|
| 1 | Item Description/ Heading |
| 2 | Lettering with black Japan paint of approved brand and manufacture . (6 letters/pole of each letter size 6 cm for LT = 6 X 6 cm = 36 cm per pole) . |
| 3 | Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works for LT . Complete pole painting including channel / bracket. (surface area of 10 metre pole including channel /bracket is 4.85 sqm ) |
| 4 | Painting with aluminium paint of approved brand and manufacture to give an even shade (Two or more coats on new work) on LT .Complete pole painting including channel / bracket. (surface area of 10 metre pole including channel /bracket is 4.85 sqm ) |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work. one metre length of pole to be painted for letter writing. (Surface area for 1m lenth of pole is 0.52 sqm, Colour: green for background of letter writing for all LT poles) |
| 6 | Providing and fixing danger notice plate of 250 mm X 200 mm, made of mild steel, at least 2 mm thick, and vitreous enameled white on both sides, and with inscription in single red colour on front side as required. |
| 7 | Supply and fixing of reflective radium tape of 2 inch size on all LT poles . Green color required . Length of reflective radium tape required per pole is 2 metre. |
| 8 | Supply of LED strip/rope light SMD 5050 of IP68 waterproof rating contains 120 nos. of LEDs per metre length. |
| 9 | Supply of adaptor cum wire connector for strip/rope light. |
| 10 | Supply of 13’’ pull tight plastic strap seal . |
| 11 | Supply of 2.5Sq mm 2 core aluminium cable . |
| 12 | Supply of Power connect junction box of 75 mm X 75 mm X 50 mm size for strip/rope light connection. |
| 13 | Fixing of LED strip/rope lights SMD 5050 of IP68 waterproof rating contains 120 nos. of LEDs per metre length , adaptor cum wire connector for strip/rope light with 2.5 core sqmm 2 core aluminium cable through power connect junction box, 13\\" pull tight plastic strap seal on pole to fix rope light on pole etc as required. length of strip/rope light per pole required is 6 meter. |
| 14 | Strengthning of pole by means of muffing :- (a) Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. for all kinds of soil. VOLUME OF EXCAVATING PER POLE = 0.75mX0.75mX0.60m = 0.3375 m3(b) Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth .1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40mm nominal size derived from natural sources).below ground volume per pole = 0.75mX0.75mX0.60m = 0.3375 m3 (c) Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth . 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) . above ground volume per pole required = 0.75mX0.75mX1m = 0.5625m3 (d) Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns. For 1 pole = 4X0.75mX1m= 3m2 |
| 15 | Cutting and trimming of tree branches under the overhead lines and bush cutting /cleaning of pole base /transformer base etc as required. |
| 16 | Replacement/Erection of Damage/Puncture LV/MV Pin/Shackel Insulator etc as required. |
| 17 | Restratening/erection of Sagging LT ACSR Overhead conductor size of 7/3.35mm to 7/4.00 mm Diameter incuding binding etc as required |
| 18 | Supply and febrication of anti-climbing device having 7 nos. of spikes 0.46 metre each for poles installed in mine at different locations of balram ocp . Support around thorn should be given in 2 layers using 25mmX6mm MS flat . |
| 19 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |