| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1 |
| 2 | S/L P.C.C (1:6:12) with 40mm brick ballast, fine sand of 1.25 f.m and cement in foundation and under floor 2 including all material, Labour, tools & plants etc all completed as per tha direction of in-charge (As per PWD/SOR 2022 pag no. 18 Si no.5.01 Item NO |
| 3 | Cement Concrete with 2cm gauge stone grite & coarse sand at all comp. work. Sl.No.279 A |
| 4 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer-in-charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) |
| 5 | Eearth work in embenkment including remming and 5 dressing the surface the requred level .PWD/SOR. 2022/231(a)+253(a) |
| 6 | S/L of stone ballast 22.4 to 53mm size with stacking 6 for measurement ete all complete as per tha direction of engineer in-charge AS PER PWD SOR 2020 RMR |
| 7 | Supply of screening material with staking for 7 measurement etc.all complete as per tha direction of engineer in charge as PWD SOR 2020 RMR |
| 8 | Supplying & laying of 80mm thick rubber moulded tiles at all comp.M-30 |
| 9 | Ornamental work for painting of statue at all of comp work |
| 10 | 2 cm thick Damp Proof Course with Cement and approved coarse sand 1:2 with and including water proofing as ordered by the Engineer in charge in the proportion as specified by the manufacturer including supply of all materials, labour, Tools & plants etc. required for proper completion of the work and including proper curing & shutterings as necessary. |
| 11 | Diss. Of existing plaster including disposal of refuse, SL.NO.709 |
| 12 | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM) |
| 13 | Providing wall putty on new surface with approved quality material of berger/JK birla or similar make 2 coats as per PWD SOR 2022 662 new item. |
| 14 | Finishing wall with weather coat of approved make and quality on old surface with two or more coat to give an even shade after thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work SOR 2022 ITEMN. 15.24 NEW ITEM |
| 15 | Same as in item 502 above but in M.S.Grills& 15 Stair case railing.SOR 502A, PWD 10.21 |
| 16 | Market rate of fiber sheat at all copleted work. |
| 17 | Supply and fixing 6mm (1/4\\") china white glazed tiles in flooring or in skirting or dado laid with 1:3 cement & approved coarse send mortar finished with white cement slurry jointing and polishing complete Including supply of all material labour & tools and plants 50R 2022-14.15 |
| 18 | Painting or varnishing work in small areas or new wood work with one coat (upto one square metre of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm the SOR 2022/641+642 |
| 19 | GST Please Enable Macros to View BoQ information |