| 1 | Providing and fixing of fencing of Weld Mesh Galvanized Power coated panels size 2500mm x 1800 mm, mesh size 50 mm x 150 mm wire 5 mm dia including excavation, RCC block size 500 x 550 x 300 mm with 1:2:4 complete in all respect. |
| 2 | Desilting and taking out of debris/silt rubbish etc. from water flowing Open Drain by Poklain and disposal of silt / malba at suitable place complete in all respect to the entire satisfaction of Engineer -in -charge. The cleaning / desilting shall be supported by date proof photographs at each location on daily basis inclusive of all material, labour, TandP including provision of safety equipment as per guideline laid in (IS-972*1987) International standard, traffic control arrangements and proper lighting at night, barricading, display of sign board, insurance of workers and cleaning of site by removal from all hindrances/obstructions, unforeseen items permission from other Deptt. shall be arranged with assistance of GMDA. The silt/malba shall be used foe strengthening of bank of drain complete in all respect to the entire satisfaction of Engineer -in -ChargeDesilting of Open Drain 5.50 Mtr. Width Leg-III |
| 3 | Desilting and taking out of debris/silt rubbish etc. from water flowing Open Drain by Poklain and disposal of silt / malba at suitable place complete in all respect to the entire satisfaction of Engineer -in -charge. The cleaning / desilting shall be supported by date proof photographs at each location on daily basis inclusive of all material, labour, TandP including provision of safety equipment as per guideline laid in (IS-972*1987) International standard, traffic control arrangements and proper lighting at night, barricading, display of sign board, insurance of workers and cleaning of site by removal from all hindrances/obstructions, unforeseen items permission from other Deptt. shall be arranged with assistance of GMDA. The silt/malba shall be used foe strengthening of bank of drain complete in all respect to the entire satisfaction of Engineer -in -ChargeDesilting of Open Drain 8.50 Mtr. Width Leg-III |
| 4 | Desilting and taking out of debris/silt rubbish etc. from water flowing Open Drain by Poklain and disposal of silt / malba at suitable place complete in all respect to the entire satisfaction of Engineer -in -charge. The cleaning / desilting shall be supported by date proof photographs at each location on daily basis inclusive of all material, labour, TandP including provision of safety equipment as per guideline laid in (IS-972*1987) International standard, traffic control arrangements and proper lighting at night, barricading, display of sign board, insurance of workers and cleaning of site by removal from all hindrances/obstructions, unforeseen items permission from other Deptt. shall be arranged with assistance of GMDA. The silt/malba shall be used foe strengthening of bank of drain complete in all respect to the entire satisfaction of Engineer -in -ChargeDesilting of Open Drain 20.00 Mtr. Width Leg-III |
| 5 | Desilting and taking out of debris/silt rubbish etc. from water flowing Open Drain by Poklain and disposal of silt / malba at suitable place complete in all respect to the entire satisfaction of Engineer -in -charge. The cleaning / desilting shall be supported by date proof photographs at each location on daily basis inclusive of all material, labour, TandP including provision of safety equipment as per guideline laid in (IS-972*1987) International standard, traffic control arrangements and proper lighting at night, barricading, display of sign board, insurance of workers and cleaning of site by removal from all hindrances/obstructions, unforeseen items permission from other Deptt. shall be arranged with assistance of GMDA. The rates are inclusive the collection, removal, transportation and disposal of silt / malba to hazard free dumping ground complete in all respect to the entire satisfaction of Engineer -in -ChargeDesilting Open Drain Leg-II 7.00 Mtr width from Ashok Vihar Bhimgarh kheri to Railway culvert No.50. |
| 6 | Providing Gunny Bags filled with Jamuna sand and sealing with machinery to be used at the required site as per situation and direction given by Engineer-In-Charge |
| 7 | [10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate] |
| 8 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] |
| 9 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] |
| 10 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] |
| 11 | [5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. [Through Rate] |
| 12 | [5.53.2]Removing hume pipes-NP 2/NP 3/NP 4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge 2. above 600 mm dia [Through Rate] |
| 13 | [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate] |
| 14 | [6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 15 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] Please Enable Macros to View BoQ information |