| 1 | Supply of following Decentralized materials Provide by Contractor at the works site as per RESSPO norms. |
| 2 | X-arms holding clamps with bolts & nuts for ST/PCC pole |
| 3 | M.S clamp for T-off channel with bolts & nuts for ST/PCC pole |
| 4 | Stone pad, 300x300x75 mm |
| 5 | F-bracket with bolts & nuts for ST/PCC pole |
| 6 | Danger Board with clamps & bolts for ST/PCC pole |
| 7 | Gaurding Angle Clamps for ST/PCC pole |
| 8 | E-bracket with bolts & nuts |
| 9 | Clamps with nuts & bolts for Top /Dropper Channel for ST/PCC pole |
| 10 | PG clamps |
| 11 | Stay Clamp |
| 12 | LT Clamp |
| 13 | LT shackle insulator |
| 14 | Suspension clamp with nuts & bolts |
| 15 | J Hook |
| 16 | Dead end clamp |
| 17 | Eye- Hook |
| 18 | Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge. |
| 19 | ST Pole 11 mtr long |
| 20 | PCC Pole 8.5 mtr long |
| 21 | Line materials with ACSR Weasel Conductor/AB Cable different size etc. |
| 22 | Transformer 10 KVA |
| 23 | Transformer 25 KVA |
| 24 | Transformer 63 KVA |
| 25 | Transformer 100 KVA |
| 26 | Transformer 250 KVA |
| 27 | Transformer 400 KVA |
| 28 | 11 KV XLPE Cable size 3x70/120/185 mm2 |
| 29 | 11 KV Pilfer proof metering cubicle |
| 30 | 11 KV CT/PT combined unit |
| 31 | Erection |
| 32 | Erection of single support ST/PCC pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work. |
| 33 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 34 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 35 | Earthing of Poles |
| 36 | Erection of Sectional Double Pole Structure of ST/PCC pole including digging of pit, fitting of accessories, back filling of earth, earthing, grouting of each pole & all stay sets (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) & other required works. |
| 37 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering. |
| 38 | Stringing & sagging of LT line upto proper sag including laying of ACSR Weasel/Dog Conductor, binding with insulators & jumpering. |
| 39 | Laying, Streaching of Arial Bunch Cable size 1x25+1x16/ 3x50+1x35+1x16/ 3x95+1x70+1x16/3x120+1x95+1x16 mm2 as per RESSPO norms. |
| 40 | Drill/cut of stone for erection of Pole/Stay in hilly area |
| 41 | Mounting of 10 KVA Transformer alongwith HT & LT connections as per RESSPO norms. |
| 42 | Mounting of 25 KVA Transformer alongwith HT & LT connections as per RESSPO norms. |
| 43 | Mounting of 63 KVA Transformer alongwith HT & LT connections as per RESSPO norms. |
| 44 | Mounting of 100 KVA Transformer alongwith HT & LT connections as per RESSPO norms. |
| 45 | Mounting of 250 KVA Transformer alongwith HT & LT connections as per RESSPO norms. |
| 46 | Mounting of 400 KVA Transformer alongwith HT & LT connections as per RESSPO norms. |
| 47 | Laying of 11 KV XLPE Cable alongwith cost of bricks & sand as per RESSPO norms |
| 48 | Gaurding of 11 KV line as per RESSPO norms |
| 49 | Filling of cable jointing kit size 3x70/120/185 mm2 11 KV indoor & outdoor type as per RESPO norms |
| 50 | Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing rag bolts after checking alignment with trench & conneting incomming & outgoing cable in the CT chamber as per RESPO norms |
| 51 | Installation of CT/PT combined unit as per RESPO norms |
| 52 | Construction of Transformer plinth for 100/250/400 KVA Transformers of 2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials. |
| 53 | Well type earthing of 100/250/400 KVA Transformers by using B class G.I. pipe of 1.5 \\" dia and making hand pipe type earth boring IInd strata of water or 60 ft. whichever is deeper about 6\\" of G.I. pipe shall remain above ground level 2 No. G.I. earth clamp shall also be welded to the portion of pipe which is above the ground level. Through this G.I. Clamp and G.I. Strip 30x5mm duly galvanized shall be connected with nut & bolts. Every DT shall have 2 such earthing, One earthing for T/F neutral and second earthing for T/F body. All requred materials shall by provided by the contractor. |
| 54 | Fencing of T/F with M.S. Square mesh welded/fixed on M.S. Angle of size 65x65x6 mm with gate hinges & shutter assembly, of over all size 3x3x2.5 mtr as per drawing |
| 55 | Dismantal of old 11 KV/ LT line |
| 56 | Received back material of ACSR Weasel/Dog Condutor/AB Cable etc from work site to ESC, Mirzapur |
| 57 | Received back material of Scrap Iron etc from work site to ESC, Mirzapur Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing rag bolts after checking alignment with trench & conneting incomming & outgoing cable in the CT chamber Please Enable Macros to View BoQ information |