|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. etc complete as directed by site-in-Charge. |
| 2 | Horticulture works-Trenching in ordinary soil up to a depth of 45 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure) etc., complete as directed by the site in charge. |
| 3 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). (DSR 2025, Code No 2.2, Page No 271) The area is trenched a depth of 0.45 cm and filled with Mixture of 2\\" good earth and 2\\" Manure from the ground remaining area will covered by existing trenched soil. etc. complete as directed by the site in-charge. |
| 4 | Supply of the Vermicompost for lawn area etc., complete as directed by the site in-charge. |
| 5 | Rough dressing the trenched ground including breaking clods etc., complete as directed by the site in-charge. |
| 6 | Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation. etc., complete as directed by the site in-charge. |
| 7 | Fine dressing of the ground etc., complete as directed by the site in-charge. |
| 8 | Spreading of manure and good earth in required thickness (cost of manure and/ or good earth to be paid separately) etc., complete as directed by the site in-charge. |
| 9 | Mixing earth and manure in the required proportion specified or directed by the Officer-in-charge |
| 10 | Supplying of Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and then rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly, as per direction of officer in charge (As per local market rate, supply at site) etc., complete as directed by the site in-charge. |
| 11 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately), in rows 5 cm apart in both directions etc., complete as directed by the site in-charge. |
| 12 | Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth necessary, watering and finally fine dressing, leveling etc., including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50m lift up to 1.5m complete (cost of sludge, manure or extra earth to be paid for necessary. The area is trenched and filled with mixture of good earth and Manure from the ground remaining area will covered by existing trenched soil. etc., complete as directed by the site in-charge. |
| 13 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1by volume (2 parts of stacked volume of earth after reduction by 20%:1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth if any, with all leads and lifts (Cost of manure, sludge or extra good earth if needed to be paid for separately) (DS R 2025 Item no 2.14.2 page no-278 &279 )The area is trenched and filled with Mixture of good earth and Manure from the ground remaining area will covered by existing trenched soil etc., complete as directed by the site in-charge. |
| 14 | Supply Cow Dung Manure for shrubbery, Hedges and planting flowering trees and shrubs etc., complete as directed by the site in-charge. |
| 15 | Cost of flowering and perennial flowering plant etc., complete as directed by the site in-charge. |
| 16 | Plumeria pudica/Cassia fistula / Michelia champaka |
| 17 | Nerium indicum/Tecoma stan/Lawsonia inermis/Gardenia |
| 18 | Cassia biflora |
| 19 | Artabotrys hexapetalus |
| 20 | Bougainvillea multicolour |
| 21 | Mussaenda various colours |
| 22 | Aegle marmelos |
| 23 | Couroupita guianensis |
| 24 | Duranta repens/Cledrodendrum inermis |
| 25 | Hibiscus |
| 26 | Cocos nucifera ( Coconut) |
| 27 | Transportation charges from kadiyam to chejerla |
| 28 | Planting dot & shrubs and tree saplings etc., complete as directed by the site in-charge. |
| 29 | Existing bore well wash by compressor and need a suitable submersible pump set along with accessories etc., complete as directed by the site in-charge. |
| 30 | The existing bore well need to washed with compressor |
| 31 | Providing of suitable borewell submersible pump set with accessories |
| 32 | Providing of 2 or 2.5 inch dia hdpe ’ class suction/delivery pipe ( for submersible pump set) (including sub collar) |
| 33 | Indoor panel box including preventer, strarter, indicator, cutouts wiring charges etc |
| 34 | Outdoor panel box (size 3’ X 2’ X 1.5’) with iron angle legs |
| 35 | Towards cost of 2.5 sqmm flat cable from pump set to panel |
| 36 | Towards cost of specials(like, T, Bend, Solvent etc) for installing open well submersible pump set) |
| 37 | Providing new electrical connection to pump sets Deposite Amount APSPDL |
| 38 | Providing & laying of PVC pipes & Hydrants etc., complete as directed by the site in-charge. |
| 39 | Cost of 63mm rigid P.V.C pipe 6kg/cm2 pipe with ISI std & ISO- 4985 : 2000 (including wastage 60 mtrs) for distributory line |
| 40 | Cost of specials for pipe line( Like T, Bend, Solvent, etc) |
| 41 | Cost of QCV hydrants |
| 42 | Payment of Laying charges |
| 43 | Construction of Ball valve Chmbae |
| 44 | Netafim Flexi sprinklers |
| 45 | Trenching Excavating trenches of required width for pipes, cables including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5m, including getting out the excavated soil, and then returing the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead 50 m: (CPWD DAR 2023 Item no-2.10.1.1, page no-100 ) All kind of soil Pipes, cables etc., exceeding 80 mm dia. but not exceeding 300 mm dia etc., complete as directed by the site in-charge. |
| 46 | Making bajri path including preparation of subgrade, supplying and laying brick aggregate of 50 mm nominal size 7.5 cm deep with blinding material consisting of 12 mm moorum and 12 mm red bajri consolidated with road roller etc., complete as directed by the site in-charge Please Enable Macros to View BoQ information |