| 1 | Earth work in excavation by mechanical means (Hydrautio excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge, Ordinary rock For 11 Nos FDLs which are located above 1.00 Km up to 4.00 Km from road head |
| 2 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m, All kinds of soil. For 13 Nos FDLs which are located upto 1.00 Km from road head |
| 3 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m, All kinds of soil. For 11 Nos FDLs which are located above 1.00 Km up to 4.00 Km from road head |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). For 6 Nos FDLs which are located above 0.20 KM upto 1.00 KM from road head. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1.2.4 (1 cement: 2 coarse sand (zone-III) derived from natural sources 4 graded stone aggregate 20 mm nominal size derived from natural sources). For 5 Nos FDLs which are located above 1.00 Km up to 2.50 Km from road head |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level. 1:2:4 (1 cement. 2 coarse sand (zone-III) derived from natural sources 4 graded stone aggregate 20 mm nominal size derived from natural sources). For 6 Nos FDLs which are located above 2.50 Km up to 4.00 Km from road head |
| 7 | Centering and shuttering including strutting, propping elc and removal of form for, Foundations, footings, bases of columns, etc for mass concrete. For 6 Nos FDLs which are located above 0.20 Km up to 1.00 Km from road head |
| 8 | Centering and shuttering including strutting, propping elc and removal of form for, Foundations, footings, bases of columns, etc for mass concrete. For 5 Nos FDLs which are located above 1.00 Km up to 2.50 Km from road head |
| 9 | Centering and shuttering including strutting, propping elc and removal of form for, Foundations, footings, bases of columns, etc for mass concrete. For 6 Nos FDLs which are located above 2.50 Km up to 4.00 Km from road head |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. For 7 Nos FDLs which are located up to 0.20 Km from road head |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. For 6 Nos FDLs which are located above 0.20 Km up to 1.00 Km from road head |
| 12 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. For 5 Nos FDLs which are located above 1 Km up to 2.50 Km from road head |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. For 6 Nos FDLs which are located above 2.50 Km up to 4.00 Km from road head Please Enable Macros to View BoQ information |