc. complete as per the direction of Engineer-in-charge. |
| 68 | Service/ Repairs to booster pump set including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 69 | Annual maintenance for chlorinator at Addl. Dindori WTP. |
| 70 | Visit Charges to attend Servicing/ Repairing of Chlorinators which includes monthly visit to maintain/ necessary repairs to chlorinators to keep chlorinator in operative condition without any trouble round the clock & to replace parts of chlorinator if necessary and as and when required etc. complete. |
| 71 | Supply, Installation and testing of inlet valve assembly for regulator including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 72 | Supply, Installation and testing of gas flow meter Cap.5 Kg/hr including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 73 | Supply, Installation and testing Non return valve for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 74 | Supply, Installation and testing Control valve assembly including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 75 | Supply, Installation and testing of \\"O\\" Ring set for complate chlorinator including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 76 | Supply, Installation and testing of 65 mm Dial water pressure gauge including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 77 | Supply, Installation and testing of 3/8\\" OD X 16 SWG Copper coil with end fittings including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 78 | Supply, Installation and testing of Injector nozzle including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 79 | Supply, Installation and testing of rigid PVC NRV for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 80 | Supply, Installation and testing of Header isolation valve. (IS3224) including labour, material etc. complete as per the direction of Engineer-in-charge.... |
| 81 | Supply, Installation and testing of yoke clamp. (Tonner clamp) including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 82 | Supply of Lead washers including material etc. complete as per the direction of Engineer-in-charge. |
| 83 | Service/ Repairs to booster pump set including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 84 | Annual maintenance for chlorinator at Vinchur WTP. |
| 85 | Visit Charges to attend Servicing/ Repairing of Chlorinators which includes monthly visit to maintain/ necessary repairs to chlorinators to keep chlorinator in operative condition without any trouble round the clock & to replace parts of chlorinator if necessary and as and when required etc. complete. |
| 86 | Supply, Installation and testing of inlet valve assembly for regulator including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 87 | Supply, Installation and testing of gas flow meter Cap.5 Kg/hr including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 88 | Supply, Installation and testing Non return valve for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 89 | Supply, Installation and testing Control valve assembly including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 90 | Supply, Installation and testing of \\"O\\" Ring set for complate chlorinator including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 91 | Supply, Installation and testing of 65 mm Dial water pressure gauge including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 92 | Supply, Installation and testing of 3/8\\" OD X 16 SWG Copper coil with end fittings including labour, material etc. complete as per the direction of Engineer-in-charge. |
| 93 | Supply, Installation and testing of Injector nozzle including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 94 | Supply, Installation and testing of rigid PVC NRV for vacuum line including labour, material etc. complete as per the direction of Engineer-in-charge... |
| 95 | Supply, Installation and testing of Header isolation valve. (IS3224) including labour, material etc. complete as per the direction of Engineer-in-charge.... |
| 96 | Supply, Installation and testing of yoke clamp. (Tonner clamp) including labour, material etc. complete as per the direction of Engineer-in-charge.. |
| 97 | Supply of Lead washers including material etc. complete as per the direction of Engineer-in-charge. |
| 98 | Service/ Repairs to booster pump set including labour, material etc. complete as per the direction of Engineer-in-charge Please Enable Macros to View BoQ information |