| 1 | Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. |
| 2 | WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Manual Means |
| 3 | WBM Grading 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means |
| 4 | Tack coat using VG-10 grade bitumen Over dry and hungry bituminous surfaces @0.40 kg/sqm |
| 5 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, layingand rollingof open-graded premix carpet of 20mm thickness composed of 13.2 mm to 5.6mm aggregate seithe rusing penetration grade bitumenor emulsion to required line, gradeand level to serveaswearing courseona previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coatofeither TypeA or TypeB or TypeC as per Technical Specification Clause 508.Bitumen (VG-10) |
| 6 | Seal CoatProviding and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall usingTypeA, Type B and Type C as per Technical Specification Clause 510 |
| 7 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer- in- charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction |
| 8 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6 |
| 9 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 20 Nominal mix (1:2:4) |
| 10 | Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 |
| 11 | Cleaning of fully choked scupper and catchpit complete as directed by the Engineer-in-charge. |
| 12 | Cleaning of partially choked scupper and catchpit complete as directed by the Engineer-in-charge. |
| 13 | Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standarddesign as per IRC:8 fixing in position including painting and printing, etc as perdrawing and Technical Specification Clause 1703 |
| 14 | Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307 Manual Means |
| 15 | painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture Please Enable Macros to View BoQ information |