| 1 | Erecrion Part 22/.4 KV 100 KVA Transformer |
| 2 | Manual Carriage Charges from Road Head to Site of Work Complete in all respect |
| 3 | Erection Charges of 100 kVA,22/0.4 KV Transformeras Complete in all respect |
| 4 | Supply Part |
| 5 | Prov.Distribution Transformer (Ordinary), 22/0.4 kV, 100KVA |
| 6 | Prov.Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m) |
| 7 | LT Distribution Panel Box Distribution Box LT100 kVA DTR with MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp) MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating |
| 8 | Prov Lightning Arrestor (Surge Arrester, 18kV,10 KA Station Class Porcelain Type ) |
| 9 | Aluminium Thimble |
| 10 | Copper Thimble 200 Amp |
| 11 | Prov. Pipe Earthing SET |
| 12 | Stay set complete in all respect |
| 13 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 14 | 6 SWG GI wire For Earthing |
| 15 | Danger Plate |
| 16 | Aluminium Paint |
| 17 | Erection Part 22 KV H.T Line |
| 18 | Manual Carriage Of Material For HT Line Considering Average Distance From Road To Site Of Work (Avr.Lead =3km)i.e Total Span =0.230x3.000=0.690)km |
| 19 | Erection Charges Of Single Pole(9/10/11MTR):-Digging Of Pit,Erection Of Pole,Filling Of Pit+Ramming,Drilling Of Holes X-Arm,Fixing Of Insulator, X-Arm,Knee Bracing Set, Top Clamp,Fixing Of Barbed Wire,Danger Plate,Painting Of Pole,complete in all respect |
| 20 | Erection Charges Of Double Pole Str (9/10/11MTR):-Digging Of Pit,Erection Of Pole,Filling Of Pit+Ramming,Drilling Of Holes X-Arm,Fixing Of Insulator, X-Arm,Knee Bracing Set, Top Clamp,Fixing Of Barbed Wire,Danger Plate,Painting Of Pole,complete in all respect |
| 21 | Erection Charges Of ACSR/AAAC 30MM2:-1KM SINGLE ACSR/AAAC 30MM2 .Laying Of Conductor.,Stringing & Sagging,Binding With Insulator complete in all respect |
| 22 | Erection Charges Of Stay Set:-Digging Of Pit,Fixing Of Stay Rod,Filling Of Pit,Nozzeling & Tighting complete in all respect |
| 23 | Erection Charges Of Earthing set :-Digging Of Pit,Fixing Of GI Wire To The Earth System,Filling Of Pit complete in all respect |
| 24 | Erection Charges Of GI Earth Wire:-AAAC 20 MM2 / AAC 25 MM2,Laying Of Conductor,Stringing & SaggingBinding With Insulator,complete in all respect |
| 25 | Supply Part 22kV HT Line |
| 26 | ACSR 6/1/2.59 (30mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} |
| 27 | Steel Tubular Poles (11 m, Working Load >300 kgf/m²) |
| 28 | Muffs (2000mm) with concerete filling |
| 29 | X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length:2800mm x 2 No.] i/c tolerance of 100 mm either side) |
| 30 | Belt Set - MS Angle Iron : 50X50x6, Length:(1800 mm x 2 No. ) |
| 31 | X-Bracing Set - MS Angle Iron: 50X50x6, Length: 2125 mm x 2 No. |
| 32 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Straight stapples & Bend Stapples etc.) x (3 No. conductors) x (2 No. sides) |
| 33 | Stay set complete in all respect (i/c Stay Clamp) (1No. / Single Pole , 4 No. / Double Pole Structures) |
| 34 | Stay Wire (7/4.00mm) (10.0 kg Per Stay Set) |
| 35 | HT Earthing set complete |
| 36 | Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3% (Sag, Earthing, Cross lacing above road and wastage)} @ 0.102 kg/m |
| 37 | Eye Hook for earth wire |
| 38 | GO Switch Handle Supporting: [Channel Iron (75x40x4.8 mm), Length : 460 mm |
| 39 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 40 | Half clamps: [On Double Pole Dead End structure: 4 No |
| 41 | Full clamps: [On Double Pole Dead End structure: 4 No |
| 42 | Danger Plate (250X200X1.6 mm) |
| 43 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 44 | Barbed Wire |
| 45 | Red oxide |
| 46 | Aluminium Paint |
| 47 | Erection Part 3 Phase LT Line |
| 48 | Erection of Steel Pole:-Digging Of Pit,Drilling Of Holes In Pole X-Arm,Erection Of Pole,Erec. Of X-Arm ,Shackle Insulator,Filling Of Pit And Ramming,complete in all respect |
| 49 | Erection Charges of ACSR/AAAC (6/1/3.35)50 MM2:- .Laying Of Conductor.,Stringing & Sagging,Binding With Insulator complete in all respect |
| 50 | Erection Charges of Stay Set:-Digging Of Pit,Fixing Of Stay Rod,Filling Of Pit,Nozzeling & Tighting complete in all respect |
| 51 | Erection Charges of Earthing set :-Digging Of Pit,Fixing Of GI Wire To The Earth System,Filling Of Pit complete in all respect |
| 52 | Erection Charges of GI Earth Wire:-AAAC 20 MM2 / AAC 25 MM2,Laying Of Conductor,Stringing & SaggingBinding With Insulator,complete in all respect |
| 53 | Manual Carriage Of Material For LT Line Considering Average Distance From Road To Site Of Work (Avr.Lead =3.00)i.e Total Span =0.350x3.00=1) |
| 54 | Supply Part LT Line |
| 55 | ACSR 6/1/3.35 (50mm²) { 3% (Sag, Jumpering and wastage} |
| 56 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m) |
| 57 | Muffs (2000mm) with concerete filling |
| 58 | Channel Iron (74x40x5)Length 1.5Mtr+0.2Mtr |
| 59 | Shackle Insulator (16 kN) |
| 60 | D-Iron (U- Clamps) with nut and bolts |
| 61 | Eye hook /Earth Knob for earth wire |
| 62 | LT Stay Set (i/c Stay clamp) |
| 63 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 64 | Egg Insulator |
| 65 | Earthing Set complete |
| 66 | Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3%} for 3%Sag, Wastage & Cross Lacing @ 0.102 kg/m |
| 67 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 68 | Aluminium Paint |
| 69 | Spiral PVC Spacer Please Enable Macros to View BoQ information |