| 1 | Hire and Labour charges for supply, fixing and dismantling of 4'40W patty tube light/ Patty LED tube light with fitting with tube on existing supports (One trial day, one starting day & Last day dismantling) |
| 2 | Hire and Labour charges for maintaining the above |
| 3 | Hire and Labour charges for supply, fixing and dismantling of 200W LED Flood Light fitting with suitable cross arm on existing support (One trial day, one starting day & last day dismantling) |
| 4 | Hire and Labour charges for maintaining the above |
| 5 | Hire and Labour charges for supply, fixing, maintenance and dismantling of 6 Mtrs height GI pole as support for fixing focus light fitting (One trial day, one starting day & last day dismantling) |
| 6 | Hire and Labour charges for maintaining the above |
| 7 | Hire and Labour charges for supply, fixing, and dismantling of 16\\" Pedestal fan. (One trial day, one starting day & last day dismantling) |
| 8 | Hire and Labour charges for maintaining the above |
| 9 | Hire and Labour charges for supply, fixing and dismantling of Aircooler with stand complete with all connections (One trial day, one starting day & last day dismantling) |
| 10 | Hire and Labour charges for maintaining the above |
| 11 | Hire and labour charges for supply, fixing and dismantling of 3 nos 5A plug board(One trial day, one starting day & last day dismantling) |
| 12 | Hire and Labour charges for maintaining the above |
| 13 | Hire and labour charges for supply, fixing and dismantling of 15A/ 5A plug board(One trial day, one starting day & last day dismantling) |
| 14 | Hire and Labour charges for maintaining the above |
| 15 | Hire and Labour charges for supply, run off and dismantling of 2X3/20 PVC copper wires on suitable PVC rigid pipe (One trial day, one starting day & last day dismantling) |
| 16 | Hire and Labour charges for maintaining the above |
| 17 | Hire and Labour charges for supply, run off and dismantling of 2X7/20 PVC copper wires on bearer wire (One trial day, one starting day & last day dismantling) |
| 18 | Hire and Labour charges for maintaining the above |
| 19 | Hire and Labour charges for supply, run off and dismantling of 4 X 7/20 PVC copper wires on bearer wire (One trial day, one starting day & last day dismantling) |
| 20 | Hire and Labour charges for maintaining the above |
| 21 | Hire and Labour charges for supply, run off and dismantling of 4 x 17/16 sqmm copper cable complete (One trial day, one starting day & last day dismantling) |
| 22 | Hire and Labour charges for maintaining the above |
| 23 | Hire and Labour charges for supply, run off and dismantling of 4 x 19/16 sqmm copper cable complete (One trial day, one starting day & last day dismantling) |
| 24 | Hire and Labour charges for maintaining the above |
| 25 | Hire and Labour charges for supply, run off and dismantling of 3½ X 50 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling) |
| 26 | Hire and Labour charges for maintaining the above |
| 27 | Hire and Labour charges for supply, run off and dismantling of 4 x 120 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling) |
| 28 | Hire and Labour charges for maintaining the above |
| 29 | Hire and Labour charges for supply, run off and dismantling of 4 x 185 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling) |
| 30 | Hire and Labour charges for maintaining the above |
| 31 | Hire and Labour charges for supply, installation and dismantling of 32A 8 way SPN Distribution board complete with 1No 63A isolator as incoming with 12Nos 6-32A MCB as out going with necessary connection |
| 32 | Hire and Labour charges for maintaining the above |
| 33 | Hire and Labour charges for supply, installation and dismantling of 63A 12 way Horizontal Distribution board complete with 1No 63A isolator as incoming with 12Nos 6-32A MCB as out going with necessary connection. |
| 34 | Hire and Labour charges for maintaining the above |
| 35 | Hire and Labour charges for supply, installation and dismantling of 250A Pedastal panel board complete with 1No 250A TPN switch with 2Nos 32A 3Nos 63A TPN switch with indicator and necessary connection (One trial day, one starting day & last day dismantling) |
| 36 | Hire and Labour charges for maintaining the above |
| 37 | Hire and Labour charges for supply run off and dismantling of 400 A pedestal panel board complete with 1 No 400A TPN switch with 7 Nos 100A TPN switch 3 Nos 63A TPN switch with indicator and necessry connection |
| 38 | Hire and Labour charges for maintaining the above |
| 39 | Hire and labour charges for supply, fixing and dismantling of 100A change over switch with connection (One trial day, one starting day & last day dismantling) |
| 40 | Hire and Labour charges for maintaining the above |
| 41 | Hire and labour charges for supply, fixing and dismantling of 250A change over switch with connection (One trial day, one starting day & last day dismantling) |
| 42 | Hire and Labour charges for maintaining the above |
| 43 | Hire and Labour charges for supply, fixing and dismantling of 5.0 TR Split type AC unit complete with all accessories and connection |
| 44 | Hire and Labour charges for maintaining 5.0TR split type AC unit |
| 45 | Hire and labour charges for supply, fixing operating and dismantling of 62.5KVA Diesel Generator set Excluding Diesel and with Operator charges (One trial day, one starting day & last day dismantling) |
| 46 | Hire and Labour charges for maintaining the above |
| 47 | Hire and labour charges for supply, fixing operating and dismantling of 125KVA towing type diesel generator set Excluding fuel and with operator charges (One trial day, one starting day & last day dismantling) |
