Tender For Note- The Contractor Shall Quote His/ Their Rates Without Gst. Gst Will Be Paid Extra By The Department As Per Prevailing Rate At The Time Of Payment. , Standard Unit Rates For Construction Of 2 Lane Class A 70R Loading Motor Bridge Phase-
Tender Overview
Project Description
Tender for Note- The Contractor Shall Quote His/ Their Rates Without Gst. Gst Will Be Paid Extra By The Department As Per Prevailing Rate At The Time Of Payment. , Standard Unit Rates For Construction Of 2 Lane Class A 70R Loading Motor Bridge Phase-I (Excluding Design And Drawing Of Superstructure) Motor Bridge At Km.49 Hm.8-10 Binta Bridge , Standard Unit Rates For Construction Of 2 Lane Class A 70R Loading Motor Bridge Phase-I (Excluding Design And Drawing Of Superstructure) Motor Bridge At Km.34 Someshwar , Standard Unit Rates For Construction Of 2 Lane Class A 70R Loading Motor Bridge Phase-I (Excluding Design And Drawing Of Superstructure) Motor Bridge At Km.25 Chipta Bhulgaon(12M.Span) Motor Bridge At Km.29 Bhanura Khanya(15M.Span) Motor Bridge At Km.29 Kakrai(12M.Span) Motor Bridge At Km.37 Sutoli(15M.Span) Motor Bridge At Km.39 Buwarn Bridge(12M.Span) Motor Bridge At Km.40 Dhounigarh(18M.Span) Motor Bridge At Km.42 Shukrar(24M.Span) Motor Bridge At Km.50 Bhatura Binta(15M.Span)
BOQ
| Sl. No. | Item Description |
| 1 | Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. |
| 2 | Standard Unit rates for construction of 2 lane class A 70R loading Motor Bridge Phase-I (Excluding Design and Drawing of Superstructure)Motor Bridge at Km.49 Hm.8-10 Binta Bridge |
| 3 | Standard Unit rates for construction of 2 lane class A 70R loading Motor Bridge Phase-I (Excluding Design and Drawing of Superstructure)Motor Bridge at Km.34 Someshwar |
| 4 | Standard Unit rates for construction of 2 lane class A 70R loading Motor Bridge Phase-I (Excluding Design and Drawing of Superstructure)Motor Bridge at Km.25 Chipta Bhulgaon(12M.span)Motor Bridge at Km.29 Bhanura Khanya(15M.span)Motor Bridge at Km.29 Kakrai(12M.span)Motor Bridge at Km.37 Sutoli(15M.span)Motor Bridge at Km.39 Buwarn Bridge(12M.span)Motor Bridge at Km.40 Dhounigarh(18M.span)Motor Bridge at Km.42 Shukrar(24M.span)Motor Bridge at Km.50 Bhatura Binta(15M.span) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender