|
| 1 | Distribution Transformer (Erection/Labour Part):- Dismantaling of 63 KVA,11/0.4 KV Transformer, Trivector meter & LT cable from transformer Str. to Ground Complete in all respect as directed by the Engineer-In-Charge including all types of risk & incedental at site. |
| 2 | Erection of 100 KVA,11/0.4 KV Distribution Sub Station:- Erection of 100 KVA, 11/0.4 KV Transformer on existing transformer plateform through Mechanical as well as mannual mode , Erection of Switch L.T.Box, Energy Meter , Erection of Transformer, Providing earthing to G.O.Switch, Transformer Lightening Arrestor , Erection of Jumpers, Erection of L.T.Cable Complete in all respect as directed by the Engineer-In-Charge including all types of risk & incedental at site. |
| 3 | Distribution Transformer (Material Part):- Providing 11/0.4 KV, 100 KVA Distribution Transformer ( Ordinary) complete in all respects as per direction of Engineer-In Charge. |
| 4 | Providing L.T. Cable 3.5 Core 120 sqmm |
| 5 | Prov. L.T.Cable 3.5 Core 185 mm² |
| 6 | Prov.Panel(Distribution box LT) with MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp |
| 7 | Prov.Alluminum Thimble 185mm2 |
| 8 | Prov.Copper Thimble 95 mm2 |
| 9 | \\"Erection Part LT\\":- Erection of Steel Tubular Pole L.T.:- Digging of Pit , Drilling of holes in Pole X-Arm , Erection of Pole , Erection of X-Arm , Shackle Insulator,Painting of Pole and Filling of Pit and Ramming Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. |
| 10 | Erection of L.T.Stay Set.:- Digging of Pit , Fixing of Stay road ,Nozzeling & tightening Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. |
| 11 | Dismantalling Charges of 3 Ph LT line (30 mm²) :- De-Stringing , removel of conductor from Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. (3 Phase LT Line) |
| 12 | Re-Sagging of Conductor (30 mm²) for 3 phase L.T.Line:-Stringing and re-Sagging and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. (3 Phase LT Line) |
| 13 | Sagging of Conductor (30 mm²) for L.T.Line (1 Ph to 3 Ph):- Laying of Conductor , Stringing and Sagging and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. |
| 14 | Sagging of G.I.Wire (8 SWG):- Laying of G.I.Wire,Stringing and Sagging and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. |
| 15 | Transportation charges incluiding Loading/unloading of ST pole, conductor etc. with all allied materials |
| 16 | Supply Part LT :- ACSR conductor 6/1/2.59 mm2 (30mm²) |
| 17 | Prov. Steel Tubular Pole 9 Mtr Long |
| 18 | Prov.RCC Muff with Concrete Filling |
| 19 | Prov.Shackle Insulator (18 KN) with D-Iron (U-Clamps) |
| 20 | Prov.Earth Knob |
| 21 | Prov.L.T.Stay Set Complete |
| 22 | Prov.Stay Wire (@ 6 Kg per Stay Set) |
| 23 | Prov. Full clamp for L.T.Stay Set |
| 24 | Prov.Earth wire (G.I.8 SWG) ( Additional 1% ( Sag and Wastage) @ 0.102 Kg/Mtrs |
| 25 | Prov. Spiral PVC Spacer |
| 26 | Prov.Nuts & Bolts of various Sizes(Galvanised)/Coated) 16 mm Φ or more ( With flat and spring washer) |
| 27 | Prov. Alluminium paint |
| 28 | Providing, fixing Sliding door for rack drawing branch ED Joginder Nagar with locking arragement. Please Enable Macros to View BoQ information |