| 48 | Hire and Labour charges for maintaining the above |
| 49 | Charges for supply filling of fuel to the Diesel Generator sets provided for all the days of use |
| 50 | Hire and labour charges for supply, installation and dismantling of earth with GI piping earth wires and with watering etc., (One trial day, one starting day & last day dismantling) |
| 51 | Hire and Labour charges for maintaining the above |
| 52 | Hire and labour charges for supply, fixing of and dismantling of public address system with necessary mic-2 Nos Amplifier-1No and speaker - 2Nos etc., on the counting day for announcements (One trial day, one starting day & last day dismantling) |
| 53 | Hire and Labour charges for maintaining the above |
| 54 | Hire and labour charges for supply and assembling testing and dismantling of public address system for the following items 1.Stand mike-2, 2.Cordless mike-2, 3.Amplifier-4, 4. 4X12 Speaker box- 5 Nos etc., on the counting day for announcements including wiring arrangements. |
| 55 | Hire and labour charges for supply, testing and dismantling of 55 inch LED TV |
| 56 | Hire charges for maintaining 55 inch LED TV |
| 57 | Hire labour charges for supply and fixing of 5000 VA (12V/DC) electrical inverter with 4Nos 12V 150AH tubular battery with 1 hour back up on full load operation for mentioned capacity.(One trial day, one starting day & last day dismantling) |
| 58 | Hire and Labour charges for maintaining the above |
| 59 | Maintenance work : Towards Engaging of contract labours for attending fuse of calls maintaining the existing EI and power mains and uninterpted power supply round the clock [ Day & Night duty) |
| 60 | Hire and Labour charges for supply run off and dismantling of 250A Capacity ATS(Auto Transfer Switch) Panel dust and vermin proof cubicle panel board made up of 16SWG Sheet steel for outer boby with doors,switch supports and separations etc.. and with supply and fixing of the following interior mounting switch with bus bar chmber complete with 25x12mm aluminum bus bar complete for 3phase and neutral interior connection to250A incoming SDF from the bus bar and 25x12mm aluminum bus bar complete for interior connection to 250A SDFwith suitable sleeves and hylum separators 1No 25x6mm aluminum earth bus run, all round the panel to rovide double earth connection to all incoming and outgoing SDF from the earth above earth bus including and indication lamps complete. connections etc. as per IE rules and CEIG specifications. |
| 61 | The Panel should be painted with powder coated (Siemens grey colour -7032) with superscription (Lettering and Numbering) danger board.1.250A FP SDF interior only double break-2Nos (Double incoming) FP ATS Switch unit interior only-1No (Out going) The above cubicle panel board rest on suitable masonry pedestal work with MS Channel base( switches should be L& T Make or equivalent ) |
| 62 | Alteration in existing 125 KVA Genset for installation of GENSET ON/OFF control relay with necessary wiring and testing complete |
| 63 | Hire and labour charges for providing and dismantling of temporary GI sheet shed for protecting panel boards |
| 64 | Rewiring with 2x1.5 sq.mm. (22/0.3) PVC insulated unsheathed SC copper conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with 5 FT switch inflush with wall covered with hylum sheet of 3 mm thick with painting of suitable colour for open PVC light / fan point (for electronic regulator) (5 points per coil). |
| 65 | Rewiring with 2x1.5 sq.mm. (22/0.3) PVC insulated SC unsheathed copper conductor of 1100V grade insuitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with all with 150mm x 100 mm x 113mm TW switch box with 3mm thick hylem sheet cover for 5A3 pin noninter locking wall socket with 5A flush type switch with continous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point |
| 66 | Renewal by supply and run of 2 of 1.5 sqmm (22/0.3) PVC insulated SC unsheathed Cu. Conductor of 1100V Grade in suitable PVC rigid pipe on wall and ceiling with continuous earth wire connection of 14 SWG TC wire with painting of suitable colour. |
| 67 | Renewal by Supply and fixing of Stepped Electronic 300W / 450W Square Type Fan Regulator (Anchor Deluxe / Equivalent) on Existing AC Ceiling fan with connection. |
| 68 | Renewal by Supply and fixing of 3Nos. 5Amps (3Pin and 2Pin) combined flush type wall socket with control switches concealed in suitable TW Box covered with Hylam sheet in flush with wall with earth connection (For Computer Plug Socket). |
| 69 | Renewal by Supply and fixing of 5A / 15 A 3 Pin combined flush type wall socket with 15A flush type switch concealed in suitable MS Box in flush with wall and covered with 3 mm thick hylem sheet. |
| 70 | Renewal by Supply and run of 2 of 2.5 sqmm (36/0.3) PVC insulated SC unsheathed Cu. Conductor of 1100V Grade in suitable PVC rigid pipe on wall and ceiling with continuous earth wire connection of 14 SWG TC wire with painting of suitable colour. |
| 71 | Renewal Supply and runof 2 of 4 sq.mm. (56/0.3) PVCinsulated Cunsheathed copper conductor of 1100V grade insuitable heavygauge MS conduit pipe concealed inwall and ceiling with continuouse artwire connection by14 SWG TC wire and making good of the concealed portion wiith suitable colour |
| 72 | Dismantling and refixing of existing AC ceiling fans in the Class rooms in complete. |
| 73 | Dismantling and refixing of existing network cables in the computer room and labs in complete. |
| 74 | GST 18% Please Enable Macros to View BoQ information |