| 1 | Retrieval of core stone manually removing from heap by lifting from sea +1.00m to -2.50m by using crane and taking out stone weighing 10 to 3000KG stones conveying to dumping place in the alignment of breaskwater and rearranging as requirede as per the instruction of EIC including cost of all labour charges , cost minor tools, hire charge of crane etc complete (from +3.5m to -2.5m) |
| 2 | Quarying and Collection of the under mentioned quarry product of approved quality from the quarry at mainland and transportation and dumping the same on the alignment of Breakwater at Kalpeni Island for forming the breakwater as per the direction by the EIC, including cost of Quarrying of various sizes of stone boulders at mainland ,cost of removal of over burden, drilling holes on the roack with jack hammer, loading of explosive into the drill holes, blasting, collection, sorting and staking of the quarry prodects, cost of explosive, hire charges of drill rods, hose pipe, air compressor, bull dozer and other accessories etc, collection and loading the quarry product into ships and transportation to site and dumping / placing in position, cost of the wages of the blasters and all other labours, cost of minor tools, hire charges for all the machineries engaged on this work, all taxes/GST, formalities of government at various loacation etc complete. |
| 3 | 10 Kg to 100Kg |
| 4 | Loading, conveying and placing of Tetrapod weighing 8 Ton from casting yard to Break Water site and placing the same in two layers in the sea side of Breakwater as per the direction of Engineer - In - Charge including cost of lifting , transportation charges, hire charges of Truck, Hire charges of Crane, cost of POL for operating the crane, cost of crane operator, helper, cost of hire charges and running expenses of truck POL and operator charges, all labour charges , minor tools etc. complete. |
| 5 | 8 T Tetrapod |
| 6 | Providing and laying RCC with 1:11/2:3 mix (1cement 11/2 Msand,3 20mmchips) for wave deflection wall and kerb wall etc as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), form work, transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete |
| 7 | Providing and fixing mild steel reinforcement for RCC works including cutting, bending, conveying, placing in position, binding with binding wire as directed by the Engineer - In - Charge including cost of all materials, all labour charges, transportation charges of all materials to work site, cost of minor tools etc complete. |
| 8 | PCC 1:2 :4 (M20)(1 cement, 2 pulverised sand and 4 stone aggregate 20 mm size) for wearing coat over the WBM surface behind the wharf including cost of all labour charges for mixing and placing of concrete curing, hire charges and running expenses of concrete mixer machine and vibrator,cost of cement, stone aggregate, pulverised sand, transportation charges of all materials from store to work site etc. complete. |
| 9 | Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials and labour charges etc complete. |
| 10 | Providing and fixing of 30T bollards at the required locations levelling and aligining as directed by the EIC including the cost of transportation of bollards with its bolts from LHW store to site, fixing the same with bollard bolts in concrete, welding charges for fixing bollard bolts, but including cost of bollards, bolts, washers etc., which will be supplied free of cost at LHW stores but including all labour charges, minor tools and plants etc., |
| 11 | Providing and fixing mooring ring in berthing face as per the direction of EIC, including cost of mooring ring and all materials, labour charges and minor tools, providing shuttering arrangements for fixing the mooring rings etc. complete. |
| 12 | Fixing of gaint tyre fender and with all stainless bolts, flanges,washer and accessories in position as directed by the EIC,excluding cost of tyre fender,making holes,cutting,bending and fixing of MS plate,GI Nipples and flange,bolts which will be supplied by the department free of cost at ALHW stores at Androth island but including cost of transportation charges of all materials work site at Kalpeni island,all labour charges,cost of minor tools etc complete. Please Enable Macros to View BoQ information |