| 1 | ELECRICAL & MECHANICAL WORK |
| 2 | SITC of CE / UL approved manufacturer's PLC (Manufacturer having Achille level-II / IEC 62443-4-2 Cyber security and its certification from International Security Alliance ISA Level-II or Equivalent is required) in IP 54 enclousuer suitable to communicate with GSM/GPRS based modem unit with CPU and power supply with analog and digital parameter and features as specified, one for each tubewell / OHT & stand alone OHT to Store and transmit data on GSM backbone. PLC designed with logic to transfer data at multiple stations as specified (In PLC Minimum Memory 32 MB Non volatile on board memory required). |
| 3 | SITC of GSM based wirless /broadband /Equivalent communication with 4G/5G modem for PLC capable to transfer & receive data and gather data from remote sites to control stations. All accessories inculded signal enhancer antenna along with running expences till Completion of O&M Period. |
| 4 | SITC of CE/UL Certified inteligent smart energy meter |
| 5 | OHT Outlet Valve-Designing and Supplying of Scada Compatible, actuator mounted with analog type positioning card (% opening type), Ductile Iron, integrel starter, metal seated Globe Valve with extended spindle if required at OHT delivery line, with only RS-485 Communication system as per latest IS specification |
| 6 | (i) size 150 mm |
| 7 | (ii) size 200 mm |
| 8 | (iii) size 300 mm |
| 9 | (iv) size 350 mm |
| 10 | (v) size 400 mm |
| 11 | (vi) size 450 mm |
| 12 | (vii) size 500 mm |
| 13 | (viii) size 550 mm |
| 14 | (ix) size 600 mm |
| 15 | installation, testing & commissioning of above valves |
| 16 | SITC of CE/UL Certified Electromagnetic Flowmeters (with RS-485 communication facility) for tubewells and OHT with required dismantling joint, reducer etc complete. Tubewell flowmeters and OHT flowmeters shall be run by DC 24 V mode only. |
| 17 | (i) size 100 mm |
| 18 | (ii) size 150 mm |
| 19 | (iii) size 200 mm |
| 20 | (iv) size 300 mm |
| 21 | (v) size 350 mm |
| 22 | (vi) size 400 mm |
| 23 | (vii) size 450 mm |
| 24 | (viii)size 500 mm |
| 25 | Modification of STAR DELTA Starter |
| 26 | Modification of exiting star delta stater at different tubewells location SCADA compatible & integration with proposed automation(RTU/PLC) panel including control cables,lugs selector switch etc complete in all respect |
| 27 | Auto phase reversal unit with inbuilt time delay & enclousre rating |
| 28 | (i) 125 Amp |
| 29 | (ii) 160 Amp |
| 30 | (iii) 250 Amp |
| 31 | CE/UL Certified radar type level transmeter at 24 V DC for OHT |
| 32 | CE/UL Certified Smart Pressure Transmitter with mandatory snubber of reputed make & inbuilt diaphragm seal having display at site at OHT and tubewells having RS-485 communication module at 24 V DC. |
| 33 | CE/UL Certified Hydrostatic type sub soil water level transmitter at 24 V DC at RS-485 communication module for water level measurment. |
| 34 | CE/UL approved manfacturer's Surge protector for all AC control supplies and 3 phase and neutarl both at control panel. |
| 35 | CE/UL Certified 7'' HMI touch screen suitable to communication with PLC/RTU for local display & control process parameters |
| 36 | Control Panel |
| 37 | a). Control panel with IP 54 protection, industrial grade for all equipment seprate for control (24 V DC) and power equipments having SMPS and required capacity APFC system complete. This panel should have under voltage & over voltage preotection and single phase protection etc. complete in all respected for all equipments. b). Control panel should have seperate box for OHT Valve feeder with additional under voltage, over voltage jamming, simple phase and phase reversal protection. c). Before stabilizer a control panel with microprocessor (NC/NO) based safety panel is also required to prevent 11 KV voltage at inlet of the whole electrical system. |
| 38 | Installation, commissioning & testing of Tubewell |
| 39 | Installation, commissioning & testing of OHT |
