| 1 | Creation of 63 KVA Substation along with HT/LT Network Near Selfie Point along Chandanwari Pissu top Track in connection with SANJY-2026. |
| 2 | Supply,loading, unloading at site ,installtion, testing & commissioning of 63kVA,11/0.433KV, 3-phase Distribution Transformers (level-II) with LV Cable box having detachable Aluminium Gland Plate |
| 3 | Supply and fixing of 11 KV Link Set Line Type HD |
| 4 | Supply and fixing of 25 mm² Single-Core Cable, 1.1kV Grade, XLPE armoured FRLS type |
| 5 | Supply,loading, unloading at site Erection, testing & commissioning of S.T Pole 8mtr Long SP-15 with base plate & cap for LT. Strictly as per REC standards |
| 6 | Supply,loading , unloading at site ,Laying, stringing, tensioning & binding of ACSR 30mmsq (weasel) Conductor. |
| 7 | Supply/Fixing & commissioning of GI Channel/Angle/Flat of Sizes including clamps |
| 8 | Supply and fixing of GI Angle Iron for H frame cross belt including clamps |
| 9 | Supplying and fixing of GI Channel “V’ cross-arm (75 x 40x6mm) with GI Angle Pole Top Bracket (50x50x6 mm) including back clamps of 50X8 mm for fixing V-Cross arm and pole top bracket without making holes in the ST pole as per REC standard for single pole [email protected] kg each |
| 10 | Supplying and fixing of pole Earthing Complete by Spike Earthing Rod 20mm 2.5 Mtr long with GI strip (25x3)mm to each LT and HT pole |
| 11 | Painting of poles with one coat of red oxide and two coats of Aluminium paint as per Standards. This also includes numbering of ploes with paint, submission of Pre and Post Execution photographs duly anthenticated by AEE concrened. |
| 12 | Supply,fixing, testing & commissioning of 11KV GO Set, AB Switch as per IS Standards |
| 13 | Supply,fixing, testing & commissioning of 11KV DO Fuse Set as per IS Standards |
| 14 | Supply,fixing, testing & commissioning of 11KV LA Set Gap less as per IS Standards |
| 15 | Supply,fixing, testing & commissioning of 11KV Pin Polymer Insulators with GI pins complete. |
| 16 | Cement bottoming 1:2:4 mix as per REC Standards 0.4cum/pole |
| 17 | Supply and fixing of 70 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type |
| 18 | Supply and fixing of 1Core 16 sqmm PVC Cable from Cable taping point through Piericing connector to consumer meter |
| 19 | Providing & fixing of 11 kV polymeric composite disc insulator 12 kV , min failing load 45 kN, lighting impulse 75 kV positive and 80 kV negative, creepage distance 320mm |
| 20 | Providing & fixing of LT Shackle with mukhi clamps including nuts & bolts |
| 21 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm No.minal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. |
| 22 | Providing and Fixing of GI Nuts and Bolts. |
| 23 | Providing and Fixing of Wedge Connectors / PG Clamp |
| 24 | Supply, installtion of Danger Plates with Clamps |
| 25 | Providing and fixing of GI Barbed Wire for Anti Climbing |
| 26 | Supply and fixing of LT Fuse Unit as per the approved drawings of KPDCL |
| 27 | Supply and fixing of Suspension / Tension clamps with eye hook including GI Supporting Clamps Please Enable Macros to View BoQ information |