Name of Work:- 05-Work-18 Construction of an athletic track on the footpath in Central Park, Ward-84, Rajnagar.
Sl. No.
Item Description
1
Taking out existing CC interlocking paver blocks from footpath/central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge DSR 2023 16.83
2
S/L PC:C (1:6:12) with 40 mm gauge brick ballastfine. sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer-in-charge. AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273)
3
First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer-in-charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a)
4
S/L CC (1:2:4) with 20 mm stone grit, coarse sand & cement etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2022 279 (a).
5
Supply and installation of PU(polyurathane) layar based primar coations on praparad baae Including cteaning of surface and abova Il 8-10 mm thicht bfaëk SBR (styrane buladiene fubbar) granulea 1-3,5 mm thick mixed with minimum 189a aingte eomponent PU binder with two part OedbTe polyurathane raeln forming ad imparmeabla layer and above It calling Of 5-6 horn ihick cdorad EPDM granulas hafing gralx 6f2a 1-3 mm.ehamically banded Mih minimum MO 18% Mih singla coniponant of diphenyt melhana discocynaie and paraffin OI(Or PU bindar) having polimer conian) 20-22%, UV rating minimum 3-5 on 5 gray ecale, voc less then 3g, combustibilily less than 40 mm/min, teet method UL 94 f48 Total eystem thicknase'should not be leee than 15mm ds per IAAF/WA tasi raport)(150 celtifiad for EPDu;. Anti-fungal and anil-miwoblal leelad malariaf ae per entira aatisißction of engineer4n. Charga, 4ncluälng frae oi cost maintananca for Ihrae yaars, after Iha axpiry of defact Ilabllity period of ona yaar. For thfs purpose additional aacurify as pür ehall be deducted es per condition in the contract agreement.
6
Dismantling existing plaster including disposal of refuse as directed by the Engineer-in-charge within a distance of 60 metre (200 feet).
7
12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick wark minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plarit etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW
8
Providing wall putty on new surface with approved quality material of Berger/1.K./Biria or similar make 2 coats AS PER PWD SOR 2022 662 NEW ITEM.
9
Finishing wall with weather coat of approved make arid quality on old surface with two or more coat to give an even shade after throughly brushing the 9. surface free from mortar droping and other foreign matters and sand papered smooth including supply of all materials, labour. Tools & plants etc. required for proper completion of the work.. AS PER PWD SOR
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.