| 40 | Trial and run of tubewell period for 3 month with operation & maintanance |
| 41 | Trial and run of oht period for 3 month with operation & maintanance |
| 42 | SITC of 150 mm dia metal seated Sluice valve in place of irrepairable valve |
| 43 | SITC of Security Survelliance IP Camera with required hard drive to store data of atleast one month.for each tubewell and OHT. |
| 44 | 3 Sets Solar LED Lighting in OHT Campus with solar Panel and battery complete in all respect |
| 45 | Design supply installation commissioning & testing of Turbidity Analyser as per ISO 7027 Scattering light method at AF and interfacing with PLC Panel.Turbidity Analyser shall comprises of 3 components i.e. sensors ,signal distributor and transmitter with indicator with 2 outputs 1 to PLC & another to local display including mounting arrangement.MOC of sensor will be only titanium. Over all range : 0-100 NTU Accuracy : +/- 0.02 NTU, Supply Voltage :230V ac Output, Communication System only RS 485 with modbus protocol. |
| 46 | SERVO VOLTAGE STABILIZER OF CURRENTLY RUNNING TUBEWELLS |
| 47 | SITC of 50 kVA Fully Automatic Servo Voltage Stabilizer with RS- 485 port (Input Voltage range 300 V to 450 V / Output 400 V+1%), suitable capacity Neutral Transformer is compulsory with transformer. |
| 48 | SITC of 60 kVA Fully Automatic Servo Voltage Stabilizer with RS- 485 port (Input Voltage range 300 V to 450 V / Output 400 V+1%), suitable capacity Neutral Transformer is compulsory with transformer. |
| 49 | AUTOMATIC CHLORINATION SYSTEM |
| 50 | SITC of Automatic Chlorination System compatible to SCADA system at 24 V DC at RS-485 communication module. |
| 51 | WATER QUALITY ANALYSER |
| 52 | SITC of Chlorine analyser interfacing with PLC panel. Residual Chlorine meter shall comprises of 3 components i.e. sensor, flow through assembly and transmitter with indicator and gives 2 outputs one to local display and other to PLC including mounting arrangement. Range- 0 to 8 ppm, Accuracy 2% of full scale, 230 Volt AC, Output only RS-485 with modbus protocol . Analyser should be membrane type with enbuilt PH compensation with 2 gold plated electrodes for long term stability and reference electrode ( Ag/ Agcl) must be provided to avoid maintenance. IP 68 class housing protection required. |
| 53 | POWER BACKUP UPS AND OTHER MISCELLANEOUS WORK |
| 54 | Providing, installation, testing and commissioning of 1 KVA UPS SYSTEM, Single Phase 230 V, 50 Hz with 4 hour backup SMF battery bank for PLC and instruments at tubewells and OHT. |
| 55 | Cabling |
| 56 | Complete cabling for tubewell including all power & control cables of all equipments at pumphouse and OHT. |
| 57 | Repairing of 100 mm/ 150 mm/ 200 mm size Existing sluice valves at tubewells with required T&P and other accessories. |
| 58 | Reparing of Sluice Valves at 115 TWs |
| 59 | LOCAL CONTROL STATION |
| 60 | CE/UL & BIS Certified 85\\" industrial grade LARGE SIZE LED MONITOR with lates configuration as per specification. |
| 61 | Desktop/PC with i5/i7 processor for as per spec. |
| 62 | CE/UL Certified 3 KVA UPS with batteries as per spec mentioned in tachnical bid documents with at least 4 hours battery backup. |
| 63 | Full development version of unlimited TAGS SCADA Software with customization of software for LCS as per spec mentioned in technical bid documents. Make of Software will be same as per make of PLC. |
| 64 | GSM based wireless/Broadband/Equivalent communication system, capable to transfer & receive data & gather data form remote sites to control station,All accessories include signal enhancer antenna along with running expences till completion of O&M period. |
| 65 | CE/UL certified Firewall for network protection with enbuilt field gateway to send data at CCS. |
| 66 | Surge protector for eternet communication protection. |
| 67 | industrial grade Ethernet Switch. |
| 68 | canon/hp Laser printer1018 or equivalent |
