|
| 1 | CIVIL WORKS-DSR |
| 2 | CIVIL WORKS-NDSR |
| 3 | CIVIL WORKS-DSR |
| 4 | 2.7.1/2.7 Earth work in excavation by me |
| 5 | 1.1.2/1.0 CARRIAGE OF MATERIALS 1.1 By M |
| 6 | 5.1.2/5.1 Providing and laying in positi |
| 7 | 4.1.8/4.1 Providing and laying in positi |
| 8 | Extra for providing and mixing wat\\" |
| 9 | 6.32.2/6.32 Brick work with clay flyash |
| 10 | 7.1.1/7.1 Random rubble masonry with har |
| 11 | 8.2.1.1/8.2 Providing and fixing 18 mm t |
| 12 | 8.2.2.1/8.2 Providing and fixing 18 mm t |
| 13 | 11.26.1/11.26 Kota stone slab flooring o |
| 14 | 11.30.1/11.30.1/40mm thk rubbed stone fl |
| 15 | 11.53/11.53 Providing and fixing Glass m |
| 16 | 13.5.2/13.5 15 mm cement plaster on roug |
| 17 | 13.21/Extra for providing and mixing wat |
| 18 | 13.8/13.80 Providing and applying white |
| 19 | 16.3/16.3 Supplying and stacking at site |
| 20 | 16.68/Providing and laying 60mm thick fa |
| 21 | 16.69/16.69 Providing and laying at or n |
| 22 | 13.47.1/13.47 Finishing walls with Premi |
| 23 | DSR-HORTI/2.33/Providing and laying Neel |
| 24 | 5.22A.6/Reinforcement TMT |
| 25 | Item 7753/Stone Boulder 50 mm to 200 mm |
| 26 | CIVIL WORKS-NDSR |
| 27 | NS-1/Providing & laying (Grass Pavers) 6 |
| 28 | NS-2/Providing and laying vitrified floo |
| 29 | NS-3/Design, Engineering, Patterning, Fa |
| 30 | NS-4/Supply of 7.5 HP pumpMake- Kirloska |
| 31 | NS-5/Supply of Starter Panel for 7.5 HP |
| 32 | NS-6/Supply of Crown Jet Nozzle. Make B |
| 33 | NS-7/Supply of Jet Nozzle.Make: Brass Ch |
| 34 | NS-8/Design, Construction and plantation |
| 35 | NS-9/Providing and fixing 21 mm thick fr Please Enable Macros to View BoQ information |