| 1 | Carriage of materials: Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish:1 km |
| 2 | Carriage of materials: Carriage of materials by mechanical transport including loading, unloading and stacking: Earth:1 km |
| 3 | Earth work: Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.: All kinds of soil. |
| 4 | Earth work:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m |
| 5 | Earth work: Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.:All kinds of soil |
| 6 | Earth work:Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 7 | concrete work: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) |
| 8 | concrete work: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 9 | Reinforced Cement Concrete: Centering and shuttering including strutting, propping etc. and removal of form for ::Foundations, footings, bases of columns, etc. for mass concrete |
| 10 | Reinforced Cement Concrete: Centering and shuttering including strutting, propping etc. and removal of form for :: Edges of slabs and breaks in floors and walls:Under 20 cm wide |
| 11 | Reinforced Cement Concrete: Centering and shuttering including strutting, propping etc. and removal of form for ::Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc |
| 12 | Reinforced Cement Concrete: Centering and shuttering including strutting, propping etc. and removal of form for ::Suspended floors, roofs, landings, balconies and access platform |
| 13 | Reinforced Cement Concrete: Centering and shuttering including strutting, propping etc. and removal of form for ::Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 14 | Reinforced Cement Concrete: Centering and shuttering including strutting, propping etc. and removal of form for ::Columns, Pillars, Piers, Abutments, Posts and Struts |
| 15 | Reinforced Cement Concrete: Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., including cost of de-shuttering and decentering at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured).:Suspended floors, roofs, landing, beams and balconies (Plan area to be measured) |
| 16 | Reinforced Cement Concrete:Encasing rolled steel sections, in beams and columns, with cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)), including centering and shuttering complete but excluding cost of reinforcement. CEMENT SHALL BE ISSUED FREE OF COST AT BHEL STORE |
| 17 | Reinforced Cement Concrete: Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.:Thermo Mechanically Treated bars of grade Fe-500D or more. TMT BARS SHALL BE ISSUED FREE OF COST AT BHEL STORE |
| 18 | Reinforced Cement Concrete: Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately).:All works upto plinth level |
| 19 | Reinforced Cement Concrete: Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately).:All works above plinth level upto floor V level |
| 20 | Masonary work: Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in::Cement mortar 1:6 (1 cement : 6 coarse sand), CEMENT SHALL BE ISSUED FREE OF COST AT BHEL STORE |
| 21 | Masonary work: Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in ::Cement mortar 1:6 (1 cement : 6 coarse sand). CEMENT SHALL BE ISSUED FREE OF COST AT BHEL STORE |
| 22 | Steel work: Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. STRUCTURAL STEEL SHALL BE ISSUED FREE OF COST AT BHEL STORE |
| 23 | Finishing: 12 mm cement plaster of mix : :1:6 (1 cement: 6 fine sand), CEMENT SHALL BE ISSUED FREE OF COST AT BHEL STORE |
| 24 | Finishing: 15 mm cement plaster on the rough side of single or half brick wall of mix : :1:6 (1 cement: 6 fine sand). CEMENT SHALL BE ISSUED FREE OF COST AT BHEL STORE |
| 25 | Finishing: Finishing walls with Acrylic Smooth exterior paint of required shade : :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm). |
| 26 | Finishing: Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : :Two or more coats on new work. |
| 27 | Dismantling and Demolishing: Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in- charge. :Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 28 | Dismantling and Demolishing: Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50metres lead as per direction of Engineer - in- charge. |
| 29 | Dismantling and Demolishing: Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer - in -charge. |
| 30 | Dismantling and Demolishing: Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. :In cement mortar. Please Enable Macros to View BoQ information |