| 69 | Installation,Commissioning ,testing including required furniture,internal wiring,PVC panelling of walls work And Split Air Conditioner. |
| 70 | Security Survelliance IP Camera with required hard drive to store data of atleast one month. |
| 71 | Trial and Run for 3 month period |
| 72 | Civil Work |
| 73 | SLUICE VALVE CHAMBER |
| 74 | Excavation in foundation in ordinary soil (loam,clay or sand ) including lift up to 2.20 m & lead up to 50 m,refilling,watering and ramming of evcavated earth into the trenches or space betwwen the building and sides of foundation trenches or into the plinth and disposal of surplus earth up to the distance of 50mfrom the center of the foundation trenches. |
| 75 | Concrete with 40 mm gauge stone ballast,coare sand and cement in proportion in 8:4:1 in foundation including supply of all material,labour T & P etc.required for proper completion of work |
| 76 | R C C with 20 mm gauge stone ballast,coarse sand and cement in proportion (4:2:1) in chamber including supply of all material,labour T & P etc. required forproper completion of work. |
| 77 | Ist. Class brick work in 1:5 cement and local mortar in foundation and plinth including supply of all material,labour T & P etc. required for propercompletion of work. |
| 78 | 12 mm thick plaster with cement and local sand mortar I:3 over brick work minimum thickness not to be less than 10 mm including supply of all material,labour T &P etc. required for proper completion of work. |
| 79 | R C C with 20 mm gauge stone ballast,coarse sand and cement in proportion (3:1.5:1) in slab of chamber including supply of all material,labour T & P etc.required for proper completion of work. |
| 80 | M. S. or iron work in plain work such as R.C.C.or R.B. work (when not included in over all rates) brought to required shape as necessary including bending for proper completion of the work including supply of steeland its wastage. |
| 81 | Dismantling of existing Brick works. |
| 82 | FLOW METER CHAMBER |
| 83 | Excavation in foundation in ordinary soil (loam,clay or sand ) including lift up to 2.20 m & lead up to 50 m,refilling,watering and ramming of evcavated earth into the trenches or space betwwen the building and sides of foundation trenches or into the plinth and disposal of surplus earth up to the distance of 50mfrom the center of the foundation trenches. |
| 84 | Concrete with 40 mm gauge stone ballast,coare sand and cement in proportion in 8:4:1 in foundation including supply of all material,labour T & P etc.required for proper completion of work |
| 85 | R C C with 20 mm gauge stone ballast,coarse sand and cement in proportion (4:2:1) in chamber including supply of all material,labour T & P etc. required forproper completion of work. |
| 86 | Ist. Class brick work in 1:5 cement and coarse sand mortar in foundation and plinth including supply of all material,labour T & P etc. required for propercompletion of work. |
| 87 | 12 mm thick plaster with cement and local sand mortar I:3 over brick work minimum thickness not to be less than 10 mm including supply of all material,labour T &P etc. required for proper completion of work. |
| 88 | R C C with 20 mm gauge stone ballast,coarse sand and cement in proportion (3:1.5:1) in slab of chamber including supply of all material,labour T & P etc.required for proper completion of work. |
| 89 | M. S. or iron work in plain work such as R.C.C.or R.B. work (when not included in over all rates) brought to required shape as necessary including bending for proper completion of the work including supply of steeland its wastage. |
| 90 | Construction Of LCS Room (As perdirection and satisfaction of engineer in charge) |
| 91 | 5 Years Operation and maintenance |
| 92 | 1st year Operation Cost during DLP |
| 93 | 2nd year Operation Cost during DLP |
| 94 | 3rd year Operation and maintenance cost |
| 95 | 4th year Operation and maintenance cost |
| 96 | 5th year Operation and maintenance cost Please Enable Macros to View BoQ information |